| 2004-04-27 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 PLUMBING |
| | FBC-2001 FUEL GAS |
| | FBC-2001 CHAPTER 1 |
| | |
| | 1) ROUTE PLANS TO DBPR HOTEL & RESTURANT |
| | DIVISTION FOR PLAN REVIEW PRIOR TO RE- |
| | SUBMITTING TO THE CITY FOR REVIEW. PLANS |
| | SHALL BE STAMPED AND WORK SHEETS ATTACH- |
| | ED FOR EACH SET. (850) 487-1395 |
| | SECTION 101.4.7 |
| | 2) CONTACT RODNEY COMPO FOR SIZING OF |
| | THE GREASE INTERCEPTOR. NOTED THAT THIS |
| | IS AN EXISTING GREASE INTERCEPTOR, BUT |
| | WASTE ORD # 2938-96 REQUIRES A REVIEW |
| | BY ENVIRONMENTAL COMPLIANCE MANAGER. |
| | 3) SHT A-1.1 INDICATES DEMOLITION WORK |
| | BEING DONE. PLEASE SHOW DEMO WORK ON |
| | PLANS. SECTION 104.2.1 |
| | 4) SHT A-1.2 NOTE STATES "NO NEW GAS |
| | PIPING WORK" BUT SHT P-3 SHOWS GAS |
| | PIPING AND NEW FIXTURES.PLEASE CORREL- |
| | ATE PLANS. |
| | 5) SHT P-2 WATER RISER DIAGRAM, WATER |
| | HAMMER ARRESTORS REQUIRED BY SECTION |
| | 604.9 SHALL BE LOCATED NEAR THE FIXTURES |
| | IN AN "EFFECTIVE RANGE" NOT IN THE CEIL- |
| | ING AS SHOWN. PDI-WH 201 AND MANUF. IN- |
| | STALL. INSTRUCTIONS. |
| | 6) SHT P-2 WATER HEATER DETAIL. INDICATE |
| | THE SIZE OF THE WATER HEATER. SUBMIT |
| | CALCULATIONS FOR BOTTON LOADING OF THE |
| | ROOF JOISTS FOR THE WATER HEATER. SHOW |
| | TOTAL WEIGHT ADDED TO JOISTS. |
| | 7) SHT P-3 SEPARATE GAS PERMIT REQUIRED. |
| | THE FOLLOWING INFORMATION IS REQUIRED. |
| | A. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2001 |
| | FUEL GAS CODE. |
| | B. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE IF BEING USED. |
| | C. TYPE OF GAS, (LP OR NATURAL) |
| | D. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2001 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES (A)(3). |
| | E. INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2001 FUEL GAS CODE SEC. 402.2. |
| | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. |
| | F. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2001 FUEL GAS CODE SEC 402.2 |
| | G. CLEARLY SHOW THE LOCATION AND CAP- |
| | ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| | OR ASME), THE DISTANCE OF THE TANK FROM |
| | THE BUILDING AND ADJACENT PROPERTY LINES |
| | THE DISTANCE OF THE TANK FROM ALL SOUR- |
| | CES OF IGNITION, OTHER CONTAINERS, BUILD |
| | INGS, AND THE LOCATION OF ANY BUILDING |
| | OPENINGS BELOW THE RELIEF VALVE OF THE |
| | TANK PER NFPA 58, TABLE 3-2.2.2. |
| | H. CLEARLY INDICATE ON THE PLAN IF THE |
| | LP TANK IS ABOVE OR BELOW GROUND, AND |
| | SHOW REQUIRED PROTECTION OF THE TANK AND |
| | APPURTENANCES PER NFPA 58. IF THE TANK |
| | IS BELOW GROUND THE CONTAINER SHALL BE |
| | SECURILY ANCHORED PER NFPA 58 SECTION |
| | 3-2.2.7(H). |
| | I. EMERGENCY HOOD SHUT DOWN SHUT OFF |
| | VALVE TO BE BELOW CEILING. MANUAL SHUT |
| | OFF VALVE TO BE UPSTREAM. UNION TO BE |
| | DOWN STREAM OF MANUAL VALVE. |
| | 8) SHT P-4 GENERAL PLUMBING NOTES #4 |
| | AIR CHAMBERS ARE NOT APPROVED. DELETE |
| | REFERENCE. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 653-2692 |
| | E-MAIL [email protected] |