| 2004-03-29 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 PLUMBING |
| | FBC-2001 FUEL GAS |
| | FBC-2001 CHAPTER 1 |
| | FLORIDA ADMINISTRATIVE CODE |
| | FLORIDA STATUTES |
| | |
| | 1) SHT K-2 P-14, 3 SHOWN ON FLOOR PLAN, |
| | BUT PLUMBING SCHEDULE QUANTITY SHOWS 2. |
| | P-46 NOT FOUND ON FLOOR PLAN. |
| | P-47, 2 SHOWN ON FLOOR PLAN IN THE |
| | LOUNGE AREA, BUT SCHEDULE QUANTITY SHOWS |
| | 1. PLEASE CLAIRFY. SECTION 104.2.1 |
| | 2) SHT MP 303 SANT. RISER DOES NOT RE- |
| | FLECT THE FLOOR PLAN. P-19 FIXTURES CON- |
| | NECT DOWNSTREAM OF P-14 ON FLOOR PLAN, |
| | BUT UPSTREAM OF P-14 ON RISER DIAGRAM. |
| | PLEASE CLAIRFY. SECTION 104.2.1 |
| | 3) SHT MP 303 WATER RISER DIAGRAM DOES |
| | NOT REFLECT THE FLOOR PLAN. SEE PREVIOUS |
| | COMMENT, AND P-5 WATER ON FLOOR PLAN |
| | SHOWS P-5 UPSTREAM OF LAST FLOOR SINK, |
| | BUT BETWEEN THE P-14'S ON RISER DIAGRAM. |
| | PLEASE CLAIRFY. SECTION 104.2.1 |
| | 4) GREASE INTECEPTOR REQUIRED SHALL BE |
| | SIZED BY RODNEY COMPO, ENVIRONMENTAL |
| | COMPLIANCE. WASTE ORD #2938-96. PHONE # |
| | (561) 837-4074 |
| | 5) THE FOLLOWING ARE REQUIREMENTS FOR |
| | THE GAS PERMIT. SEPARATE GAS PERMIT REQD |
| | A. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2001 |
| | FUEL GAS CODE. MAKE SURE GAS RISER IS IN |
| | ISOMETRIC FORM. |
| | B. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE IF USED). |
| | C. TYPE OF GAS, (LP OR NATURAL) |
| | D. BTU LOAD OF EACH APPLIANCE AND THE |
| | TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| | THE FBC-2001 FUEL GAS CODE SECS. 401.8 |
| | THRU 402.5.2 AND TABLES 402(1) THRU |
| | 402(34). - BTU'S NOT SHOWN FOR EXHAUST |
| | AND MAKE UP AIR SYSTEM. |
| | E. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2001 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES (A)(3). - MAKE SURE |
| | TO GIVE THE DISTANCE TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING, NOT IN THE KIT- |
| | CHEN. |
| | F. INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2001 FUEL GAS CODE SEC. 402.2. |
| | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. |
| | G. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2001 FUEL GAS CODE SEC 402.2 |
| | H. CLEARLY SHOW THE LOCATION AND CAP- |
| | ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| | OR ASME), THE DISTANCE OF THE TANK FROM |
| | THE BUILDING AND ADJACENT PROPERTY LINES |
| | THE DISTANCE OF THE TANK FROM ALL SOUR- |
| | CES OF IGNITION, OTHER CONTAINERS, BUILD |
| | INGS, AND THE LOCATION OF ANY BUILDING |
| | OPENINGS BELOW THE RELIEF VALVE OF THE |
| | TANK PER NFPA 58, TABLE 3-2.2.2. |
| | I. CLEARLY INDICATE ON THE PLAN IF THE |
| | LP TANK IS ABOVE OR BELOW GROUND, AND |
| | SHOW REQUIRED PROTECTION OF THE TANK AND |
| | APPURTENANCES PER NFPA 58. IF THE TANK |
| | IS BELOW GROUND THE CONTAINER SHALL BE |
| | SECURILY ANCHORED PER NFPA 58 SECTION |
| | 3-2.2.7(H). |
| | J. EMERGENCY HOOD SHUT DOWN SHUT OFF |
| | VALVE TO BE BELOW CEILING. MANUAL SHUT |
| | OFF VALVE TO BE UPSTREAM. UNION TO BE |
| | DOWN STREAM OF MANUAL VALVE. SHOW ON ISO |
| | METRIC. |
| | 6) SHEETS K1, K2, & K,3 ARE NOT SIGNED |
| | AND SEALED AS REQUIRED PER 61G1-16.001 |
| | 7) SHEET MP 303 CERTIFICATE OF AUTHORIZ- |
| | ATION REQUIRED PER 61G15-23.002(2) AND |
| | FS 471.025 |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 653-2692 |
| | E-MAIL [email protected] |