Plan Review Details - Permit 04030117
Plan Review Stops For Permit 04030117
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2004-04-19 Cont ID  
Sent By mmclean Date 2004-04-19 Time 17:03 Rev Time 1.00
Received By bstaples Date   Time   Sent To I
Notes
2004-04-19 00:00:00SENT TO I FOR PROCESSING REVIEWED NEW
 PLANS NO CHANGE TO BUILDING SHEETS. WRS

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2004-04-02 Cont ID  
Sent By kstevens Date 2004-04-17 Time 09:24 Rev Time 1.00
Received By bstaples Date   Time   Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2004-04-20 Cont ID  
Sent By dpalmer Date 2004-04-20 Time 15:10 Rev Time 0.33
Received By dpalmer Date 2004-04-20 Time 15:10 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2004-04-15 Cont ID  
Sent By dpalmer Date 2004-04-15 Time 20:07 Rev Time 0.50
Received By dpalmer Date 2004-04-15 Time 20:07 Sent To P
Notes
2004-04-15 00:00:00********** UNSAT **************
  
 1)NOTE: PLEASE SEE NOTES FROM FIRST
 REVIEW.
 PLEASE SEE FAC 61G15-23.002 FOR ALL
 REQ'D INFORMATION ON TITLE BLOCK FOR
 ENGINEERING FIRM.
 PLEASE ALSO SEE FS 471.023 FOR CA# ALSO
 REQ'D.
  
 2)NOTE: PLEASE SEE THAT A WIRING DIAGRAM
 WAS NOT SUBMITTED TO CLEARLY SHOW ALL
 EQUIPMENT. NOTES ON SKE-204 AND LAYOUT
 TO CORRELATE.
 THERE ARE SOME CIRCILED NOTES, 10,20,21
 DO THESE PERTAIN TO THIS PLAN?
  
 PLEASE SEE FS 553.80(2)(B) FOR PLANS.
 THIS NOTE MUST BE GIVEN AS A NOTICE TO
 PROFESSIONAL ON SECOND REVIEW WITH ANY
 OF THE SAME COMMENTS AS FIRST REVIEW.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2004-03-11 Cont ID  
Sent By csiegber Date 2004-03-09 Time 09:09 Rev Time 0.33
Received By dpalmer Date 2004-03-11 Time 06:05 Sent To  
Notes
2004-03-11 00:00:00*********** UNSAT ************
  
 1)NOTE: PLEASE SEE FAC 61G15-23.002 FOR
 MISSING INFORMATION REQ'D ON TITLE
 BLOCK FOR ENGINEERING FIRM.
 CA# AS REQ'D UNDER FS 471.023
 PLEASE ALSO SEE THAT ENGINEERS SIGNATURE
 IS REQ'D UNDER FS 471.025. PER RULING
 FROM FBPE'S, INITIALS ARE NOT ACCEPTABLE
 AND NAME MUST BE "SIGNED" AS SHOWN ON
 LICENSE.
  
 2)NOTE: PLEASE SUBMIT A WIRING DIAGRAM
 FOR COMPLETE WIRING OF AND FOR EQUIPMENT
  
  
 3)NOTE: PLEASE SHOW/CLARIFY WHERE AND
 HOW NEW EQUIPMENT IS BEING FED.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status N Date 2004-03-12 Cont ID  
Sent By mcarsill Date 2004-03-12 Time 07:28 Rev Time 0.00
Received By mcarsill Date 2004-03-12 Time 07:28 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2004-04-07 Cont ID  
Sent By bstaples Date 2004-04-19 Time 15:59 Rev Time 0.00
Received By csiegber Date 2004-04-07 Time 11:00 Sent To P
Notes
2004-04-07 00:00:00TO KS DESK/RESUB/PER BS

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2004-03-11 Cont ID  
Sent By csiegber Date 2004-03-09 Time 09:09 Rev Time 0.00
Received By csiegber Date 2004-03-09 Time 09:09 Sent To  
Notes
2004-03-11 00:00:00TO COMM BD#1

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2004-03-03 Cont ID  
Sent By mmclean Date 2004-03-08 Time 09:01 Rev Time 0.00
Received By csiegber Date 2004-03-03 Time 09:54 Sent To Z
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2004-04-17 Cont ID  
Sent By kstevens Date 2004-04-17 Time 09:24 Rev Time 1.00
Received By kstevens Date 2004-04-17 Time 09:24 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2004-03-12 Cont ID  
Sent By dpalmer Date 2004-04-15 Time 20:22 Rev Time 1.00
Received By kstevens Date 2004-03-12 Time 17:36 Sent To  
Notes
2004-03-12 00:00:00DENIED
 REFERENCE: FLORIDA ADMINISTRATIVE CODE
 FLORIDA STATUTES
  
 A PROFESSIONAL ENGINEER SHALL SIGN HIS
 NAME AND AFFIX HIS SEAL TO ALL PLANS,
 SPECIFICATIONS, REPORTS AND FINAL BID
 DOCUMENTS PROVIDED TO THE OWNER OR THE
 OWNER'S REPRESENTATIVE, OR OTHER DOCU-
 MENTS PREPARED OR ISSUED BY SAID REGIS-
 TRANT AND BEING FILED FOR PUBLIC RECORD.
 THE DATE THAT THE SIGNATURE AND SEAL IS
 AFFIXED AS PROVIDED HEREIN SHALL BE EN-
 TERED ON SAID PLANS, SPECIFICATIONS, RE-
 PORTS, OR OTHER DOCUMENTS IMMEDIATELY
 UNDER THE SIGNATURE OF THE PROFESSIONAL
 ENGINEER, FAC 61G15-23.002(1)/FS 471.025
  
 EACH SHEET OF PLANS AND PRINTS WHICH
 MUST BE SEALED UNDER THE PROVISIONS OF
 CHAPTER 471 SHALL BE SEALED, SIGNED AND
 DATED BY THE PROFESSIONAL ENGINEER IN
 RESPONSIBLE CHARGE. FAC 61G15-23.002(2)
  
 PER FBPE'S RULING, INITIALS ARE NOT
 ACCEPTABLE. FULL SIGNATURE REQUIRED FOR
 ENGINEER.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]

Review Stop Z ZONING
Rev No 2 Status P Date 2004-04-19 Cont ID  
Sent By mmclean Date 2004-04-19 Time 17:03 Rev Time 0.00
Received By mmclean Date 2004-04-19 Time 17:03 Sent To B
Notes
2004-04-19 00:00:00OK PER JOSH LONG, PLANNER ON REVISION
 GIVEN TO BILL STAPLES MM

Review Stop Z ZONING
Rev No 1 Status P Date 2004-03-08 Cont ID  
Sent By csiegber Date 2004-03-03 Time 09:54 Rev Time 0.00
Received By mmclean Date 2004-03-08 Time 09:01 Sent To I
Notes
2004-03-08 00:00:00APPROVED BY JOSH LONG PLANNER 659-8031


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved