Plan Review Details - Permit 03110561
Plan Review Stops For Permit 03110561
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2004-03-16 Cont ID  
Sent By btrobaug Date 2004-03-16 Time 09:39 Rev Time 2.00
Received By rmcdouga Date 2004-03-16 Time 08:32 Sent To  
Notes
2004-03-16 00:00:00BUILDING PROVISO
  
 SUBMIT STATE OR LOCAL PRODUCT APPROVAL
 FOR WEATHERGUARD STORM PANELS FOR
 REVIEW BEFORE INSTALLING THEM.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-12-23 Cont ID  
Sent By csiegber Date 2004-03-01 Time 12:06 Rev Time 3.00
Received By rmcdouga Date 2003-12-23 Time 14:38 Sent To  
Notes
2003-12-23 00:00:00DENIED
  
 1) 1001.1.3/ 1005.4 ZERO LOT LINE
 EGRESS:WHEN ACCESS TO OR FROM A RE-
 QUIRED EMERGENCY ESCAPE AND RESCUE OPEN-
 ING OF A STRUCTURE TO THE PUBLIC WAY,
 REQUIRES TRANSVERSING A PROPERTY
 (ADJOINING LOT) THAT IS NOT PART OF THE
 ONE WHICH THE STRUCTURE IS LOCATED, AN
 EGRESS EASEMENT THROUGH THE ADJOINING
 PROPERTY IS REQUIRED AND SHALL BE RECORD
 ED IN THE COUNTY RECORDS. THIS EASEMENT
 SHALL BE A MINIMUM OF 3' WIDE AND NOTH-
 ING SHALL BE PLACED WITHIN THE EASEMENT
 AREA WHICH WOULD BLOCK ACCESS TO THE
 EASEMENT AND OR IMPEDE EMERGENCY EGRESS
 FROM THE RESCUE OPENING TO THE PUBLIC
 WAY. NO LANDSCAPING, FENCES OR OTHER
 IMPEDIMENTS SHALL BE INSTALLED IN THIS
 EASEMENT.
 THE COVENANTS FOR VILLAGIO THAT WAS
 SUBMITTED DOES NOT COMPLY WITH THE
 REQUIREMENTS FOR AN EGRESS EASEMENT.
 SUBMIT A REVISED AND RECORDED AMENDMENT
 TO THE COVENANTS THAT MEETS THE ABOVE
 REQUIREMENTS.
  
 2) PRODUCT APPROVALS SUBMITTED WITH
 PERMIT APPLICATION AFTER OCTOBER 1, 2003
 ARE REQUIRED TO COMPLY WITH THE FLORIDA
 PRODUCT APPROVAL SYSTEM. FOR INFORMATION
 PLEASE SEE THE STATE WEBSITE AT
 WWW.FLORIDABUILDING.ORG. PRODUCTS WITH
 STATEWIDE APPROVAL ARE REQUIRED TO BE
 SUBMITTED WITH A COVER SHEET THAT LISTS
 THE PRODUCT IDENTITY NUMBER FROM THE
 STATE. IF THE PRODUCT DOES NOT HAVE
 STATEWIDE APPROVAL, SUBMIT A CITY OF WPB
 APPLICATION FORM FOR LOCAL PRODUCT
 APPROVAL PER FAC RULE 9B-72. SEE
 FORM ATTACHED.
  
 3) SAFEGUARD STORM PANELS ARE NO LONGER
 IN BUSINESS AND DO NOT HAVE A CURRENT
 NOA. SUBMIT THE REQUIRED STORM PANEL
 INFORMATION FROM A COMPANY WITH STATE OR
 LOCAL PRODUCT APPROVAL.
  
 4) THE 36SH WINDOW IN THE DEN EXCEEDS
 THE 20% WALL AREA ALLOWED AS OPENING BY
 FBC TABLE 600. REVISE TO A 26SH OR
 SMALLER WINDOW THAT MEETS EGRESS
 REQUIREMENTS.
  
 5) THE BUILDING CATEGORY IS INCORRECTLY
 GIVEN AS R3 ON SHEET 6. THE BUILDING
 CATEGORY IS II, R3 IS THE OCCUPANCY
 CLASSIFICATION. PLEASE CORRECT.
  
 6) THE TOP AND BOTTOM CHORD DEAD LOADS
 ARE NOT INDICATED ON SHEET 6. PLEASE
 LIST THE BOTTOM CORD LIVE LOAD AS WELL.
 THE BOTTOM CORD L.L. IS 10 PSF WITHOUT
 ATTIC STORAGE AND 30 PSF WITH ATTIC
 STORAGE PER FBC TABLE 1604.1.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2004-03-16 Cont ID  
Sent By btrobaug Date 2004-03-16 Time 09:39 Rev Time 0.50
Received By btrobaug Date 2004-03-16 Time 09:39 Sent To B
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-11-26 Cont ID  
Sent By btrobaug Date 2003-11-26 Time 09:54 Rev Time 0.50
Received By btrobaug Date 2003-11-26 Time 09:54 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2004-03-01 Cont ID  
Sent By csiegber Date 2004-03-01 Time 12:06 Rev Time 0.00
Received By csiegber Date 2004-03-01 Time 12:06 Sent To B
Notes
2004-03-01 00:00:00TO RM DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-12-23 Cont ID  
Sent By mmclean Date 2003-12-23 Time 16:24 Rev Time 0.00
Received By rmcdouga Date 2003-11-12 Time 16:25 Sent To  
Notes
2003-11-18 00:00:0011/12/03 TO Z
 TO SFD RACK/E

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-12-03 Cont ID  
Sent By btrobaug Date 2003-11-26 Time 09:54 Rev Time 0.25
Received By hmoser Date 2003-12-03 Time 19:15 Sent To P
Notes
2003-12-03 00:00:00PASS PROVISO
 1) REFER TO SECTION 307.2.3 AUXILIARY
 DRAIN PAN.AUXILIARY DRAIN PANS SHALL BE
 INSTALLED UNDER ALL COILS ON WITCH
 CONDENSATION WILL OCCUR.
 2) RETURN AIR REQUIREMENTS TO COMPLY
 WITH THE FLORIDA BUILDING CODE (M) 2003
 CHANGES.CHANGES WENT INTO EFFECT JULY 1
 2003
 PLAN REVIEW BY HAROLD MOSER
 (561)805-6732

Review Stop P PLUMBING
Rev No 2 Status P Date 2004-03-16 Cont ID  
Sent By rmcdouga Date 2004-03-16 Time 08:32 Rev Time 0.00
Received By rmcdouga Date 2004-03-16 Time 08:32 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-12-06 Cont ID  
Sent By hmoser Date 2003-12-03 Time 19:15 Rev Time 0.33
Received By jleech Date 2003-12-06 Time 06:33 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-11-18 Cont ID  
Sent By csiegber Date 2003-11-12 Time 16:25 Rev Time 0.00
Received By mmclean Date 2003-11-18 Time 09:28 Sent To I
Notes
***NONE***