| Plan Review Stops For Permit 03100820 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2003-10-17 |
|
|
Cont ID |
|
| Sent By |
mmclean |
Date |
2003-10-15 |
Time |
10:11 |
Rev Time |
1.10 |
| Received By |
jwitmer |
Date |
2003-10-17 |
Time |
06:48 |
Sent To |
|
|
| Notes |
| 2003-10-17 00:00:00 | MASTER PLAN 02081325 | | | 1609.4.3 LOAD REDUCTION. | | | WHEN STRUCTURAL EFFECTS DUE TO TWO OR | | | MORE LOADS IN COMBINATION WITH DEAD LOAD | | | ARE INVESTIGATED IN LOAD COMBINATIONS OF | | | 1609.4.1 OR 1609.4.2, THE COMBINED | | | EFFECTS DUE TO THE TWO OR LOADS MULTI- | | | PLIED BY 0.75 PLUS EFFECTS DUE TO DEAD | | | LOADS SHALL NOT BE LESS THAN THE EFFECTS | | | FROM THE LOAD COMBINATION OF THE DEAD | | | LOAD PLUS THE LOAD PRODUCING THE LARGEST | | | EFFECTS. INCREAS IN ALLOWABLE STRESS SPE | | | CIFIED IN THE MATERIALS SECTIONS OF THIS | | | CODE OR A REFRENCED STANDARD SHALL NOT | | | BE USED WITH THESE LOAD COMBINATIONS | | | EXCEPT THAT A DURATION OF LOAD INCREASE | | | SHALL BE PERMITTED IN ACCORDANCE WITH | | | CHAPTER 23. | | | | | | RE-EVALUATE TRUSS ANCHOR SCHEDULE BEFORE | | | FOOR FRAMING INSPECTION. | | | JIM WITMER | | | (561)805-6715 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
N |
Date |
2003-10-17 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2003-10-17 |
Time |
06:50 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2003-10-17 |
Time |
06:48 |
Sent To |
|
|
| Notes |
| 2003-10-17 00:00:00 | MASTER PLAN 02081325 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2003-11-26 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-11-26 |
Time |
14:59 |
Rev Time |
0.00 |
| Received By |
csiegber |
Date |
2003-11-26 |
Time |
14:59 |
Sent To |
M |
|
| Notes |
| 2003-11-26 00:00:00 | TO PK BOX/SUBMITTAL |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2003-11-20 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-11-20 |
Time |
16:51 |
Rev Time |
0.00 |
| Received By |
csiegber |
Date |
2003-11-20 |
Time |
16:51 |
Sent To |
M |
|
| Notes |
| 2003-11-20 00:00:00 | TO PK BOX/REV |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2003-10-20 |
|
|
Cont ID |
|
| Sent By |
mmclean |
Date |
2003-10-15 |
Time |
10:11 |
Rev Time |
0.10 |
| Received By |
kmcvey |
Date |
2003-10-15 |
Time |
08:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
P |
Date |
2003-12-04 |
|
|
Cont ID |
|
| Sent By |
rregueir |
Date |
2003-12-04 |
Time |
17:47 |
Rev Time |
0.25 |
| Received By |
rregueir |
Date |
2003-12-04 |
Time |
17:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2003-12-02 |
|
|
Cont ID |
|
| Sent By |
rregueir |
Date |
2003-12-02 |
Time |
18:35 |
Rev Time |
0.25 |
| Received By |
rregueir |
Date |
2003-12-02 |
Time |
18:34 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
N |
Date |
2003-10-17 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-11-26 |
Time |
14:59 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2003-10-17 |
Time |
06:48 |
Sent To |
|
|
| Notes |
| 2003-10-17 00:00:00 | MASTER PLAN 02081325 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
N |
Date |
2003-10-17 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2003-10-17 |
Time |
06:48 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2003-10-17 |
Time |
06:48 |
Sent To |
|
|
| Notes |
| 2003-10-17 00:00:00 | MASTER PLAN 02081325 | | | 1609.4.3 LOAD REDUCTION. | | | WHEN STRUCTURAL EFFECTS DUE TO TWO OR | | | MORE LOADS IN COMBINATION WITH DEAD LOAD | | | ARE INVESTIGATED IN LOAD COMBINATIONS OF | | | 1609.4.1 OR 1609.4.2, THE COMBINED | | | EFFECTS DUE TO THE TWO OR LOADS MULTI- | | | PLIED BY 0.75 PLUS EFFECTS DUE TO DEAD | | | LOADS SHALL NOT BE LESS THAN THE EFFECTS | | | FROM THE LOAD COMBINATION OF THE DEAD | | | LOAD PLUS THE LOAD PRODUCING THE LARGEST | | | EFFECTS. INCREAS IN ALLOWABLE STRESS SPE | | | CIFIED IN THE MATERIALS SECTIONS OF THIS | | | CODE OR A REFRENCED STANDARD SHALL NOT | | | BE USED WITH THESE LOAD COMBINATIONS | | | EXCEPT THAT A DURATION OF LOAD INCREASE | | | SHALL BE PERMITTED IN ACCORDANCE WITH | | | CHAPTER 23. | | | | | | RE-EVALUATE TRUSS ANCHOR SCHEDULE BEFORE | | | FOOR FRAMING INSPECTION. | | | JIM WITMER | | | (561)805-6715 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2003-10-15 |
|
|
Cont ID |
|
| Sent By |
mmclean |
Date |
2003-10-15 |
Time |
10:11 |
Rev Time |
0.00 |
| Received By |
mmclean |
Date |
|
Time |
|
Sent To |
B |
|
| Notes |
| 2003-10-15 00:00:00 | 10/15/03 PASS ZONING GIVEN TO JIM W MM |
|
|