Plan Review Details - Permit 03090897
Plan Review Stops For Permit 03090897
Review Stop B BUILDING (STRUCTURAL)
Rev No 7 Status P Date 2004-01-13 Cont ID  
Sent By rmcdouga Date 2004-01-13 Time 08:37 Rev Time 1.00
Received By rmcdouga Date 2004-01-13 Time 08:19 Sent To  
Notes
2004-01-13 00:00:00REVISED PLANS FOR GUEST HOUSE ARE OK
 1/13/04

Review Stop B BUILDING (STRUCTURAL)
Rev No 6 Status F Date 2003-12-22 Cont ID  
Sent By kstevens Date 2004-01-10 Time 15:59 Rev Time 1.50
Received By rmcdouga Date 2003-12-22 Time 11:48 Sent To  
Notes
2003-12-22 00:00:00REVISION DENIED
  
 1) SUBMIT REVISED FOUNDATION, ROOF
 FRAMING PLANS AND ELEVATIONS FOR GUEST
 HOUSE. TIE TO BEAM, COLUMN, FOOTER,
 TRUSS ANCHOR, WINDLOAD SCHEDULES ON THE
 APPROVED PLANS OR SUBMIT NEW SCHEDULES.
  
 2) THE DRAWINGS FROM THE ARCHITECT ARE
 REQUIRED TO BE SIGNED, SEALED AND DATED.
 THE DRAWING THAT WAS SUBMITTED HAS
 COPIED SIGNATURES. THE ORIGINAL WET
 SIGNATURE OF THE ARCHITECT IS REQUIRED.
  
 3) SUBMIT PRODUCT APPROVAL FOR THE
 MULLION THAT IS BETWEEN THE FRENCH DOOR
 WITH SIDELITES AND THE FIXED GLASS ARCH
 TRANSOM. THE PRODUCT APPROVAL SUBMITTED
 WILL IS NOT ACCEPTABLE AT THIS LOCATION.
 IF THE STEEL HEADER DETAIL ON A9 IS TO
 BE USED, INDICATE THIS ON DRAWING.
  
 4) SUBMIT PRODUCT APPROVAL FOR THE F.G.
 ARCHED WINDOW ABOVE THE FRENCH DOOR W/
 SIDELITES.
  
 5) MAKE THE PLUMBING AND MECHANICAL
 CORRECTIONS.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714

Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status F Date 2003-12-02 Cont ID  
Sent By kstevens Date 2003-12-18 Time 11:21 Rev Time 2.00
Received By rmcdouga Date 2003-12-02 Time 10:16 Sent To  
Notes
2003-12-02 00:00:00REVISION DENIED
  
 1) SUBMIT A REVISED SURVEY INDICATING
 NEW DIMENSIONS OF GUEST HOUSE.
  
 2) SUBMIT A REVISED PLUMBING RISER
 DIAGRAM.
  
 3) SUBMIT REVISED ENERGY CALCS. FOR
 GUEST HOUSE.
  
 4) SUBMIT REVISED HVAC DRAWINGS FOR
 GUEST HOUSE.
  
 5) SPECIFY HOW COMPLIANCE FOR MEANS OF
 ESCAPE WHEN HURRICANE PANELS ARE IN
 PLACE WILL BE ACCOMPLISHED AS REQUIRED
 BY FBC 1005.4.5.
  
 6) SUBMIT PRODUCT APPROVALS FOR FRENCH
 DOORS WITH SIDELITES, ARCHED FIXED GLASS
 WINDOW AND THE STRUCTURAL MULLION
 BETWEEN THE FRENCH DOORS AND TRANSOM
 ABOVE. THE PRODUCT APPROVAL FOR THE
 MULLION THAT WAS SUBMITTED FOR THE
 PERMIT DOES NOT WORK FOR THIS SIZE
 OPENING AND MULLION SPAN.
  
 ADDITIONAL FEES WILL BE ADDED FOR RADON
 AND VALUE DUE TO ADDITIONAL SQFT.
 IF YOU HAVE ANY QUESTIONS PLEASE CALL:
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2003-11-06 Cont ID  
Sent By btrobaug Date 2003-11-25 Time 15:06 Rev Time 2.00
Received By rmcdouga Date 2003-11-06 Time 09:36 Sent To  
Notes
2003-11-06 00:00:00BUILDING PROVISO
  
 1) SEPARATE PERMITS WILL BE REQUIRED FOR
 THE FOLLOWING:
 - STORM PANELS
 - BUTT GLASS WINDOWS
 - ARCHED TOP FIXED GLASS WINDOWS
 - RECTANGULAR FIXED GLASS WINDOWS
 - STOREFRONT WINDOWS WITH MORE THAN 10
 FOOT MULL SPAN
 - MULLION BETWEEN THE SLIDING GLASS DOOR
 AND FIXED GLASS TRANSOM AT MASTER
 BEDROOM

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2003-11-04 Cont ID  
Sent By btrobaug Date 2003-11-05 Time 17:44 Rev Time 2.00
Received By rmcdouga Date 2003-11-04 Time 13:59 Sent To  
Notes
2003-11-04 00:00:00DENIED
  
 1) KEY PLAN FOR STORM PANELS IS NOT
 CORRECT. THE STUDIO ONLY HAS ONE PAIR OF
 IMPACT RATED DOORS,THE OTHER REQUIRES
 SHUTTERS. THE DOOR BY THE BREAKFAST NOOK
 IS IMPACT RESISTANT, NO SHUTTERS NEEDED.
 THE TWO SLIDING GLASS DOORS AT THE
 FAMILY ROOM ARE NOT ON THE KEY PLAN.
 SUBMIT THE ICC LEGACY REPORT AND THE
 DRAWINGS FROM KNEZEVICH & ASSOC. AS
 LISTED FOR SUBSTANTIATING DATA IN THE
 ATTACHED REPORT.
  
 2) CLEARIFY THE TWO WINDOWS ON EACH SIDE
 OF THE FRONT ENTRY. ARE THEY BUTT GLASS,
 STOREFRONT OR OTHER?
  
 3) ADDRESS ITEMS 2,3,4 AND 5 FROM LAST
 REVIEW.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2003-10-30 Cont ID  
Sent By btrobaug Date 2003-11-04 Time 07:05 Rev Time 2.00
Received By rmcdouga Date 2003-10-30 Time 09:28 Sent To  
Notes
2003-10-30 00:00:00DENIED
  
 1) SUBMIT A KEY PLAN AND INSTALLATION
 SCHEDULE FOR THE STORM PANELS OR APPLY
 UNDER A SEPARATE PERMIT. SPECIFY THE
 ANCHORS AND ANCHOR SPACING.
  
 2) SUBMIT DETAILED SHOP DRAWINGS,
 SPECIFICATIONS, CALCULATIONS AND TEST
 DATA FOR THE BUTT GLASS WINDOWS IN HER
 BATH AND THE BREAKFAST ROOM. SEE FBC
 2406.2.
  
 3) PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR:
 - ARCHED TOP FIXED GLASS WINDOWS
 - RECTANGULAR FIXED GLASS WINDOWS
  
 4) THE PRODUCT APPROVAL FOR THE STORE-
 FRONT WINDOWS IS LIMITED TO A 10FT.
 (120") MULL SPAN AND THE PLANS SPECIFY A
 11FT. 4IN. (136") MULL SPAN. AN ENGINEER
 WILL BE REQUIRED TO CALCULATE THE DESIGN
 PRESSURES FOR A LARGER MULL SPAN BASED
 ON THE TEST DATA AND SUBMIT SIGNED AND
 SEALED CALCULATIONS AND RATIONAL
 ANALYSIS OR THE OPENING SIZE CAN BE
 REDUCED TO 10FT. ON THE PLANS.
  
 5) SUBMIT PRODUCT APPROVALS FOR THE
 MULLION BETWEEN THE SLIDING GLASS DOOR
 AND FIXED GLASS WINDOW AT THE MASTER
 BEDROOM. THE PRODUCT APPROVAL THAT WAS
 SUBMITTED DOES NOT MEET THE REQUIRED
 DESIGN PRESSURES ON THE PLANS. CHECK THE
 TABLES IN THE PRODUCT APPROVAL FOR
 OPENING SIZE, MULL SPAN AND REQUIRED
 PRESSURES.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-10-29 Cont ID  
Sent By btrobaug Date 2003-10-29 Time 14:06 Rev Time 3.50
Received By rmcdouga Date 2003-10-15 Time 13:33 Sent To  
Notes
2003-10-15 00:00:00DENIED
  
 1) A RECORDED COPY OF THE NOTICE OF
 COMMENCEMENT MUST BE SUBMITTED BEFORE A
 PERMIT CAN BE ISSUED.
  
 2) FBC* 1804.2.2AREA OF QUESTIONABLE
 SOIL.SUBMIT A GEOTECHNICAL REPORT
 TO VERIFY THE SAFE BEARING CAPACITY OF
 THE SOIL.
  
 3)FBC 1005.4.5 (GLITCH AMENDMENTS
 JULY 1, 2003) REQUIRES AT LEAST ONE
 MEANS OF ESCAPE FROM A DWELLING WHEN
 SHUTTERED FOR IMPACT PROTECTION. THE
 MEANS OF ESCAPE SHALL BE WITHIN THE
 FIRST FLOOR OF THE DWELLING AND CAN NOT
 BE LOCATED IN A GARAGE. OCCUPANTS IN ANY
 PART OF THE DWELLING SHALL HAVE ACCESS
 TO IT WITHOUT HAVING TO PASS THROUGH A
 LOCKABLE DOOR NOT UNDER THEIR CONTROL.
 INDICATE HOW COMPLIANCE WILL BE
 ACHIEVED AT THE MAIN HOUSE AND THE GUEST
 HOUSE.
  
 4) PROVIDE ADDITIONAL DETAILS FOR THE
 MASONRY CHIMNEY. SPECIFY THE REINFORCING
 FOR BEAMS (THERE IS NOTHING TYING IT TO
 THE BEAM SCHEDULE ON A7). SPECIFY THE
 REINFORCING FOR THE PRECAST CHIMNEY CAP
 AND HOW IT WILL BE ANCHORED TO THE
 CHIMNEY.
  
 5) SUBMIT FRAMING DETAILS FOR THE
 CUPOLA. INDICATE THE SIZE AND SPACING OF
 THE STUDS, HEADER SIZE, STRAPPING TO
 PROVIDE LOAD PATH, AND INDICATE THAT
 ADEQUATE BACKING WILL BE PROVIDED FOR
 THE STORM PANELS. (RECOMMEND IMPACT
 GLAZING AT THIS LOCATION)
  
 6)1609.4.3 LOAD REDUCTION.
 WHEN STRUCTURAL EFFECTS DUE TO TWO OR
 MORE LOADS IN COMBINATION WITH DEAD LOAD
 ARE INVESTIGATED IN LOAD COMBINATIONS OF
 1609.4.1 OR 1609.4.2, THE COMBINED
 EFFECTS DUE TO THE TWO OR LOADS MULTI-
 PLIED BY 0.75 PLUS EFFECTS DUE TO DEAD
 LOADS SHALL NOT BE LESS THAN THE EFFECTS
 FROM THE LOAD COMBINATION OF THE DEAD
 LOAD PLUS THE LOAD PRODUCING THE LARGEST
 EFFECTS. INCREAS IN ALLOWABLE STRESS SPE
 CIFIED IN THE MATERIALS SECTIONS OF THIS
 CODE OR A REFRENCED STANDARD SHALL NOT
 BE USED WITH THESE LOAD COMBINATIONS
 EXCEPT THAT A DURATION OF LOAD INCREASE
 SHALL BE PERMITTED IN ACCORDANCE WITH
 CHAPTER 23. UPDATE THE TRUSS ANCHOR
 SCHEDULE. THE 2003 USP CATALOG NO LONGER
 LISTS TAPR 224 CONNECTORS. SPECIFY
 UPLIFT VALUES THAT DO NOT INCLUDE THE
 ONE-THIRD STRESS INCREASE.
  
 7) THE CUPOLA ROOF FRAMING PLAN ON A7
 SPECIFIES CONNECTOR (A) WHICH IS FOR
 TRUSS TO CONCRETE BEAM CONNECTION.
 PLEASE REVISE TO AN APPROPRIATE TRUSS TO
 WOOD CONNECTOR.
  
 8) TRUSS ANCHOR (E) IS SPECIFIED AT THE
 COVERED PATIO WHERE THE UPLIFT EXCEEDS
 THE CAPACITY LISTED IN THE SCHEDULE.
 ANCHOR (A) IS SPECIFIED AT GIRDERS WHICH
 EXCEED ITS CAPACITY. ANCHOR (M) IS
 SPECIFIED FOR A GIRDER WITH 9800# UPLIFT
 SOME BEARING POINTS HAVE NO CONNECTOR
 SPECIFIED. SOME CONNECTOR LOCATIONS ARE
 NOT CLEARLY IDENTIFIED. SEE MARKS ON
 SHEET A7 OF THE PLANS.
  
 9) PROVIDE DETAILS OF ANY SPECIAL
 BRACING REQUIREMENTS FOR CANTILEVERED
 TRUSSES OVER STOREFRONT WINDOW.
  
 10) UPDATE THE CONNECTORS SPECIFIED IN
 THE DETAILS ON SHEET A8. SEMCO IS NO
 LONGER IN BUSINESS.
  
 11) THE GLASS IN THE STOREFRONT WINDOW
 AT THE LIVING ROOM IS REQUIRED TO BE
 SAFETY GLAZING. SEE FBC 2405.2.1(4).
  
 12) SUBMIT MANUFACTURER'S SPECS. AND UL
 LISTING INFORMATION FOR THE BBQ ON THE
 COVERED PATIO.
  
 13) SUBMIT KEY PLAN AND INSTALLATION
 SCHEDULE FOR THE STORM PANELS. SPECIFY
 THE ANCHORS AND ANCHOR SPACING. THE
 STORM PANEL DRAWINGS ARE STAMPED FOR ONE
 PERMIT ONLY AND ARE REQUIRED TO BE
 SIGNED AND SEALED BY THE ENGINEER.
  
 14) THE ENERGY CALCULATIONS ARE REQUIRED
 TO BE SIGNED BY THE OWNER/AGENT.
  
 15) THE ENERGY CALCS. ARE CLAIMING THE
 CEILING FAN CREDIT, WHICH REQUIRES A
 MINIMUM OF CEILING FAN IN ALL PRIMARY
 LIVING AREAS. THE PLANS DO NOT INDICATE
 A FAN IN THE LIVING ROOM AS REQUIRED BY
 FBC 13-607.1.A.1. PLEASE REVISE. ALSO
 INDICATE THE SIZE OF THE FANS ON THE
 PLANS. SEE FBC 13-607.A.1 TABLE 6-6.
  
 16) SUBMIT DETAILED SHOP DRAWINGS,
 SPECIFICATIONS, CALCULATIONS AND TEST
 DATA FOR THE BUTT GLASS WINDOWS IN HER
 BATH AND THE BREAKFAST ROOM. SEE FBC
 2406.2.
  
 17) PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR:
 - RADIUS STORE FRONT WINDOW AT LIVING RM
 - ARCHED TOP FIXED GLASS WINDOWS
 - RECTANGULAR FIXED GLASS WINDOWS
 - METAL DOOR TO MECHANICAL (AHU) ROOM
  
 18) THE PRODUCT APPROVAL SUBMITTED FOR
 THE MULLIONS WILL NOT WORK BETWEEN THE
 SLIDING GLASS DOOR AND FIXED GLASS ABOVE
 AT THE MASTER BEDROOM, BASED ON THE
 TABLES IN THE PRODUCT APPROVAL, THE
 OPENING SIZE, MULLION SPAN AND REQUIRED
 PRESSURES.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714

Review Stop E ELECTRICAL
Rev No 5 Status P Date 2003-11-25 Cont ID  
Sent By btrobaug Date 2003-11-25 Time 15:05 Rev Time 0.50
Received By btrobaug Date 2003-11-25 Time 14:39 Sent To B
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2003-11-05 Cont ID  
Sent By csiegber Date 2003-11-21 Time 14:49 Rev Time 1.00
Received By btrobaug Date 2003-11-05 Time 17:18 Sent To B
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status F Date 2003-11-04 Cont ID  
Sent By btrobaug Date 2003-11-04 Time 07:05 Rev Time 1.00
Received By btrobaug Date 2003-11-04 Time 06:29 Sent To B
Notes
2003-11-04 00:00:00UNSAT
 ~~~~~
 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
 PLEASE NOTE THE FOLLOWING CORRECTIONS
 FROM THE PREVIOUS REVIEWS HAVE NOT BEEN
 CORRECTED.
  
 1} THE EQUIPMENT GROUNDS BEING RAN WITH
 THE FEEDERS FROM THE METER TO THE FIRST
 MEANS OF DISCONNECT CREATE A PARALLEL
 RETURN PATH WITH THE NEUTRAL AND MUST
 NOT BE INSTALLED PER 250.6(B).
  
 2} THE FEEDER TO PANEL "C" IS MISMARKED
 ON THE RISER DIAGRAM. NOTE THEY ARE
 MARKED AS 3-#8/0,AND 1-#2 EQ.GND IN A
 1" CONDUIT.PLEASE CORRECT TO REFLECT THE
 SIZE ACTUALLY INTENDED TO BE INSTALLED.
  
 3} IN PANEL "B" THE FEEDER FOR PANEL "C"
 IS SHOWN AS A #8, BUT HAS AN
 OVERCURRENT DEVICE FOR A #6. ALSO A #8
 IS NOT RATED FOR MORE THAN A 55 AMP
 LOAD,NOTE THAT THE DEMAND ON PANEL "C"
 IS 58.3 AMPS.SEE 310.16.
  
 IF THERE ARE ANY QUESTIONS OR IF THE
 ARCHITECT WOULD LIKE TO MEET REGARDING
 ANY OF THESE COMMENTS PLEASE CALL.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2003-10-29 Cont ID  
Sent By btrobaug Date 2003-10-29 Time 14:06 Rev Time 1.00
Received By btrobaug Date 2003-10-29 Time 13:25 Sent To B
Notes
2003-10-29 00:00:00FAILED
 ~~~~~~
 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
 NONE OF THE CORRECTIONS ON THE PROVISO
 FROM THE PREVIOUS REVIEW WERE CORRECTED
 ON THE PLAN.PLEASE SEE THE LAST ITEM ON
 THAT LIST INDICATING THAT ALL PROVISO
 ITEMS BE CORRECTED ON ANY REVISIONS
 SUBMITTED FOR REVIEW.PLEASE REVISE THE
 DRAWING TO CORRECT THESE ITEMS.
 ALSO NOTE THAT PANEL "C" RATED AND FED
 @ 60 AMPS NOW HAS A CONNECTED LOAD OF
 68.8 AMPS.PLEASE REVISE THE LOAD CALCS
 AND INCREASE THIS PANEL AND FEEDER SIZE
 TO HANDLE THE INCREASED LOAD.
  
 SUBMIT REVISED DRAWINGS FOR REVIEW.IF
 THERE ARE ANY QUESTIONS PLEASE CALL.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-09-25 Cont ID  
Sent By csiegber Date 2003-09-17 Time 12:05 Rev Time 1.00
Received By btrobaug Date 2003-09-24 Time 15:16 Sent To M
Notes
2003-09-25 00:00:00PROVISO
 ~~~~~~~
 PLEASE NOTE THAT THE FOLLOWING
 CORRECTIONS MUST BE DONE TO COMPLY WITH
 THE 2002 ELECTRICAL CODE.
  
 1} THE EQUIPMENT GROUNDS BEING RAN WITH
 THE FEEDERS FROM THE METER TO THE FIRST
 MEANS OF DISCONNECT CREATE A PARALLEL
 RETURN PATH WITH THE NEUTRAL AND MUST
 NOT BE INSTALLED PER 250.6(B).
  
 2} THE FEEDER TO PANEL"C" IS MISMARKED
 ON THE RISER. IT MUST BE SIZED AS PER
 THE PANEL SCHEDULE WITH A MINIMUM OF
 #10EQ.GND .
  
 3} THE MASTER BATH RECEPTACLES ARE
 SHOWNLOCATED MORE THAN 3' FROM THE
 BASINS &
 ARE NOT IN COMPLIANCE WITH 210.52(D).
  
 4} THE REFERENCE TO SMOKE DETECTORS
 BEING FED FROM KITCHEN CIRCUITS MUST BE
 DISREGARDED OR THAT CIRCUIT MUST BE FED
 FROM AN AFCI PER 210.12.
  
 IF THERE ARE REVISIONS TO THIS SHEET AT
 ANY TIME,PLEASE INCORPORATE THESE
 CORRECTIONS WHEN BEING SUBMITTED FOR
 REVIEW.
  
 IF THERE ARE ANY QUESTIONS PLEASE CALL.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718

Review Stop I INCOMING/PROCESSING
Rev No 9 Status N Date 2004-05-17 Cont ID  
Sent By csiegber Date 2004-05-17 Time 15:27 Rev Time 0.00
Received By csiegber Date 2004-05-17 Time 15:27 Sent To P
Notes
2004-05-17 00:00:00TO KS BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 8 Status N Date 2003-12-30 Cont ID  
Sent By csiegber Date 2003-12-30 Time 08:31 Rev Time 0.00
Received By csiegber Date 2003-12-30 Time 08:31 Sent To M
Notes
2003-12-30 00:00:00TO PK BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2003-12-17 Cont ID  
Sent By csiegber Date 2003-12-17 Time 14:37 Rev Time 0.00
Received By csiegber Date 2003-12-17 Time 14:37 Sent To B
Notes
2003-12-17 00:00:00TO RM DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2003-12-10 Cont ID  
Sent By csiegber Date 2003-12-10 Time 09:39 Rev Time 0.00
Received By csiegber Date 2003-12-10 Time 09:39 Sent To B
Notes
2003-12-10 00:00:00TO RM DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2003-12-10 Cont ID  
Sent By csiegber Date 2003-12-10 Time 09:36 Rev Time 0.00
Received By csiegber Date 2003-12-10 Time 09:36 Sent To M
Notes
2003-12-10 00:00:00TO PK BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-11-21 Cont ID  
Sent By csiegber Date 2003-11-21 Time 14:49 Rev Time 0.00
Received By csiegber Date 2003-11-21 Time 14:49 Sent To E
Notes
2003-11-21 00:00:00TO BT DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-10-24 Cont ID  
Sent By csiegber Date 2004-05-05 Time 15:45 Rev Time 0.00
Received By csiegber Date 2003-10-24 Time 14:54 Sent To  
Notes
2003-10-24 00:00:00TO MCDOUGLES DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-09-17 Cont ID  
Sent By csiegber Date 2003-09-17 Time 12:04 Rev Time 0.00
Received By csiegber Date 2003-09-17 Time 12:04 Sent To E
Notes
2003-09-17 00:00:00ON SFD RACK ELEC

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-09-15 Cont ID  
Sent By mmclean Date 2003-09-16 Time 16:17 Rev Time 0.00
Received By csiegber Date 2003-09-15 Time 16:47 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 4 Status P Date 2004-01-06 Cont ID  
Sent By pkrauss Date 2004-01-06 Time 11:26 Rev Time 0.35
Received By pkrauss Date 2004-01-06 Time 11:26 Sent To P
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 3 Status F Date 2003-12-18 Cont ID  
Sent By csiegber Date 2003-12-30 Time 08:31 Rev Time 0.15
Received By pkrauss Date 2003-12-18 Time 07:22 Sent To P
Notes
2003-12-18 00:00:00DENIED:
 PLEASE PROVIDE PLANS THAT ARE LEGIBLE.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT (561) 805-6719.

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2003-10-07 Cont ID  
Sent By csiegber Date 2003-12-10 Time 09:37 Rev Time 0.10
Received By pkrauss Date 2003-10-07 Time 13:28 Sent To B
Notes
2003-10-07 00:00:00SUBMITTAL OF CORRECT EQUIPMENT SCHEDULE

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2003-09-29 Cont ID  
Sent By btrobaug Date 2003-09-25 Time 17:42 Rev Time 0.25
Received By pkrauss Date 2003-09-29 Time 07:29 Sent To P
Notes
2003-09-29 00:00:00DENIED:
 ENERGY CALCULATIONS TO THE MAIN HOUSE
 INDICATE ONE 13 SEER AND ONE 12.6 SEER
 UNIT.PLAN INDICATES ALL EQUIPMENT AS
 12 SEER.PLEASE CORRECT.
  
 PLEASE NOTE, REVISION TO THE 2001
 FBC(M) 601.4, EFFECTIVE JUNE 30,2003:
  
 BALANCED AIR RETURN - RETURN/TRANSFER
 SHALL BE 1 1/2 TIMES THE CROSS SECTIONAL
 AREA (SQ INCHES) OF THE SUPPLY DUCT
 ENTERING THE ROOM ITS SERVING & THE
 DOOR HAVING AN UNRESTRICTED 1" UNDERCUT.
  
 ALL SUPPLY AIR INTO THE MASTER SUITE
 SHALL BE INCLUDED.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT (561) 805-6719.

Review Stop P PLUMBING
Rev No 4 Status P Date 2004-05-28 Cont ID  
Sent By kstevens Date 2004-05-28 Time 15:53 Rev Time 0.50
Received By kstevens Date 2004-05-28 Time 15:53 Sent To  
Notes
2004-05-28 00:00:00REVISION OK - SANT. RISER DIAGRAM

Review Stop P PLUMBING
Rev No 3 Status P Date 2004-01-10 Cont ID  
Sent By csiegber Date 2004-05-17 Time 15:27 Rev Time 0.50
Received By kstevens Date 2004-01-10 Time 15:58 Sent To B
Notes
2004-01-10 00:00:00REVISION OK - SANT. RISER DIAGRAM

Review Stop P PLUMBING
Rev No 2 Status F Date 2003-12-18 Cont ID  
Sent By pkrauss Date 2004-01-06 Time 11:26 Rev Time 0.50
Received By kstevens Date 2003-12-18 Time 11:21 Sent To B
Notes
2003-12-18 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 CHAPTER 1
  
 1) SANITARY RISER DIAGRAM DOES NOT MEET
 CODE REQUIREMENTS, NOR DOES IT REFLECT
 THE FLOOR PLAN.
 A. SHOWER IN CABANA BATH IS NOT VENTED.
 901.2.1
 B. NO VEG SINK SHOWN ON RISER. 104.2.1
 C. BIDET NOT VENTED, AND A TRAP IS RE
 QUIRED. 901.2.1 - 1002.1
 D. WASH MACHINE AND LAUNDRY SINK ARE ON
 DIFFERENT WALLS. EITHER SEPARATE STACKS
 ARE REQUIRED OR SHOW WASTE ARM TO SINK
 ON RISER. 104.2.1 - A CLEANOUT IS REQ-
 UIRED AT 4' ABOVE THE FLOOR ON THE WASH
 MACHINE STACK. 708.10 - WASH MACHINE AND
 LAUNDRY SINK SHALL NOT CONNECT TO THE
 STACK ON A DOUBLE SANITARY TEE (CROSS)
 706.3.
 E. STUDIO BATH RISER AND FLOOR PLAN DO
 NOT REFLECT EACH OTHER. (SHOWER NOT TUB)
 F. SEE RED LINE CORRECTIONS ON SANITARY
 RISER DIAGRAM AND MAKE ADJUSTMENTS FOR
 RESUBMITING REVISION.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-09-29 Cont ID  
Sent By pkrauss Date 2003-12-18 Time 07:33 Rev Time 0.33
Received By jleech Date 2003-09-29 Time 17:17 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2004-01-13 Cont ID  
Sent By rmcdouga Date 2004-01-13 Time 08:17 Rev Time 0.00
Received By rmcdouga Date 2004-01-13 Time 08:17 Sent To  
Notes
2004-01-13 00:00:00REVISION TO GUEST HOUSE OK PER M.MCLEAN
 1-13-04

Review Stop Z ZONING
Rev No 1 Status P Date 2003-09-16 Cont ID  
Sent By csiegber Date 2003-09-15 Time 16:48 Rev Time 0.00
Received By mmclean Date   Time   Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy