Plan Review Details - Permit 03081348
Plan Review Stops For Permit 03081348
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2003-12-12 Cont ID  
Sent By csiegber Date 2004-07-15 Time 15:37 Rev Time 0.50
Received By rmcdouga Date   Time   Sent To  
Notes
2003-12-12 00:00:00REVISION FROM PRIVACY FENCE TO WALL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-11-07 Cont ID  
Sent By lsmith Date 2003-11-07 Time 10:16 Rev Time 0.25
Received By lsmith Date 2003-11-07 Time 10:16 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2003-09-04 Cont ID  
Sent By csiegber Date 2003-11-04 Time 14:23 Rev Time 3.00
Received By rmcdouga Date 2003-09-04 Time 13:59 Sent To  
Notes
2003-09-04 00:00:00PROVISO
  
 1) SUBMIT A SIGNED AND SEALED COPY OF
 THE SOIL BORING TEST REPORT PRIOR TO
 POURING THE FOUNDATION.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2004-07-23 Cont ID  
Sent By btrobaug Date 2004-07-23 Time 09:58 Rev Time 0.50
Received By btrobaug Date 2004-07-23 Time 09:53 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-08-26 Cont ID  
Sent By csiegber Date 2003-08-25 Time 15:02 Rev Time 0.50
Received By btrobaug Date 2003-08-26 Time 18:10 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2004-07-15 Cont ID  
Sent By csiegber Date 2004-07-15 Time 15:37 Rev Time 0.00
Received By csiegber Date 2004-07-15 Time 15:37 Sent To B
Notes
2004-07-15 00:00:00TO BT DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2004-01-27 Cont ID  
Sent By csiegber Date 2004-01-27 Time 12:28 Rev Time 0.00
Received By csiegber Date 2004-01-27 Time 12:27 Sent To P
Notes
2004-01-27 00:00:00TO KS BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-11-04 Cont ID  
Sent By mmclean Date 2003-11-06 Time 09:58 Rev Time 0.00
Received By csiegber Date 2003-11-04 Time 14:23 Sent To B
Notes
2003-11-07 00:00:00TO MISC BOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-08-25 Cont ID  
Sent By csiegber Date 2003-08-25 Time 15:02 Rev Time 0.00
Received By csiegber Date 2003-08-25 Time 15:02 Sent To E
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-08-25 Cont ID  
Sent By mmclean Date 2003-08-25 Time 12:05 Rev Time 0.00
Received By csiegber Date 2003-08-25 Time 08:05 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-08-29 Cont ID  
Sent By btrobaug Date 2003-08-26 Time 18:25 Rev Time 0.25
Received By pkrauss Date 2003-08-29 Time 08:39 Sent To P
Notes
2003-08-29 00:00:00PROVISO:
 THE MECHANICAL FLOOR PLAN IS REVERSED
 OF THE BUILDING FLOOR PLAN.
  
 RETURN AIR SHALL BE CALCULATED AS
 FOLLOWS:
 BALANCE AIR RETURN - RETURN TRANSFER
 SHALL BE 1 1/2 TIMES THE CROSS SECTIONAL
 AREA (SQ INCHES) OF THE SUPPLY DUCT
 ENTERING THE ROOM IT'S SERVING & THE
 DOOR HAVING AN UNRESTRICTED 1" UNDERCUT.
  
 ALL SUPPLY AIR INTO THE MASTER SUITE
 SHALL BE INCLUDED.

Review Stop P PLUMBING
Rev No 3 Status P Date 2004-01-30 Cont ID  
Sent By kstevens Date 2004-01-30 Time 10:07 Rev Time 0.50
Received By kstevens Date 2004-01-30 Time 10:07 Sent To  
Notes
2004-01-30 00:00:00REVISION OK - SANT. RISER DIAGRAM

Review Stop P PLUMBING
Rev No 2 Status F Date 2004-01-28 Cont ID  
Sent By kstevens Date 2004-01-28 Time 12:28 Rev Time 0.50
Received By kstevens Date 2004-01-28 Time 12:28 Sent To  
Notes
2004-01-28 00:00:00DENIED
 REFERENCE: FLORIDA ADMIN. CODE
 FLORIDA STATUTES
  
 1) INITIALS DO NOT APPEAR TO MATCH THE
 INITIALS SUBMITTED ON FILE COPY OF PLANS
 PER 61G1-16.003 THE PERSONAL SIGNATURE
 IS REQUIRED ON ALL ARCHITECTURAL DOCU-
 MENTS TO BE FILED FOR PUBLIC RECORD.
 DOCUMENTS SHALL BE SIGNED PERSONALLY BY
 THE RESPONSIBLE ARCHITECT. FS 481
 2) A COPY OF THE REVISION AND AN EXAMPLE
 OF THE INITALS FROM THE FILE COPY OF THE
 PLANS SHALL BE KEPT ON FILE FOR REVIEW
 BY THE DBPR.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-09-02 Cont ID  
Sent By csiegber Date 2004-01-27 Time 12:28 Rev Time 0.33
Received By kstevens Date 2003-09-02 Time 07:15 Sent To B
Notes
2003-09-02 00:00:00IF INSTALLATION IS DIFFERENT THAN RISER,
 A REVISION IS REQUIRED.

Review Stop Z ZONING
Rev No 2 Status N Date 2003-11-06 Cont ID  
Sent By mmclean Date 2003-11-06 Time 09:58 Rev Time 0.00
Received By mmclean Date 2003-11-06 Time 09:58 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-08-25 Cont ID  
Sent By csiegber Date 2003-08-25 Time 08:05 Rev Time 0.00
Received By mmclean Date   Time   Sent To I
Notes
***NONE***