Plan Review Details - Permit 03080107
Plan Review Stops For Permit 03080107
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2003-08-18 Cont ID  
Sent By kstevens Date 2003-10-06 Time 16:38 Rev Time 1.00
Received By lsmith Date 2003-08-18 Time 09:34 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-10-06 Cont ID  
Sent By kstevens Date 2003-10-06 Time 16:37 Rev Time 0.34
Received By dpalmer Date 2003-10-06 Time 15:49 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-08-15 Cont ID  
Sent By kstevens Date 2003-08-15 Time 07:29 Rev Time 0.33
Received By btrobaug Date 2003-08-15 Time 16:16 Sent To B
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-10-06 Cont ID  
Sent By csiegber Date 2003-10-06 Time 11:48 Rev Time 0.00
Received By csiegber Date 2003-10-06 Time 11:48 Sent To P
Notes
2003-10-06 00:00:00TO KS DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-09-08 Cont ID  
Sent By csiegber Date 2003-09-08 Time 11:08 Rev Time 0.00
Received By csiegber Date 2003-09-08 Time 11:08 Sent To P
Notes
2003-09-08 00:00:00TO KS BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-08-05 Cont ID  
Sent By alange Date 2003-08-05 Time 16:34 Rev Time 0.00
Received By alange Date 2003-08-05 Time 16:34 Sent To Z
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2003-10-06 Cont ID  
Sent By kstevens Date 2003-10-06 Time 16:37 Rev Time 1.50
Received By kstevens Date 2003-10-06 Time 16:37 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2003-08-15 Cont ID  
Sent By dpalmer Date 2003-10-06 Time 15:49 Rev Time 1.50
Received By kstevens Date 2003-08-13 Time 17:28 Sent To E
Notes
2003-08-15 00:00:00DENIED
 REFERENCE: FBC-2001 424
  
 1) SHT 3 OF 5 MAIN DRAIN DETAIL SHOWS
 A PVC SUCTION LINE. SEC 424.1.6.5.10.5
 CALLS FOR MAIN DRAIN TO BE CONNECTED TO
 A COLLECTOR TANK. PLEASE CLAIRFY IF THIS
 WILL BE GRAVITY DRAINED OR SUCTION.
 2) SEC 424.1.6.5.14 A SKETCH OF ANY PRO-
 POSED HEATER INSTALLATION INCLUDING
 VALVES, THERMOMETER, PIPE SIZES AND
 MATERIAL SPECIFICATIONS SHALL BE INCLUD-
 ED IN THE APPLICATION FOR PERMIT PRIOR
 TO INSTALLATION.
 3) PUMPS SHALL BE EQUIPPED WITH A HAIR &
 LINT STRAINER. SEC 424.1.6.5.4
 4) SHT 4 OF 5 VALVES AND PIPE SIZE CHART
 (M) INDICATES A POOL HEATER. HEATER
 SHALL BE LABELED PER SECTION 303.4 OF
 FBC-2001 PLUMBING. SUBMIT MANUF. INFO.
 SPECIFICATIONS SHEETS.
 5) PLASTIC PIPE SUBJECT TO A PERIOD OF
 PROLONGED SUNLIGHT EXPOSURE SHALL BE
 COATED TO PROTECT IT FROM ULTRAVIOLET
 LIGHT DEGRADATION. SEC 424.1.6.5.6
 6) ALL WATER HEATING EQUIPMENT SHALL BE
 INSTALLED WITH FLANGES OR UNION CONNECT-
 IONS ADJACENT TO THE HEATER. SECTION
 424.1.6.5.14.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]

Review Stop Z ZONING
Rev No 1 Status P Date 2003-08-11 Cont ID  
Sent By alange Date 2003-08-05 Time 16:35 Rev Time 0.00
Received By mmclean Date   Time   Sent To P
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved