Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2003-08-19 Cont ID  
Sent By jleech Date 2003-08-14 Time 18:38 Rev Time 2.00
Received By jgomez Date 2003-08-19 Time 15:59 Sent To PC
Notes
2003-08-19 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-REVISE INSTALLATION SCHEDULE FOR
 STORM SHUTTERS. REVISE THE ANCHOR
 SPACING FOR WOOD ANCHORS. SEE THE
 ENGINEERED DRAWINGS FOR MAXIMUM
 ANCHOR SPACING ALLOWED AND REVISE AS
 REQUIRED.
 2-RESUBMIT ENERGY CALCULATIONS WITH
 THE ENGINEER'S ORIGINAL SEAL,
 SIGNATURE AND SEAL AS REQUIRED BY
 CHAPTER 471 FLORIDA STATUTES WHEN
 SUBMITTING DOCUMENTS FOR PUBLIC
 RECORDS.
 3-RESUBMIT SOIL TEST REPORT WITH
 ORIGINAL SEAL, SIGNATURE, DATE.
 CHAPTER 471 FLORIDA STATUTES.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-12-01 Cont ID  
Sent By btrobaug Date 2003-12-01 Time 08:38 Rev Time 0.50
Received By btrobaug Date 2003-12-01 Time 08:38 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-08-07 Cont ID  
Sent By csiegber Date 2003-11-14 Time 09:20 Rev Time 0.33
Received By dpalmer Date 2003-08-07 Time 07:38 Sent To M
Notes
2003-08-07 00:00:002002 NEC REDLINED.

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-11-14 Cont ID  
Sent By csiegber Date 2003-11-14 Time 14:48 Rev Time 0.00
Received By csiegber Date 2003-11-14 Time 14:48 Sent To M
Notes
2003-11-14 00:00:00TO PK BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-11-14 Cont ID  
Sent By csiegber Date 2003-11-14 Time 09:20 Rev Time 0.00
Received By csiegber Date 2003-11-14 Time 09:20 Sent To E
Notes
2003-11-14 00:00:00TO MISC BOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-07-29 Cont ID  
Sent By alange Date 2003-07-29 Time 13:40 Rev Time 0.00
Received By alange Date 2003-07-29 Time 13:40 Sent To E
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-07-25 Cont ID  
Sent By mmclean Date 2003-07-29 Time 12:17 Rev Time 0.00
Received By alange Date 2003-07-25 Time 09:48 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2003-11-23 Cont ID  
Sent By hmoser Date 2003-11-23 Time 14:18 Rev Time 0.25
Received By hmoser Date 2003-11-23 Time 14:17 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-08-12 Cont ID  
Sent By csiegber Date 2003-11-14 Time 14:48 Rev Time 0.25
Received By pkrauss Date 2003-08-12 Time 06:23 Sent To P
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-08-14 Cont ID  
Sent By pkrauss Date 2003-08-12 Time 06:23 Rev Time 0.25
Received By jleech Date 2003-08-14 Time 18:38 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-07-29 Cont ID  
Sent By alange Date 2003-07-25 Time 09:48 Rev Time 1.00
Received By mmclean Date   Time   Sent To I
Notes
***NONE***