| Plan Review Stops For Permit 03071134 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2003-12-01 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2003-12-01 |
Time |
16:35 |
Rev Time |
1.00 |
| Received By |
rmcdouga |
Date |
2003-12-01 |
Time |
16:35 |
Sent To |
|
|
| Notes |
| 2003-12-01 00:00:00 | REVISION TO CHANGE BATHROOM DOOR TO A | | | POCKET DOOR IS OK 12-1-03 |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2003-09-16 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2003-11-24 |
Time |
09:30 |
Rev Time |
2.50 |
| Received By |
rmcdouga |
Date |
2003-09-16 |
Time |
08:08 |
Sent To |
|
|
| Notes |
| 2003-09-16 00:00:00 | PROVISO | | | | | | 1) SUBMIT A SOIL BORING TEST REPORT AS | | | REQUIRED BY FBC 1804.2.2, PRIOR TO | | | POURING THE FOUNDATION. | | | | | | 2) SUBMIT A SIGNED AND SEALED LETTER | | | FROM THE STORM PANEL ENGINEER (KNEZIVICH | | | AND ASSOC.) STATING THAT THE CALK-IN | | | ANCHORS CAN BE USED IN HOLLOW CONCRETE | | | BLOCK. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2003-09-03 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-09-11 |
Time |
12:37 |
Rev Time |
2.00 |
| Received By |
rmcdouga |
Date |
2003-09-03 |
Time |
10:45 |
Sent To |
|
|
| Notes |
| 2003-09-03 00:00:00 | DENIED | | | | | | 1) IMPACT FEES MUST BE PAID TO PALM | | | BEACH COUNTY, PLANS STAMPED BY THEM AND | | | COPY OF RECEIPT SUBMITTED TO CITY OF | | | WEST PALM BEACH BUILDING DEPARTMENT, | | | BEFORE A BUILDING PERMIT CAN BE ISSUED. | | | | | | 2) SUBMIT A SIGNED AND SEALED COPY OF | | | A SOIL BORING TEST REPORT AS REQUIRED BY | | | FBC 1804.2.2. | | | | | | 3) REVISE GLASS BLOCK NOTE #5 ON A12. | | | THE GLASS BLOCK IS REQUIRED TO HAVE A | | | UNIFORM FACE THICKNESS OF 0.25 INCH WHEN | | | LOCATED WITHIN (3) FEET HORIZONTALLY OF | | | THE STANDING OR WALKING SURFACE OF A | | | BATHTUB, SHOWER, ETC. SEE FBC 2405.2.1 | | | AND 2405.2.2. | | | | | | 4) THE "REDLINED" CHANGE TO THE NEGATIVE | | | WINDLOAD PRESSURE FOR THE DOUBLE ENTRY | | | DOORS ON THE WIND LOAD SCHEDULE ON A1 IS | | | REQUIRED TO BE INITIALED AND DATED BY | | | THE DESIGNER OF RECORD. | | | | | | 5)SUBMIT A SIGNED AND SEALED COPY OF THE | | | LETTER FROM KENEZEVICH AND ASSOCIATES | | | ADDRESSING THE USE OF CALK-IN ANCHORS IN | | | CONCRETE BLOCK. THE LETTER SHOULD | | | INDICATE THE PSI OF THE BLOCK AS TESTED. | | | | | | 6) PROVIDE ADDITIONAL INFORMATION FOR | | | THE INSERT HEADER AT THE COVERED LANAI. | | | SPECIFY HOW IT WILL BE ANCHORED FOR | | | UPLIFT, HOW THE TRUSSES WILL BE ATTACHED | | | TO THE HEADER, HOW THE HEADER WILL BEAR | | | ON THE WALLS AT EACH END, ETC. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2003-08-13 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-08-28 |
Time |
07:21 |
Rev Time |
3.00 |
| Received By |
rmcdouga |
Date |
2003-08-13 |
Time |
15:54 |
Sent To |
|
|
| Notes |
| 2003-08-13 00:00:00 | DENIED | | | | | | 1) IMPACT FEES MUST BE PAID TO PALM | | | BEACH COUNTY, PLANS STAMPED BY THEM AND | | | COPY OF RECEIPT SUBMITTED TO CITY OF | | | WEST PALM BEACH BUILDING DEPARTMENT, | | | BEFORE A BUILDING PERMIT CAN BE ISSUED. | | | | | | 2) A RECORDED COPY OF THE NOTICE OF | | | COMMENCEMENT MUST BE SUBMITTED BEFORE A | | | PERMIT CAN BE ISSUED. | | | | | | | | | 3) SUBMIT A SOIL BORING TEST REPORT AS | | | REQUIRED BY FBC 1804.2.2. | | | | | | 4) THE GLASS BLOCK IN THE MASTER BATH | | | AND BATH 2 ARE IN HAZARDOUS LOCATIONS | | | AND ARE REQUIRED TO BE TEMPERED OR HAVE | | | A UNIFORM FACE THICKNESS OF 0.25" PER | | | FBC 2405.2. | | | | | | 5) THE FULL BATH ON THE FIRST FLOOR IS | | | REQUIRED TO HAVE A DOOR WITH A 29" CLEAR | | | OPENING PER FBC 11-4.23.2. | | | | | | 6) FBC 1609.4 DOES NOT ALLOW THE ONE- | | | THIRD INCREASE IN THE STEEL CALCULATIONS | | | FOR COMBINATION LOADS. PLEASE REVISE THE | | | VALUES LISTED IN THE ANCHOR SCHEDULES ON | | | SHEETS A7 AND A8 TO VALUES THAT DO NOT | | | INCLUDE THIS INCREASE. SEE THE 2003 USP | | | CATALOG. | | | | | | 7) THE 10'X 8' SLIDING GLASS DOOR (M) IS | | | NOT LISTED IN THE WINDLOAD SCHEDULE ON | | | A1. | | | | | | 8) THE OVERHEAD GARAGE DOOR PRODUCT | | | APPROVAL DOES NOT MEET THE PRESSURES | | | LISTED IN THE WINDLOAD SCHEDULE ON A1. | | | | | | 9) THE SH35 WINDOWS (W) AND (Y) WILL | | | REQUIRE 3/16" TEMPERED GLASS TO MEET THE | | | SPECIFIED WINDLOADS ACCORDING TO THE | | | PRODUCT APPROVAL THAT WAS SUBMITTED. | | | | | | 10) THE PRODUCT APPROVAL FOR THE DOUBLE | | | ENTRY DOOR DOES NOT MEET THE WINDLOAD | | | PRESSURES LISTED ON THE PLANS. | | | | | | 11) PLEASE REVIEW THE WINDLOAD PRESSURES | | | ON THE PLANS THEY MAY BE HIGHER THAN | | | NEEDED FOR EXPOSURE B. | | | | | | 12) THE KEY PLAN AND SCHEDULE FOR THE | | | STORM PANELS DO NOT MATCH THE PLANS. | | | PLEASE CORRECT. | | | | | | 13) THE PRODUCT APPROVAL FOR THE STORM | | | PANELS LISTS THE MINIMUM PANEL LENGTH | | | FOR DIRECT MOUNT INSTALLATIONS AS 46". | | | THE SCHEDULE LISTS SMALLER LENGTHS. | | | PLEASE CORRECT. | | | | | | 14) THE CALK-IN ANCHORS ARE HI-LITED ON | | | THE PRODUCT APPROVAL FOR HOLLOW CONCRETE | | | BLOCK. THEY CAN NOT BE USED FOR HOLLOW | | | CONCRETE BLOCK WITH C1 CONNECTION TYPE. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
5 |
Status |
P |
Date |
2004-08-30 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2004-08-30 |
Time |
07:07 |
Rev Time |
0.10 |
| Received By |
dpalmer |
Date |
2004-08-30 |
Time |
07:07 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
4 |
Status |
F |
Date |
2004-08-03 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2004-08-24 |
Time |
10:05 |
Rev Time |
0.33 |
| Received By |
dpalmer |
Date |
2004-08-03 |
Time |
13:25 |
Sent To |
|
|
| Notes |
| 2004-08-03 00:00:00 | ********** UNSAT ********* | | | | | | 1)NOTE: PLEASE SEE SD TO BE MOVED INTO | | | MASTER BEDRM. | | | NFPA-72 8-1.4.1.6.2 | | | | | | 2)NOTE: PLEASE SEE ARC FAULT PROTECTION | | | IS SHOWN FROM 99 NEC. | | | ALL OUTLETS IN BEDRMS, FANS, SD'S,LTS | | | RECEPT . 2002 NEC 210.12 | | | | | | 3)NOTE: PLEASE SEE MISSING LICENSE #'S | | | ON TITLE BLOCK. FAC 61G1-16.004, FS | | | 481.219 | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | | REVIEW. IF THERE ARE ANY QUESTIONS, | | | PLEASE DO NOT HESITATE TO CALL. | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW | | | CITY OF WEST PALM BEACH | | | CONSTUCTION SERVICES DEPT. | | | 561-805-6717 | | | [email protected] |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2003-11-24 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2004-07-29 |
Time |
08:26 |
Rev Time |
0.50 |
| Received By |
btrobaug |
Date |
2003-11-24 |
Time |
09:30 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2003-08-28 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-11-21 |
Time |
15:25 |
Rev Time |
0.33 |
| Received By |
dpalmer |
Date |
2003-08-28 |
Time |
07:21 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2003-07-30 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-08-27 |
Time |
15:55 |
Rev Time |
0.33 |
| Received By |
dpalmer |
Date |
2003-07-30 |
Time |
19:03 |
Sent To |
M |
|
| Notes |
| 2003-07-30 00:00:00 | ********* NOTES REDLINED ************ | | | | | | 1)NOTE: MISSING SD LEADING TO FLOOR | | | ABOVE IN VICINITY OF STAIRS. NFPA-72 | | | 8-1.4.2 | | | | | | 2)NOTE: PLEASE SEE OCP AND AWG FOR | | | GEN LT CIRCUITS, SHOWN AS 2P 60A AND | | | #6 AWG.?? |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
8 |
Status |
N |
Date |
2004-08-24 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2004-08-24 |
Time |
10:05 |
Rev Time |
0.00 |
| Received By |
csiegber |
Date |
2004-08-24 |
Time |
10:05 |
Sent To |
E |
|
| Notes |
| 2004-08-24 00:00:00 | TO DP DESK/REV |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
7 |
Status |
N |
Date |
2004-07-29 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2004-07-29 |
Time |
08:26 |
Rev Time |
0.00 |
| Received By |
csiegber |
Date |
2004-07-29 |
Time |
08:26 |
Sent To |
E |
|
| Notes |
| 2004-07-29 00:00:00 | TO DP DESK/REV |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
6 |
Status |
N |
Date |
2003-11-21 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-11-21 |
Time |
15:25 |
Rev Time |
0.00 |
| Received By |
csiegber |
Date |
2003-11-21 |
Time |
15:25 |
Sent To |
E |
|
| Notes |
| 2003-11-21 00:00:00 | TO BT DESK/REV |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2003-09-19 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-09-19 |
Time |
14:20 |
Rev Time |
0.00 |
| Received By |
csiegber |
Date |
2003-09-19 |
Time |
14:20 |
Sent To |
B |
|
| Notes |
| 2003-09-19 00:00:00 | TO RM DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2003-09-11 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-09-11 |
Time |
12:37 |
Rev Time |
0.00 |
| Received By |
csiegber |
Date |
2003-09-11 |
Time |
12:37 |
Sent To |
B |
|
| Notes |
| 2003-09-11 00:00:00 | TO RM DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2003-08-27 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-08-27 |
Time |
15:55 |
Rev Time |
0.00 |
| Received By |
csiegber |
Date |
2003-08-27 |
Time |
15:55 |
Sent To |
E |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2003-07-24 |
|
|
Cont ID |
|
| Sent By |
alange |
Date |
2003-07-24 |
Time |
13:23 |
Rev Time |
0.00 |
| Received By |
alange |
Date |
2003-07-24 |
Time |
13:23 |
Sent To |
E |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2003-07-18 |
|
|
Cont ID |
|
| Sent By |
mmclean |
Date |
2003-07-24 |
Time |
10:59 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-07-18 |
Time |
09:29 |
Sent To |
Z |
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2003-08-10 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-07-30 |
Time |
19:03 |
Rev Time |
0.25 |
| Received By |
pkrauss |
Date |
2003-08-10 |
Time |
18:44 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2003-08-11 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2003-08-10 |
Time |
18:44 |
Rev Time |
0.25 |
| Received By |
jleech |
Date |
2003-08-11 |
Time |
16:37 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2003-07-24 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-07-18 |
Time |
09:29 |
Rev Time |
1.00 |
| Received By |
mmclean |
Date |
|
Time |
|
Sent To |
I |
|
| Notes |
|
|