Plan Review Details - Permit 03070402
Plan Review Stops For Permit 03070402
Review Stop B BUILDING (STRUCTURAL)
Rev No 7 Status P Date 2004-04-27 Cont ID  
Sent By shill Date 2004-04-27 Time 11:00 Rev Time 0.50
Received By shill Date 2004-04-27 Time 11:00 Sent To  
Notes
2004-04-27 00:00:00REVISED SHEETS 1 & 2 DATED 10/3/03

Review Stop B BUILDING (STRUCTURAL)
Rev No 6 Status F Date 2004-04-12 Cont ID  
Sent By csiegber Date 2004-04-20 Time 16:45 Rev Time 1.00
Received By shill Date 2004-04-12 Time 16:59 Sent To  
Notes
2004-04-12 00:00:00****CORRECTIONS****
 REVISION DATED 10/3/03, SHEET 1
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 561-805-6724
  
 1.)SEE PREVIOUS LIST.HISTORIC
 APPROVAL REQUIRED.THE CHANGES TO THE
 PLAN ARE AFTER THE HISTORIC BOARD
 DECISION.HAVE THE PLANS STAMPED.
  
 2.)THE BOARD APPROVED A DIFFERENT
 BRAND OF DOORS THAN THE PRODUCT
 APPROVALS SUBMITTED.HAVE THESE DOORS
 APPROVED.SEE PREVIOUS LIST, SUBMIT
 PRODUCT APPROVALS FOR THE MULLIONS AND
 THE TRANSOM WINDOW.
  
 3.)CHANGES TO THE PLAN ARE NOT TO BE
 DONE IN PENCIL.HAVE THE DESIGNER OF
 RECORD DO THE CHANGES IN INK AND
 INITIAL THE CHANGES OR CHANGE ON THE
 PRINTED PLAN.

Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status P Date 2004-04-06 Cont ID  
Sent By shill Date 2004-04-06 Time 15:13 Rev Time 1.00
Received By shill Date 2004-04-06 Time 15:13 Sent To  
Notes
2004-04-06 00:00:00REV DATED 2/6/4

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status F Date 2004-03-16 Cont ID  
Sent By csiegber Date 2004-04-01 Time 14:41 Rev Time 1.00
Received By shill Date 2004-03-16 Time 13:26 Sent To  
Notes
2004-03-16 00:00:00****CORRECTIONS****
 REVISION DATED 2/6/4
  
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 [email protected]
  
 1.)PROVIDE A DIMENSIONED SITE PLAN AND
 A SURVEY.
  
 2.)HISTORIC APPROVAL REQUIRED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2004-03-04 Cont ID  
Sent By shill Date 2004-03-04 Time 16:27 Rev Time 1.00
Received By shill Date 2004-03-04 Time 16:27 Sent To  
Notes
2004-03-04 00:00:00****CORRECTIONS****
  
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 [email protected]
  
 1.)PROVIDE TWO COPIES OF PRODUCT
 APPROVALS FOR THE FRENCH DOORS, TRANSOM
 WINDOW AND MULLIONS.
  
 2.)HISTORIC APPROVAL REQUIRED BEFORE
 RESUBMITTAL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-07-16 Cont ID  
Sent By btrobaug Date 2004-02-24 Time 09:47 Rev Time 1.00
Received By sthyng Date 2003-07-16 Time 15:32 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-07-11 Cont ID  
Sent By shernand Date 2003-07-16 Time 10:46 Rev Time 1.50
Received By sthyng Date 2003-07-11 Time 10:29 Sent To  
Notes
2003-07-11 00:00:00*******CORRECTIONS*******
  
 1.)THE SBCCI PRODUCT APPROVALS FOR
 THE STORM PANELS ARE DIFFICULT TO READ.
 SEE ATTACHED FOR INSTRUCTIONS TO
 OBTAIN PRODUCT APPROVALS ON LINE.
  
 2.)THE MARVIN WINDOW DOCUMENTS ARE
 PRODUCT INFORMATION, NOT PRDUCT
 APPROVALS.PROVIDE TWO COPIES OF
 PRODUCT APPROVALS OR TESTING REPORTS.
  
 3.)WINDOWS S (BATH) MUST COMPLY WITH
 FBC2405.1 (SAFETY GLASS).
  
 SAMANTHA THYNG, BUILDING PLANS EXAMINER
 561-805-6724 [email protected]

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2004-02-24 Cont ID  
Sent By mmclean Date 2004-02-24 Time 09:22 Rev Time 0.50
Received By btrobaug Date 2004-02-24 Time 09:16 Sent To B
Notes
2004-02-24 00:00:00 
 SENT TO ZONING,ADDITIONAL SQUARE FOOTAGE
 BEING ADDED./WRT.

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2004-04-20 Cont ID  
Sent By csiegber Date 2004-04-20 Time 16:45 Rev Time 0.00
Received By csiegber Date 2004-04-20 Time 16:45 Sent To B
Notes
2004-04-20 00:00:00TO SH DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2004-04-01 Cont ID  
Sent By csiegber Date 2004-04-01 Time 14:40 Rev Time 0.00
Received By csiegber Date 2004-04-01 Time 14:40 Sent To B
Notes
2004-04-01 00:00:00TO SH DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2004-03-19 Cont ID  
Sent By mmclean Date 2004-03-26 Time 13:30 Rev Time 0.00
Received By csiegber Date 2004-03-19 Time 12:57 Sent To  
Notes
2004-03-19 00:00:00RESUB

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2004-02-19 Cont ID  
Sent By csiegber Date 2004-02-19 Time 14:37 Rev Time 0.00
Received By csiegber Date 2004-02-19 Time 14:37 Sent To B
Notes
2004-02-19 00:00:00TO SH DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2004-02-19 Cont ID  
Sent By csiegber Date 2004-02-19 Time 11:52 Rev Time 0.00
Received By csiegber Date 2004-02-19 Time 11:52 Sent To E
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-07-16 Cont ID  
Sent By shernand Date 2003-07-16 Time 10:46 Rev Time 0.00
Received By shernand Date 2003-07-16 Time 10:46 Sent To B
Notes
2003-07-16 00:00:00STHYNG DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-07-08 Cont ID  
Sent By shernand Date 2003-07-08 Time 09:16 Rev Time 0.00
Received By shernand Date 2003-07-08 Time 09:16 Sent To B
Notes
2003-07-08 00:00:00MISC BOX

Review Stop Z ZONING
Rev No 2 Status P Date 2004-03-26 Cont ID  
Sent By mmclean Date 2004-03-26 Time 13:30 Rev Time 0.00
Received By mmclean Date 2004-03-26 Time 13:30 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2004-02-24 Cont ID  
Sent By csiegber Date 2004-03-19 Time 12:57 Rev Time 0.00
Received By mmclean Date 2004-02-24 Time 09:22 Sent To E
Notes
2004-02-24 00:00:00DENIED, NEED 2 COPY OF SURVEY SHOWING
 THE ADDITION OF NEW PORCH MM


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved