Plan Review Details - Permit 03060255
Plan Review Stops For Permit 03060255
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-07-30 Cont ID  
Sent By lsmith Date 2003-07-30 Time 10:48 Rev Time 0.75
Received By lsmith Date 2003-07-30 Time 10:48 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-06-23 Cont ID  
Sent By kstevens Date 2003-07-17 Time 09:22 Rev Time 0.75
Received By lsmith Date 2003-06-23 Time 12:52 Sent To  
Notes
2003-06-23 00:00:00SHOW METHOD OF PROTECTING POOL FROM
 OPENINGS (WINDOWS & DOORS) IN HOUSE
 LEADING TO POOL ON PLANS.

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2003-07-30 Cont ID  
Sent By dpalmer Date 2003-07-30 Time 12:57 Rev Time 0.33
Received By dpalmer Date 2003-07-30 Time 12:57 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2003-07-29 Cont ID  
Sent By dpalmer Date 2003-07-29 Time 13:25 Rev Time 0.25
Received By dpalmer Date 2003-07-29 Time 13:25 Sent To P
Notes
2003-07-29 00:00:00******** PASSED ELECTRCIAL BUT PLANS
 HAVE NOT BEEN STAMPED DUE TO PLUMB
 COMMENTS. PLUMB AND ELECTRICAL SHOWN
 ON SAME SHEETS.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-07-09 Cont ID  
Sent By kstevens Date 2003-07-29 Time 09:20 Rev Time 0.50
Received By dpalmer Date 2003-07-09 Time 15:09 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2003-06-18 Cont ID  
Sent By shernand Date 2003-07-07 Time 15:28 Rev Time 0.33
Received By dpalmer Date 2003-06-18 Time 08:37 Sent To B
Notes
2003-06-18 00:00:00************** UNSAT ******************
  
 1)NOTE: PLEASE SUBMIT LOAD CALCULATIONS
 FOR NEW HEAT PUMP AND EQUIPMENT WITH
 EXISTING SERVICE.215-5
  
 2)NOTE: PLEASE VERIFY # OF PUMPS SHOWN,
 CLARIFY WHAT OR SAME PUMPS BEING USED
 FOR CLEANING SYSTEM?
  
 3)NOTE: PLEASE SEE ELECTRICAL DIAGRAM,
 NO HEAT PUMP SHOWN. WIRING ETC.
  
 PLEASE SUBMIT SPECS ON HEAT PUMP.
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-07-22 Cont ID  
Sent By alange Date 2003-07-22 Time 16:01 Rev Time 0.00
Received By alange Date 2003-07-22 Time 16:01 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-07-07 Cont ID  
Sent By shernand Date 2003-07-07 Time 15:27 Rev Time 0.00
Received By shernand Date 2003-07-07 Time 15:27 Sent To E
Notes
2003-07-07 00:00:00DP DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-06-04 Cont ID  
Sent By shernand Date 2003-06-04 Time 13:51 Rev Time 0.00
Received By shernand Date 2003-06-04 Time 13:51 Sent To Z
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status P Date 2003-07-29 Cont ID  
Sent By dpalmer Date 2003-07-29 Time 13:25 Rev Time 0.50
Received By kstevens Date 2003-07-29 Time 09:20 Sent To E
Notes
2003-07-29 00:00:00PASSED/PROVISO
  
 A&A IN FLOOR INSTALLATION BOOKLET REQ-
 UIRED ON JOB FOR FINAL INSPECTION.

Review Stop P PLUMBING
Rev No 2 Status F Date 2003-07-17 Cont ID  
Sent By alange Date 2003-07-22 Time 16:02 Rev Time 1.00
Received By kstevens Date 2003-07-11 Time 17:40 Sent To B
Notes
2003-07-17 00:00:00DENIED
 REFERENCE: FBC-2001 424.2 SWIMMING POOLS
  
  
 MORE INFORMATION REQUIRED.
 IF QUICK CLEAN SYSTEM TIES INTO POOL
 EQUIPMENT AS A SUCTION AND RETURN LINE,
 IT SHALL BE SHOWN ON THE PIPING SCHEMAT-
 IC.
  
 DOES THE FUTURE FOUNTAIN STUB-UP, WHICH
 IS SHOWN AS A RETURN IN PIPING SCHEMATIC
 TIE INTO THE EXISTING PUMP OR WILL IT
 HAVE A SEPARATE PUMP? ALSO WILL THE
 PUMP FOR THIS FEATURE BE LOCATED WHERE
 THE 2" SIDE SUCTION STUB-UP ON THE PATIO
  
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692

Review Stop P PLUMBING
Rev No 1 Status F Date 2003-06-20 Cont ID  
Sent By dpalmer Date 2003-07-09 Time 15:09 Rev Time 1.00
Received By kstevens Date 2003-06-17 Time 11:50 Sent To B
Notes
2003-06-20 00:00:00DENIED
 REFERENCE: FBC-2001 424.2 SWIMMING POOLS
  
 1) SPECIFICATION SHT ON THE "QUICKCLEAN"
 SYSTEM. PLEASE INDICATE IF THIS SYSTEM
 TIES INTO THE POOL EQUIPMENT, I.E. THE
 PUMP AND FILTER. THIS IN NOT INDICATED
 ON THE PIPING SCHEMATIC.
 2) SPEC. SHT ON THE "QUICKCLEAN" SYSTEM
 HAS NOTES THAT STATE, "SEE REQUIRED
 METHOD OF PLUMBING A CHLORINE FEEDER
 WITH THIS SYSTEM." (PAGE 20). AND "A
 HEATER BY-PASS IS REQUIRED FOR THIS
 SYSTEM". (PAGE 22). THIS INFORMATION HAS
 NOT BEEN SUBMITTED. PLEASE SUBMIT THE
 AFORMENTIONED INFORMATION FOR REVIEW.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692

Review Stop Z ZONING
Rev No 1 Status P Date 2003-06-04 Cont ID  
Sent By shernand Date 2003-06-04 Time 13:51 Rev Time 1.00
Received By mmclean Date   Time   Sent To P
Notes
***NONE***