Plan Review Details - Permit 03060121
Plan Review Stops For Permit 03060121
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2003-07-02 Cont ID  
Sent By sthyng Date 2003-07-02 Time 13:55 Rev Time 1.00
Received By sthyng Date 2003-07-02 Time 13:55 Sent To  
Notes
2003-07-02 00:00:00REVISION TO REM ALUM SIDING, STUCCO,
 ADD 1 WINDOW

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-06-17 Cont ID  
Sent By shernand Date 2003-07-02 Time 11:21 Rev Time 1.00
Received By sthyng Date 2003-06-17 Time 16:13 Sent To  
Notes
2003-06-17 00:00:00*****PROVISO******
 SCHEDULE A PRE-INSPECT
 BEFORE WORK BEGINS.
 805-8404 LOU HATTEN

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-06-09 Cont ID  
Sent By shernand Date 2003-06-17 Time 15:23 Rev Time 1.00
Received By sthyng Date 2003-06-09 Time 18:35 Sent To  
Notes
2003-06-09 00:00:00******CORRECTIONS*******
  
 SAMANTHA THYNG, BUILDING PLANS EXAMINER
 [email protected]
  
 1.)SHEET A2 HAS AN ARCHITECT'S BLOCK,
 SO IT MUST BE SIGNED AND SEALED BY THE
 ARCHITECT.
  
 2.)SHEET A2 HAS A NOTE FROM HISTORIC
 PRESERVATION THAT "ONLY INTERIOR WORK
 APPROVED", BUT THERE IS A NOTE TO MOVE A
 WINDOW, WHICH WOULD BE AN EXTERIOR
 CHANGE.CLARIFY.
  
 3.)IF A WINDOW IS RELOCATED, PROVIDE
 PRODUCT APPROVALS FOR THE WINDOW. IMPACT
 PROTECTION REQUIRED; SUBMIT PRODUCT
 APPROVALS.
  
 4.)PROVIDE PRODUCT APPROVALS FOR
 WINDOWS AND DOORS.IF PRODUCT APPROVALS
 ARE NOT SUBMITTED, YOU WILL BE REQUIRED
 TO APPLY FOR SEPARATE PERMITS FOR THOSE
 ITEMS.IMPACT PROTECTION REQUIRED FOR
 WINDOWS.
  
 5.)SHEET 4 ALSO HAS THE NOTATION FROM
 THE HISTORIC BOARD THAT ONLY INTERIOR
 WORK HAS BEEN APPROVED, BUT THE DRAWING
 SHOWS EXTERIOR WORK.CLARIFY.
  
 6.)IS ALL OF THE WORK ON SHEET A2
 A PART OF THIS PERMIT?IF NOT, REVISE
 THE DRAWING TO REFLECT THE SCOPE OF
 WORK TO BE COVERED UNDER THIS PERMIT.
  
 7.)THE BEDROOM IS REQUIRED TO HAVE
 EMERGENCY EGRESS, FBC 1005.4.SHOW THE
 EMERGENCY EGRESS ON THE PLAN.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-06-04 Cont ID  
Sent By shernand Date 2003-06-03 Time 13:59 Rev Time 0.33
Received By btrobaug Date 2003-06-04 Time 17:52 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-07-02 Cont ID  
Sent By shernand Date 2003-07-02 Time 11:21 Rev Time 0.00
Received By shernand Date 2003-07-02 Time 11:21 Sent To B
Notes
2003-07-02 00:00:00STHYNG DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-06-17 Cont ID  
Sent By shernand Date 2003-06-17 Time 15:23 Rev Time 0.00
Received By shernand Date 2003-06-17 Time 15:23 Sent To B
Notes
2003-06-17 00:00:00STHYNG DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-06-03 Cont ID  
Sent By shernand Date 2003-06-03 Time 13:59 Rev Time 0.00
Received By shernand Date 2003-06-03 Time 13:59 Sent To E
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-06-09 Cont ID  
Sent By btrobaug Date 2003-06-04 Time 17:55 Rev Time 0.25
Received By pkrauss Date 2003-06-09 Time 12:59 Sent To P
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2003-06-09 Cont ID  
Sent By pkrauss Date 2003-06-09 Time 13:03 Rev Time 0.25
Received By kstevens Date 2003-06-09 Time 13:19 Sent To B
Notes
2003-06-09 00:00:00NO PLUMBING PLANS SUBMITTED


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved