| Plan Review Stops For Permit 03060041 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2003-07-02 |
|
|
Cont ID |
|
| Sent By |
hpiskura |
Date |
2003-07-02 |
Time |
12:54 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
2003-07-02 |
Time |
12:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2003-06-16 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-06-16 |
Time |
09:38 |
Rev Time |
0.50 |
| Received By |
dpalmer |
Date |
2003-06-16 |
Time |
07:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2003-06-26 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2003-06-26 |
Time |
16:31 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2003-06-26 |
Time |
16:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2003-10-27 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-10-27 |
Time |
14:55 |
Rev Time |
0.00 |
| Received By |
csiegber |
Date |
2003-10-27 |
Time |
14:55 |
Sent To |
M |
|
| Notes |
| 2003-10-27 00:00:00 | TO PK BOX/REV |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2003-07-15 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-07-15 |
Time |
13:14 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-07-15 |
Time |
13:14 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2003-06-02 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-06-02 |
Time |
16:47 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-06-02 |
Time |
16:47 |
Sent To |
|
|
| Notes |
| 2003-06-02 00:00:00 | COMM BOARD #64 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
P |
Date |
2003-10-30 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2003-10-30 |
Time |
16:06 |
Rev Time |
0.45 |
| Received By |
pkrauss |
Date |
2003-10-30 |
Time |
16:06 |
Sent To |
|
|
| Notes |
| 2003-10-30 00:00:00 | PROVISO: | | | OVERFLOW PROTECTION REQUIRED AS PER | | | 2001 FBC(M) 307.2.3(AUXILIARY DRAIN PAN) |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2003-07-19 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-10-27 |
Time |
14:55 |
Rev Time |
0.30 |
| Received By |
pkrauss |
Date |
2003-07-19 |
Time |
08:32 |
Sent To |
|
|
| Notes |
| 2003-07-19 00:00:00 | PROVISO: | | | NOTES DATED 6/26/03 BY HAROLD MOSER | | | 1.HYDRONIC PIPING SYSTEMS SHALL BE | | | TESTED HYDRONICALLY AT ONE-HALF TIMES | | | THE MAXIMUM SYSTEM DESIGN PRESSURE, BUT | | | NOT LESS THAN 100 PSI.FROM RISER TO | | | A/C #1 & 2. | | | 2.HAVE PIPE DIAGRAM WITH PLANS WITH | | | PLANS. | | | 3.HAVE EQUIPMENT SPECIFICATION WITH | | | PLANS. | | | | | | NOTES FROM PATTY KRAUSS 7-19-03 | | | 1.PLAN SHEET M-1 INDICATES "PACKAGE | | | UNITS".PLEASE CLARIFY, ARE UNITS A | | | PART OF THE BUILDING A/C A CONDENSER | | | WATER SYSTEM?ARE THESE UNITS ACTUALLY | | | HEAT PUMPS? | | | 2.SHOULD UNITS BE HEAT PUMPS, INDICATE | | | LOCATION, DUCT SIZE AND MATERIAL OF | | | OUTSIDE AIR. | | | 3.PLEASE NOTE DUCT SMOKE DETECTORS TO | | | HAVE NOTIFICATION AS PER NFPA 90A - | | | 4-4.4. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | | CONTACT PATTY KRAUSS AT (561) 805-6719. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2003-06-26 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2003-07-18 |
Time |
17:16 |
Rev Time |
0.50 |
| Received By |
hmoser |
Date |
2003-06-26 |
Time |
19:54 |
Sent To |
|
|
| Notes |
| 2003-06-26 00:00:00 | PLAN DENIED | | | 1) HYDRONIC PIPING SYSTEMS SHALL BE | | | TESTED HYDRONICALLY AT ONE-HALF TIMES | | | THE MAXIMUM SYSTEM DESIGN PRESSURE, | | | BUT NOT LESS THAN 100 PSI.FROM RISER | | | TO A/C #1&2 | | | 2) HAVE PIPE DIAGRAM WITH PLANS WITH | | | PLANS | | | 3) HAVE EQUIPMENT SPECIFICATION WITH | | | PLANS | | | PLAN REVIEW BY HAROLD MOSER | | | (561)805-6732 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2003-07-18 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2003-07-18 |
Time |
16:49 |
Rev Time |
0.50 |
| Received By |
kstevens |
Date |
2003-07-18 |
Time |
16:48 |
Sent To |
M |
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2003-06-21 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-07-15 |
Time |
13:14 |
Rev Time |
0.50 |
| Received By |
kstevens |
Date |
2003-06-21 |
Time |
18:03 |
Sent To |
|
|
| Notes |
| 2003-06-21 00:00:00 | DENIED | | | REFERENCE: FBC-2001 PLUMBING | | | FBC-2001 CHAPTER 11 | | | | | | 1) INDICATE OCCUPANCY OF UNIT. MORE | | | COMMENTS MAY ARISE DEPENDING ON RESPONSE | | | 2) PROVIDE A SANITARY AND A WATER RISER | | | DIAGRAM. | | | 3) DRINKING FOUNTAIN IS REQUIRED PER | | | TABLE 403.1. ALSO SEE SECION 410.1 | | | 4) SUBMIT DETAIL FOR TOILET ROOM PER | | | SECTION 11-4.22 AND ALL SUBSECTION. | | | WATER CLOSET SHALL BE 18" TO WALL FROM | | | CENTER OF FIXTURE PER FIG 28. FIGURES | | | 30A AND 30E ARE FOR TOILET STALLS NOT | | | TOILET ROOMS. | | | | | | REVIEW BY KEN STEVENS | | | (561) 805-6721 | | | FAX (561) 653-2692 |
|
|