Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2003-07-10 Cont ID  
Sent By hpiskura Date 2003-07-10 Time 12:20 Rev Time 0.00
Received By hpiskura Date 2003-07-10 Time 12:20 Sent To E
Notes
2003-07-10 00:00:00REVISIONS DATED 7/3/03

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-06-06 Cont ID  
Sent By shernand Date 2003-07-08 Time 16:33 Rev Time 0.00
Received By hpiskura Date 2003-06-06 Time 08:25 Sent To E
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-05-29 Cont ID  
Sent By shernand Date 2003-06-02 Time 14:18 Rev Time 0.00
Received By hpiskura Date 2003-05-29 Time 11:56 Sent To  
Notes
2003-05-29 00:00:00PLEASE PROVIDE AN ANALYSIS OF THE
 EFFECTS OF THE ADDED FLOOR LOADS FROM
 THE STONE FLOORING TO BE INSTALLED,
 PREPARED BY AN ENGINEER OR ARCHITECT.
 SEE FBC 104.2.
  
 PROVIDE SPECIFIC CONSTRUCTION METHODS
 AND DETAIL FOR THE CUTTING OF THE POST
 TENSION FLOORS.
  
 PLEASE NOTE THE METHOD OF THE
 INSTALLATION OF THE WOOD FLOOR.

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2003-08-05 Cont ID  
Sent By btrobaug Date 2003-08-05 Time 09:57 Rev Time 0.50
Received By btrobaug Date 2003-08-05 Time 09:57 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2003-07-11 Cont ID  
Sent By alange Date 2003-07-31 Time 13:53 Rev Time 0.50
Received By btrobaug Date 2003-07-11 Time 17:25 Sent To  
Notes
2003-07-11 00:00:00PROVISO
 ~~~~~~~
 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
 PLEASE PROVIDE THE LETTER FROM THE
 ENGINEER OF RECORD REFFERED TO ON SHEET
 E1.1,REGARDING CHIPPING THE SLAB FOR
 REVIEW PRIOR TO COMMENCING THAT PORTION
 OF THE WORK.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-06-11 Cont ID  
Sent By hpiskura Date 2003-07-10 Time 12:20 Rev Time 0.33
Received By btrobaug Date 2003-06-11 Time 11:07 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2003-05-29 Cont ID  
Sent By hpiskura Date 2003-06-06 Time 08:53 Rev Time 1.00
Received By btrobaug Date 2003-05-29 Time 08:09 Sent To  
Notes
2003-05-29 00:00:00 
 DENIED
 ~~~~~~
 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
 PLEASE PROVIDE THE FOLLOWING
 INFORMATION WITH REGARD TO THE
 RELOCATION OF THE FLOOR BOXES.
  
 1} A LETTER FROM THE MANAGEMENT OF ONE
 WATERMARK STATING THEIR APPROVAL FOR
 DECK CUTTING IN THE UNITS.
  
 2} A LETTER FROM THE STRUCTURAL ENGINEER
 OF RECORD VERIFYING HIS APPROVAL OF THE
 OF THE DEPTHS AND LOCATION OF ANY CUTS
 BEING MADE AND THE FLOOR BOX SYSTEM
 BEING USED.
  
 3} PLEASE PROVIDE X-RAYS OF THE AREA TO
 BE CUT INDICATING ANY SUCH CUTS WILL NOT
 COMPROMISE THE INTEGRITY OF THE
 STRUCTURAL SYSTEM.
  
 PLEASE HAVE ALL DOCUMENTS BEING
 SUBMITTED SIGNED AND SEALED BY THE
 ENGINEER OF RECORD.
  
 IF THERE ARE ANY QUESTIONS PLEASE CALL.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718

Review Stop ENG ENGINEERING CSD
Rev No 1 Status N Date 2003-05-29 Cont ID  
Sent By hpiskura Date 2003-05-29 Time 12:09 Rev Time 0.00
Received By hpiskura Date 2003-05-29 Time 12:09 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2003-05-27 Cont ID  
Sent By nmccray Date 2003-05-27 Time 16:03 Rev Time 0.00
Received By nmccray Date 2003-05-27 Time 16:03 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2003-07-31 Cont ID  
Sent By alange Date 2003-07-31 Time 13:53 Rev Time 0.00
Received By alange Date 2003-07-31 Time 13:53 Sent To E
Notes
2003-07-31 00:00:00TO BT DESK

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-07-08 Cont ID  
Sent By shernand Date 2003-07-08 Time 16:33 Rev Time 0.00
Received By shernand Date 2003-07-08 Time 16:33 Sent To B
Notes
2003-07-08 00:00:00HP DESK

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-06-09 Cont ID  
Sent By shernand Date 2003-06-09 Time 08:31 Rev Time 0.00
Received By shernand Date 2003-06-09 Time 08:31 Sent To  
Notes
2003-06-09 00:00:00COMM BOARD #18

Review Stop I INCOMING/PROCESSING
Rev No 2 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By shernand Date 2003-06-02 Time 14:18 Sent To  
Notes
2003-06-02 00:00:00HP DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-05-27 Cont ID  
Sent By shernand Date 2003-05-27 Time 15:25 Rev Time 0.00
Received By shernand Date 2003-05-27 Time 15:25 Sent To  
Notes
2003-05-27 00:00:00COMM BOARD #28

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2003-05-29 Cont ID  
Sent By hpiskura Date 2003-05-29 Time 12:09 Rev Time 0.00
Received By hpiskura Date   Time   Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2003-05-29 Cont ID  
Sent By hpiskura Date 2003-05-29 Time 12:10 Rev Time 0.00
Received By hpiskura Date   Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status N Date 2003-05-29 Cont ID  
Sent By hpiskura Date 2003-05-29 Time 12:10 Rev Time 0.00
Received By hpiskura Date   Time   Sent To  
Notes
***NONE***