| Plan Review Stops For Permit 03051969 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
5 |
Status |
F |
Date |
2003-11-05 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-12-04 |
Time |
14:16 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2003-11-05 00:00:00 | USA SHOP DRAWINGS DATED 10/7/03.TWO | | | SETS OF SIGNED AND SEALED SHOP DRAWINGS | | | ARE REQUIRED, ONE FOR CITY RECORDS AND | | | ONE FOR CONTRACTOR FIELD USE. | | | | | | ALSO, THE DRAWINGS ARE REQUIRED TO BE | | | REVIEWED BY THE ENGINEER OF RECORD | | | PRIOR TO SUBMITTAL TO THE CITY. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2003-09-03 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-11-03 |
Time |
11:03 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
2003-09-03 |
Time |
12:48 |
Sent To |
|
|
| Notes |
| 2003-09-03 00:00:00 | PERMIT IS ISSUED WITH THE FOLLOWING | | | PROVISOS: | | | | | | THE WORK INCLUDED IN THIS PERMIT IS ONLY | | | THAT 7700 SQUARE FEET BUILDING AREA | | | SHOWN ON THE PLANS SHEET 100 DATED | | | 7/29/03. | | | | | | SHOP DRAWINGS FOR THE METAL BUILDING | | | MUST BE PROVIDED TO THE CONSTRUCTION | | | SERVICES DIVISION BEFORE ERECTION. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2003-08-05 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-09-03 |
Time |
11:37 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
2003-08-04 |
Time |
11:52 |
Sent To |
|
|
| Notes |
| 2003-08-04 00:00:00 | 3RD CHECKLIST.SEE THE ATTACHED FORM | | | RE: FL. STATUTE 553.80(2)(B) AND FEE | | | REQUIREMENTS. | | | | | | THE STAIRS SHOWN AS #122 DO NOT PROVIDE | | | A PROTECTED PATH TO THE EXTERIOR OF THE | | | BUILDING AS NOTED PREVIOUSLY IN MY | | | LISTSDATED 7/02/03 AND 7/24/03. | | | | | | THE ARCHITECT'S CORRIDOR DESIGN DOES | | | NOT COMPLY WITH THAT REQUIRED FOR A | | | STAIRSHAFT OR AN "EXIT PASSAGEWAY" AS | | | DECLARED IN HIS LETTER DATED 7/29/03. | | | | | | AN EXIT PASSAGEWAY AS DESCRIBED IN FBC | | | 1010.3 REQUIRES | | | COMPLIANCE WITH FBC 1006.1.3 | | | AND FBC 1006.1.3.1, FBC TABLE 705.1.2 | | | AND FBC 704.2.1.2. | | | | | | 1006.1.3 STATES THAT THE STAIRWAY | | | ENCLOSURE MAY NOT BE USED FOR ANY OTHER | | | PURPOSE THAN MEANS OF EGRESS. | | | | | | 1006.1.3.1 PROHIBITS ANY PENETRATIONS | | | EXCEPT FOR THOSE NECESSARY FOR THE | | | STAIR SHAFT ITSELF. | | | | | | THE ARCHITECT HAS AN ELEVATOR LOBBY, A/C | | | RETURN FROM THE OFFICES AND AN A/C | | | SUPPLY ABOVE THE CEILING WITHIN THE | | | CORRIDOR. | | | | | | THE UL P 204 CEILING DESIGN IS WITHOUT | | | STANDING BECAUSE IT IS A ROOF CEILING | | | DESIGN, AND NOT A "SHAFT" DESIGN, IN | | | ACCORDANCE WITH 704.2.1.2 AS NOTED IN | | | FBC 1010.3 CITED ABOVE.EVEN THAT THE | | | CEILING DESIGN WAS A FLOOR CEILING | | | DESIGN WHICH MORE CLOSELY APPROXIMATES | | | THIS SITUATION, IT IS NOT AN ACCEPTABLE | | | SOLUTION SINCE ITS INTENT IS TO PROTECT | | | THE STRUCTURE ABOVE AND NOT PEOPLE | | | WITHIN THE EXIT PASSAGE WAY LIKE A | | | SHAFT DESIGN WOULD.PLEASE REVISE AS | | | NECESSARY. | | | | | | FBC TABLE 705.1.2, FOR SHAFTS LESS THAN | | | FOUR STORIES, REQUIRES 1 HOUR OPENING | | | PROTECTIVES.THE ARCHITECT NOW SHOWS | | | DOORS AS "C".SEE FBC 705.1.3.2.1, FOR | | | FIRE DOOR CLASSIFICATIONS AS WAS | | | PREVIOUSLY NOTED, AND REVISE AS | | | NECESSARY.SEE ALSO FBC 705.1.3.4. | | | | | | THE SIX PAGES TITLED USA CALCULATIONS | | | HAVING ONLY A "RECEIVED" DATE STAMP FOR | | | AHRENS COMPANIES, ARE NOT SIGNED, SEALED | | | OR DATED WITH AN ORIGINAL SIGNATURE AND | | | AN EMBOSSED SEAL NOR ANY OF THE PAGES | | | NUMBERED. | | | | | | SEVERAL COPIES OF PAGES OF THE FBC WERE | | | INCLUDED WITH THE MOST RECENT SUBMITTAL. | | | AMONGST THEM IS PAGE 2.10 WITH THE | | | DEFINITION OF NON-COMBUSTIBLE HAVING A | | | HIGHLIGHT, A CIRCLE, AN ARROW AND AN | | | UNDERLINE. | | | | | | THE ARCHITECT'S LETTER OF 7/29/03 IN | | | ITEM #7 TENDERS THE ARGUMENT THAT | | | COMPLIANCE WITH "EITHER OF THE | | | FOLLOWING REQUIREMENTS" IS | | | SATISFACTORY.I AGREE.NOW PLEASE | | | DEMONSTRATE HOW THE FOAM "STRUCTURAL | | | BASE" SANDWICHED WITHIN THOSE PANELS IS | | | NON-COMBUSTIBLE WHEN TESTED TO E136 IN | | | ACCORDANCE WITH THE FIRST CLAUSE OF | | | CONDITION #2.I STIPULATE THAT THE | | | SURFACING OF ALUMINUM SKIN IS LESS THAN | | | 1/8" THICK AND PASSES E84. | | | | | | THE ARCHITECT'S LETTER REFERENCES FBC | | | 606, 707 AND 2603.4. AT ISSUE IS NOT | | | THAT OF INSULATION, OR COMBUSTIBLES IN | | | CONCEALED SPACES, BUT THAT OF A | | | STRUCTURAL COMPONENT ASSEMBLY REQUIRED | | | TO BE NON-COMBUSTIBLE BY TABLE 600. | | | | | | THIS IS THE THIRD REQUEST FOR THE | | | SPECIALTY ENGINEER'S INVESTIGATION OF | | | THE COMPONENTS AND CLADDING. | | | | | | I HAVE REVIEWED THE FACSIMILES FROM | | | ALUMASHIELD DATED 7/29/03 WHICH STATES | | | THE PRODUCT IS INELIGIBLE TO BE TESTED | | | AS NON-COMBUSTIBLE. | | | | | | PLEASE PROVIDE THE CONSTRUCTION METHOD | | | FOR THE THROUGH PENETRATION PROTECTION | | | THE EXIT PASSAGEWAY BY THE BAR JOISTS. | | | SEE FBC 705.5.1.2. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2003-07-24 |
|
|
Cont ID |
|
| Sent By |
hpiskura |
Date |
2003-07-24 |
Time |
10:12 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
2003-07-24 |
Time |
07:55 |
Sent To |
|
|
| Notes |
| 2003-07-24 00:00:00 | THE INTENDED HORIZONTAL EXTENSION OF | | | STAIR #122 DOES NOT COMPLY WITH FBC | | | 705.1.3.2.1, TABLE 705.1.2 AND 705.1.3.4 | | | IN THAT THE DOORS ENCLOSING THE "SHAFT | | | EXTENSION" ARE SHOWN AS HAVING ONLY A 20 | | | MINUTE RATING, AND SOME WITHOUT | | | CLOSERS, FBC 705.1.3.2.3 AND 705.1.5. | | | | | | THE STAIR "SHAFT EXTENSION" DOES NOT | | | COMPY WITH FBC 1006.1.3.1 IN THAT SHEET | | | 602 SHOWS A MAJORITY OF THE A/C DUCT | | | WORK TO BE LOCATED IN THE "SHAFT | | | EXTENSION" AS WELL AS BEING USED FOR A | | | RETURN AIR PLENUM.PLEASE REVISE AS | | | NECESSARY. | | | | | | PLEASE PROVIDE A CONSTRUCTION DETAIL FOR | | | THE PENETRATION PROTECTION METHOD OF | | | THE BAR JOISTS PERPENDICULAR TO THE | | | WALLS OF THE STAIR "SHAFT EXTENSION". | | | SEE FBC 704.2.1.2 AND FBC 705.5.1. | | | | | | THE PREVIOUSLY REQUESTED | | | CALCULATIONS FOR THE COMPONENTS AND | | | CLADDING HAVE NOT BEEN PROVIDED.THE | | | DELEGATED ENGINEER'S CALCULATIONS FOR | | | THE METAL BUILDING DO NOT SHOW ANY | | | INVESTIGATION FOR THE ROOF OR WALL | | | SHEATHING. | | | | | | THE ARCHITECT WHO ASSUMED THE | | | RESPONSIBILITY AS DESIGNER OF RECORD | | | PROVIDED A NOTE ON SHEET 304 IN THE | | | BLOCK TITLED "REQUIRED DESIGN | | | PARAMETERS FOR WIND" AND DECLARES A | | | MEAN ROOF HEIGHT AS "VARIES". | | | THIS IS IN CONFLICT WITH ASCE 7-98 | | | SECTION 6.5.6.3.1 THAT REQUIRES | | | BUILDINGS OF 60' HEIGHT OR LESS TO USE | | | VELOCITY PRESSURE Q SUB H WHICH IS | | | DEFINED AS MEAN ROOF HEIGHT OR EAVE | | | HEIGHT.ASCE 7-98 SECTION 6.3 | | | | | | THIS ISSUE IS EVEN MORE QUESTIONABLE | | | WHEN THE DECLARED DESIGN PRESSURES ARE | | | WITHIN 100THS OF 1 PSF OF THE NOA'S. | | | | | | THE INFORMATION PROVIDED FOR THE | | | ALUMA-SHIELD WALL PANELS DOES NOT SHOW | | | TESTING FOR ASTM E-136 TO DEMONSTRATE | | | NON-COMBUSTIBLE (FBC 202) TO COMPLY | | | WITH FBC 606 FOR TYPE IVCONSTRUCTION. | | | | | | THE L1 OF 1 USA SHEET DATED 7/9/03 | | | NOTES THE ROOF AS UL 90 BUT IS MISSING | | | THE UL CONSTRUCTION NUMBER. | | | | | | SITE PLAN SHEETS 101-105, AND THE FIRE | | | ALARM PLANS, ARE NOT SIGNED, SEALED AND | | | DATED. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2003-07-02 |
|
|
Cont ID |
|
| Sent By |
hpiskura |
Date |
2003-07-01 |
Time |
09:01 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
2003-06-27 |
Time |
13:44 |
Sent To |
|
|
| Notes |
| 2003-07-01 00:00:00 | BEFORE A PERMIT TO CONSTRUCT MAY BE | | | ISSUED IMPACT FEES MUST BE PAID TO PALM | | | BEACH COUNTY, THE PERMIT PLANS STAMPED | | | BY THAT OFFICE AND A COPY OF THE PAID | | | RECEIPT ATTACHED TO THE PERMIT | | | APPLICATION.CALL 561-233-5025 FOR | | | MORE INFORMATION. | | | | | | 1WHAT ARE THE DOTTED LINES IN THE | | | REPAIR #134 ON SHEET 301 INTENDED TO | | | REPRESENT? | | | | | | 2TWO EXITS ARE REQUIRED FROM REPAIR | | | AREA #134 AS SHOWN ON SHEET 301.SEE | | | FBC 1004.1.2 AND FBC 1004.1.4. | | | | | | 3AS A CONSEQUENCE OF THE ABOVE | | | CONDITION THE DISTANCE FROM THE | | | MEZZANINE EXCEEDS 100' FOR GROUP S AS | | | PROVIDED FOR IN FBC 1005.7.1. | | | | | | 4STAIR #122 FROM THE SECOND FLOOR | | | SHOWN ON SHEET 302 MUST DISCHARGE TO | | | THE OUTSIDE OF THE BUILDING.SEE FBC | | | 1010. | | | | | | 5SHEET 303.THE STAIRS FROM THE | | | MECHANICAL ROOM #218 DO NOT COMPLY WITH | | | FBC 1007.ALSO, THIS ROOM DOES NOT | | | DEFINE AS A MEZZANINE IN ACCORDANCE | | | WITH FBC 503.2.3. | | | | | | 6HOW WERE THE PRESSURES FOR THE | | | COMPONENTS AND CLADDING DETERMINED THAT | | | ARE CALLED OUT ON SHEETS 304 AND 305? | | | THE USA CALCULATIONS DO NOT SHOW AN | | | INVESTIGATION FOR COMPONENTS AND | | | CLADDING.PLEASE PROVIDE THE NECESSARY | | | CALCULATIONS, INCLUDING THOSE FOR THE | | | ROOF COVERING.NOTE THAT THE ROOF | | | COVERING MUST BE DESIGNED TO MEET ONE | | | OF STANDARDS IN FBC 1504.3 FOR THE WIND | | | PRESSURES IN FBC 1606. | | | | | | 7WHAT IS THE DESIGN LIVE LOAD FOR THE | | | SECOND FLOOR OFFICE AREA? | | | | | | 8SHEET L1 OF 1 OF THE USA PLANS | | | DECLARES 100# LL FOR THE MEZZANINE. | | | THE MINIMUM FOR LIGHT STORAGE IS 125#. | | | PLEASE REVISE AS NECESSARY.SEE FBC | | | TABLE 1604. | | | | | | 9A NOTE ON SHEET 306 DECLARES THAT THE | | | SKYLIGHTS ARE NOT REQUIRED TO BE | | | MISSILE IMPACT RESISTANT.THAT IS | | | INCORRECT.SEE FBC 2604.1.2. | | | | | | 10SHEET 310.PLEASE PROVIDE DETAILS, | | | SPECIFICATIONS FOR THE | | | THREE INCH ALUMA-SHIELD PANELS.INCLUDE | | | FIRE RESISTANCE AND WIND LOAD | | | TEST DATA.SEE FBC 104.2. | | | | | | 11PLEASE PROVIDE THE TEST DATA FOR | | | THE EXPOSED VINYL FACED INSULATION IN | | | THE METAL BUILDING.SEE FBC 708.3. | | | | | | 12SHOW HOW THE VENTILATION RATE OF 1.5 | | | CFM / SQUARE FOOT WILL BE ACCOMPLISHED. | | | SEE FBC 411.5.4 AND FBC TABLE M403.3 | | | FOR REPAIR GARAGES. | | | | | | 13THE DOORS SHOWN IN THE SCHEDULE ON | | | SHEET308 AS #9, #13 AND #33 ARE | | | REQUIRED TO BE 90 MINUTE RATED AND | | | LABLELED AND THOSE SHOWN AS #26 AND | | | #62, 60 MINUTE LABLELED AND RATED.SEE | | | FBC TABLE 705.1.2 FOR OCCUPANCY | | | SEPARATIONS AND STAIRS RESPECTIVELY. | | | SEE ALSO, FBC 411.5.3 RE: 9, 13, AND 33. | | | | | | 14 SHEET LS-1 CITES THE WRONG EDITION | | | OFTHE LIFE SAFETY CODE.SEE THE | | | FLORIDA FIRE PREVENTION CODE. | | | | | | 15LS-1, PLEASE CITE THE CITY OF WEST | | | PALM BEACH AMENDMENTS TO THE FBC, NOT | | | LAKE PARK. | | | | | | 16SHEET 401, FOUNDATION NOTES | | | DECLARES CONCRETE DESIGN TO ACI 301-72, | | | SEE FBC 1901.1 AND FBC 3502 FOR THE | | | CURRENT EDITION OF ACI 318 AND ENSURE | | | COMPLIANCE WITH SAME. | | | | | | 17NOA 01-08283.07 FOR THE ROLL UP | | | DOORS HAS ILLEGIBLE PAGES.NOA | | | 00-0508.4 FOR THE KAWNEER DOOR IS | | | EXPIRED. | | | | | | 18PLEASE PROVIDE AN ISTALLATION | | | SCHEDULE FOR THE SHUTTERS TO BE USED | | | INCLUDINGLOCATIONS, SIZES, SPANS, | | | FASTENERS AND ANY OTHER PERTINENT | | | INFORMATION. | | | | | | 19SECTION 10/318 WINDOW SECTION. | | | SHOWTHE METHOD OF FRAMING, BLOCKING, | | | ETC THAT WILL EXCEPT THE WINDOWS AND | | | DOORS.FBC 104.2. | | | | | | THE ENERGY CODE IS REQUIRED TO BE SIGNED | | | AND SEALED AND PREPARED FOR THE CITY OF | | | WEST PALM BEACH JURISDICTION 0604700. | | | SEE FBC 13-103.1.1.1. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2003-07-25 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-07-25 |
Time |
14:04 |
Rev Time |
1.00 |
| Received By |
dpalmer |
Date |
2003-07-25 |
Time |
14:03 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2003-06-09 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-06-09 |
Time |
08:11 |
Rev Time |
0.75 |
| Received By |
dpalmer |
Date |
2003-06-09 |
Time |
08:11 |
Sent To |
|
|
| Notes |
| 2003-06-09 00:00:00 | ************ UNSAT ************** | | | | | | 1)NOTE: PLEASE SEE NOTES TO ELECTRICAL, | | | MENTIONS, PALM BEACH COUNTY AMENDMENTS, | | | PLEASE NOTE, PRODJECT IS UNDER CITY OF | | | WEST PALM BEACH. | | | | | | 2)NOTE: PLEASE SHOW ALL CONTINUOUS LOADS | | | AT 125% MIN. 215-3/230-42 ETC | | | | | | 3)NOTE: PLEASE SHOW/CLARIFY SHOW WINDOW | | | OUTLETS REQ`D PER 210-62 | | | SIGNS/DISPLAY SIGN/ ADVERTISEMENTS ETC | | | REQ`D TO HAVE RECEPTS IN CLOSE PROXIMITY | | | W/OUT THE USE OF EXTENSION CORDS. | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | | REVIEW. IF THERE ARE ANY QUESTIONS, | | | PLEASE CALL. | | | | | | DEWEY PLAMER | | | ELECTRICAL PLAN REVIEW | | | 561-805-6717 | | | [email protected] |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
3 |
Status |
P |
Date |
2003-08-27 |
|
|
Cont ID |
|
| Sent By |
mamini |
Date |
2003-08-27 |
Time |
13:03 |
Rev Time |
0.50 |
| Received By |
mamini |
Date |
2003-08-27 |
Time |
13:03 |
Sent To |
|
|
| Notes |
| 2003-08-27 00:00:00 | PASSED: | | | 1. SEE PERMIT # 03081243 FOR UNDERGROUND | | | UTILITIES AND SITE WORK. | | | IF ANY QUESTION PLEASE CONTACT 805-6723 | | | MOHAMMAD R. AMINI |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
F |
Date |
2003-08-06 |
|
|
Cont ID |
|
| Sent By |
mamini |
Date |
2003-08-06 |
Time |
14:36 |
Rev Time |
1.00 |
| Received By |
mamini |
Date |
2003-08-06 |
Time |
14:36 |
Sent To |
|
|
| Notes |
| 2003-08-06 00:00:00 | FAILED: | | | 1. PLEASE NOTE THAT A SEPARATE PERMIT | | | APPLICATION AND FEES FOR UNDERGROUND | | | UTILITIES AND SITE WORK IS REQUIRED, | | | PLEASE SUBMIT TWO SETS OF CIVIL ONLY, | | | INCLUDING POLLUTION/EROSION PLANS | | | (SIGNED & SEALED). | | | IF ANY QUESTION PLEASE CONTACT 805-6723 | | | MOHAMMAD R. AMINI |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2003-05-28 |
|
|
Cont ID |
|
| Sent By |
mamini |
Date |
2003-05-28 |
Time |
13:09 |
Rev Time |
1.00 |
| Received By |
mamini |
Date |
2003-05-28 |
Time |
13:09 |
Sent To |
|
|
| Notes |
| 2003-05-28 00:00:00 | FAILED: | | | 1. PLEASE NOTE THAT A SEPARATE PERMIT | | | APPLICATION AND FEES FOR UNDERGROUND | | | UTILITIES AND SITE WORK WILL BE REQUIRED | | | 2. PLEASE SUBMIT A COPY OF SFWMD PERMIT | | | AND CALCULATION EITHER TO US, THE | | | CONSTRUCTION SERVICES OR TO PUBLIC | | | UTILITIES ENGINEERING SERVICES FOR | | | REVIEW AND APPROVAL. | | | 3. ALL THE WATER AND SEWER CONNECTIONS | | | MUST BE COORDINATED WITH CITY OF RIVIERA | | | BEACH. | | | 4. PLEASE NOTE THAT A DDCV ASSEMBLY ON | | | PRIVATE FIRE LINE IS REQUIRED. | | | 5. DRIVEWAY APPROACHES MUST BE PER CITY | | | OF WPB REQUIREMENTS, 6" CONCRETE FORM | | | CURB-CUT TO PROPERTY LINE. | | | 6. ANY WORK WITHIN MILITARY TRAIL R.O.W | | | REQUIRES PERMIT AND APPROVAL FROM FDOT. | | | 7. PLEASE CALL RODNEY COMPO FOR OIL / | | | WATER SEPARATOR REQUIREMENT/INSTALLATION | | | AND INSPECTION AT 837-4051 EXT. 4074 | | | IF ANY QUESTION PLEASE CONTACT 805-6723 | | | MOHAMMAD R. AMINI |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2003-08-08 |
|
|
Cont ID |
|
| Sent By |
nmccray |
Date |
2003-08-08 |
Time |
10:15 |
Rev Time |
0.00 |
| Received By |
nmccray |
Date |
2003-08-08 |
Time |
10:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2003-07-25 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2003-07-25 |
Time |
15:40 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2003-07-25 |
Time |
15:40 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2003-06-26 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2003-06-26 |
Time |
16:25 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2003-06-26 |
Time |
16:25 |
Sent To |
|
|
| Notes |
| 2003-06-26 00:00:00 | 1) PLEASE INDICATE HOW FIRE AND | | | PARAMEDICAL EQUIPMENT ENTER THRU THE | | | SITE VARIOUS GATES. | | | | | | 2) FIRE HYDRANT AND NEW FIRE PROTECTION | | | LINE. PLEASE INDICATE SIZE OF LINE. | | | | | | 3) PLEASE EXPLAIN PURPOSE OF ALL THE | | | GATES. WHY ARE SO MANY GATES LOCATED | | | ON THE PROPERTY. | | | | | | 4) PLEASE PROVIDE MORE DETAILS ON OIL | | | TANKS. | | | | | | 5) PLEASE PROVIDE A LIFE SAFETY PLAN | | | INDICATING OCCUPANT LOADS, TRAVEL | | | DISTANCES, DEAD-ENDS, ETC. | | | | | | 6) WHAT ACTIVITIES WILL OCCUR WITHIN | | | REAIR 134. | | | | | | 7) PLEASE INDICATE INTERIOR FINISH | | | CLASSIFICATION FOR WALLS AND CEILINGS. | | | | | | 8) SHAFTWAYS ARE TO BE MARKED. | | | | | | 9) PROVIDE SEPARATE PLANS FOR FIRE | | | ALARM SYSTEM. | | | | | | MIKE CARSILLO, ASSISTANT FIRE MARSHAL | | | 659-8096,EXT.8497 | | | 835-2910 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
6 |
Status |
N |
Date |
2003-12-04 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-12-04 |
Time |
14:16 |
Rev Time |
0.00 |
| Received By |
csiegber |
Date |
2003-12-04 |
Time |
14:15 |
Sent To |
B |
|
| Notes |
| 2003-12-04 00:00:00 | TO HP DESK/SUBMITTAL |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2003-11-03 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-11-03 |
Time |
11:03 |
Rev Time |
0.00 |
| Received By |
csiegber |
Date |
2003-11-03 |
Time |
11:03 |
Sent To |
B |
|
| Notes |
| 2003-11-03 00:00:00 | TO HP DESK/SUBMITTAL |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2003-09-03 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-09-03 |
Time |
11:37 |
Rev Time |
0.00 |
| Received By |
csiegber |
Date |
2003-09-03 |
Time |
11:37 |
Sent To |
B |
|
| Notes |
| 2003-09-03 00:00:00 | TO HP DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2003-08-01 |
|
|
Cont ID |
|
| Sent By |
alange |
Date |
2003-08-01 |
Time |
13:01 |
Rev Time |
0.00 |
| Received By |
alange |
Date |
2003-08-01 |
Time |
13:01 |
Sent To |
|
|
| Notes |
| 2003-08-01 00:00:00 | TO COMM BD #40 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2003-07-18 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-07-18 |
Time |
11:14 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-07-18 |
Time |
11:14 |
Sent To |
|
|
| Notes |
| 2003-07-18 00:00:00 | COMM BOARD #56 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2003-05-27 |
|
|
Cont ID |
|
| Sent By |
sgraham |
Date |
2003-06-06 |
Time |
11:43 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-05-27 |
Time |
16:41 |
Sent To |
|
|
| Notes |
| 2003-05-27 00:00:00 | COMM BOARD #14 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
P |
Date |
2003-08-04 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2003-08-04 |
Time |
07:41 |
Rev Time |
1.10 |
| Received By |
pkrauss |
Date |
2003-08-04 |
Time |
07:41 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
F |
Date |
2003-07-28 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2003-07-26 |
Time |
09:30 |
Rev Time |
2.00 |
| Received By |
pkrauss |
Date |
2003-07-26 |
Time |
08:52 |
Sent To |
|
|
| Notes |
| 2003-07-26 00:00:00 | PER CONVERSATION WITH MR. DON BOITNOTT | | | ON 7-28-03. | | | CORRIDOR 121 (FIRE EGRESS HALL) - | | | PLEASE PROVIDE THE FOLLOWING INFORMATION | | | 1) A DETAIL OF THE WALL AND CEILING | | | ASSEMBLY.INDICATE WHERE THE WALL | | | RATING ENDS. | | | | | | 2) AS PER OUR CONVERSATION THIS IS A | | | DUCTED SYSTEM (NO PLENUM), PROVIDE DUCT | | | SIZE BETWEEN THE TRANSFER GRILLES. | | | | | | 3) CEILING FIRE DAMPERS REQUIRED AS PER | | | 2001 FBC(M) 607.2.PER OUR CONVERSATION | | | SECTION 705.1.2.2.1, EXCEPTIONS #2, | | | EXCEPTIONS EXPLAINED IN THIS SECTION ARE | | | FOR WALLS OR PARTITIONS.CEILINGS ARE | | | NOT CONSIDERED PARTIONS AS DEFINED IN | | | THE 2001 FBC CHAPTER 2.THE EXECPTIONS | | | ALSO HAVE TO COMPLY WITH ALL FIVE | | | REQUIREMENTS LISTED UNDER #2. | | | | | | SEE ALSO COMMENTS BY BUILDING & FIRE. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | | CONTACT PATTY KRAUSS AT (561) 805-6719. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2003-07-01 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2003-06-10 |
Time |
13:59 |
Rev Time |
0.00 |
| Received By |
pkrauss |
Date |
2003-06-10 |
Time |
13:58 |
Sent To |
|
|
| Notes |
| 2003-06-10 00:00:00 | | | | PLEASE PROVIDE THE FOLLOWING INFORMATION | | | | | | 1.PLEASE CLARIFY PLAN SHEET 603 UNDER | | | THE ASHRAE REQUIRMENTS ZONE A IS LISTED | | | AS WAREHOUSE AND PLAN SHEET 302 SHOWS | | | THIS SPACE REPAIR.THE REQUIREMENTS FOR | | | A WAREHOUSE DIFFER FROM A REPAIR GARAGE. | | | .05 CFM/SQ FT IS REQUIRED FOR A | | | WAREHOUSE WHEREAS 1.5 CFM/PER SQ FT IS | | | REQUIRED FOR A REPAIR GARAGE. | | | | | | 2.PLEASE INDICATE WHAT WILL BE STORED | | | IN ZONE B, (I.E. COMBUSTIBLES?) | | | | | | 3.PLAN SHEET 601 - AIR CONDITIONING | | | LEGEND DUCT SMOKE DETECTOR SEE NOTE 27, | | | SHEET 603.THERE IS NOT A NOTE 27 ON | | | SHEET 603.PLEASE CLARIFY. | | | | | | 4.PLEASE NOTE DUCT SMOKE DETECTOR | | | SHALL BE INSTALLED IN THE SUPPLY AS PER | | | 2001 FBC(M) 606.2.1. | | | | | | 5.PLAN SHEET 502 INDICATES CONDENSATE | | | AND OVERFLOW DRAINS THAT APPEAR TO RUN | | | TOGETHER TO DRYWELL.AS PER 2001 FBC | | | (M) 307.2.3 & 307.2.4, SECONDARY DRAIN | | | TO TERMINATE AT A CONSPICUOUS POINT OR | | | A FLOAT SWITCH WILL SUFFICE. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2003-08-08 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2003-08-08 |
Time |
13:16 |
Rev Time |
2.50 |
| Received By |
kstevens |
Date |
2003-08-08 |
Time |
13:16 |
Sent To |
|
|
| Notes |
| 2003-08-08 00:00:00 | PASSED/PROVISO | | | | | | BREAK ROOM SINKS SHALL COMPLY WITH SEC | | | 11-4.24 AND ALL SUBSECTIONS. (SEE SHEET | | | 307) | | | MANUFACTURE INFORMATION FOR SUMP PUMP | | | REQUIRED ON JOB AT TIME OF FINAL PLUMB- | | | ING INSPECTION. PUMP SHALL BE LISTED & | | | LABELED PER SECTION 303.4 | | | | | | | | | | | | ---------WHEN RESUBMITTING PLANS-------- | | | PLEASE CLEARLY INDICATE THE REVISION AND | | | REMOVE AND REPLACE ANY PAGES AS NECESS- | | | ARY. SUBMIT (1) SET OF OLD DRAWINGS WITH | | | THE PLANS WHEN RESUBMITTING PLANS. A | | | TRANSMITTAL LETTER LISTING THE ORIGINAL | | | REVIEW NUMBER, WITH A DESCRIPTION OF THE | | | REVISION MADE, IDENTIFYING THE SHEET OR | | | SPECIFICATION PAGE WHERE THE CHANGES CAN | | | BE FOUND, WILL HELP TO EXPEDITE YOUR | | | PERMIT. THANK YOU FOR YOUR ANTICIPATED | | | COOPERATION. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2003-07-26 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2003-07-26 |
Time |
06:59 |
Rev Time |
1.25 |
| Received By |
kstevens |
Date |
2003-07-26 |
Time |
06:59 |
Sent To |
|
|
| Notes |
| 2003-07-26 00:00:00 | DENIED | | | REFERENCE: FBC-2001 PLUMBING | | | FBC-2001 CHAPTER 11 | | | | | | 1) FROM PREVIOUS REVIEW: (COMMENT #5) | | | SINKS SHALL COMPLY WITH 11-4.24 AND ALL | | | SUBSECTIONS. SHOW KNEE CLEARANCE SECTION | | | 11-4.24.3, CLEAR FLOOR SPACE 11-4.24.5, | | | EXPOSED PIPES AND SURFACES 11-4.24.6, & | | | FAUCETS 11-4.24.7. MECHANIC'S BREAK ROOM | | | SHALL COMPLY ALSO. | | | 2) INFORMATIONAL ALL DRINKING FOUNTAINS | | | SHALL COMPLY PER SECTION 11-4.1.3(10)(B) | | | AS THERE ARE ONLY ONE ON EACH FLOOR AS | | | INDICATED BY RESPONSE TO COMMENT #2 OF | | | PREVIOUS REVIEW. | | | 3) FROM PREVIOUS REVIEW: (COMMENT #11) | | | MANUFACTURE INFORMATION REQUIRED FOR | | | SUMP PUMP. SUBMIT MANUFACTURE CUT SHEETS | | | FOR THIS PUMP. 104.2.1 & PLMB. SECTION | | | 303.4 | | | 4) THE VENT INSTALLED FOR THE EWC IN THE | | | REPAIR AREA IS NOT INSTALLED PROPERLY. | | | THE TRAP IS AN "S" TRAP AND THE VENT | | | SHALL BE SHOWN AS A STACK VENT FOR THE | | | EWC. | | | 5) TABLE 906.1 THE TRAP FOR THE TRENCH | | | DRAIN IN THE REPAIR AREA IS OVER THE | | | MAXIMUM ALLOWABLE DISTANCE FROM THE VENT | | | PLACE VENT IN WALL AS CLOSE AS POSSIBLE | | | AND PUT TRAP 12' FROM VENT. AT TOP OF | | | THE TRAP PUT IN A CLEANOUT AND TEE OFF | | | TRAP RISER TO TRENCH DRAIN. SEE ATTACHED | | | SHEET FOR EXAMPLE. | | | 6) THERMAL EXPANSION CONTROL IS REQUIRED | | | PER SECTION 607.3.2 | | | | | | REVIEW BY KEN STEVENS | | | (561) 805-6721 | | | FAX (561) 653-2692 | | | E-MAIL [email protected] |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2003-06-16 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2003-06-16 |
Time |
17:34 |
Rev Time |
2.00 |
| Received By |
kstevens |
Date |
2003-06-16 |
Time |
17:34 |
Sent To |
|
|
| Notes |
| 2003-06-16 00:00:00 | DENIED | | | REFERENCE: FBC-2001 PLUMBING | | | FBC-2001 CHAPTER 11 | | | FBC-2001 AMENDMENTS TO THE | | | FLA. BLDG. CODE, CHAPTER 1, | | | AMENDMENTS TO BLDG. ECT. | | | | | | 1) CONTACT RODNEY COMPO, INDUSTRIAL PRE- | | | TREATMENT, ENVIRONMENTAL COMPLIANCE FOR | | | SIZING OF SAND/OIL INTECEPTOR. WASTE ORD | | | # 2938-96. (561) 837-4074 | | | 2) SUBMIT CALCULATION FOR MINIMUM FIX- | | | TURE REQUIREMENTS PER TABLE 1003.1, AND | | | TABLE 403.1. | | | 3) SHT 303 SHOW CLEAR FLOOR SPACE AND 5' | | | TURINING CIRCLE PER SEC 11-4.22.3 | | | 4) SHT 307 DETAIL #3, SHOWER - SHOW CON- | | | TROL HEIGHT. 11-4.21.5, AND CURB SECTION | | | 11-4.21.2.7 | | | 5) SHT 307 DETAILS #'S 7 & 8, SINKS | | | SHALL COMPLY WITH 11-24 AND ALL SUB- | | | SECTIONS. PLEASE SHOW ON DETAIL. | | | 6) SHT 307 DETAIL #9, DRINKING FOUNTAIN, | | | PROVISIONS SHALL BE MADE FOR THOSE WHO | | | HAVE DIFFICULTY BENDING OR STOOPING. SEC | | | 11-4.1.3(10). | | | 7) SHT 502 SANT. RISER DIAGRAM DOES NOT | | | MEET CODE REQUIREMENTS. EWC IN REPAIR | | | AREA #134 NOT VENTED. URNAL & LAV NOT | | | VENTED IN MECH. BATH #106. EWC NOT VENT- | | | ED OUTSIDE TOILET ROOMS #'S 125 & 126. | | | 8) SUBMIT A WATER RISER DIAGRAM. | | | 9) SUBMIT A COMPRESSED AIR RISER DIAGRAM | | | 10) SUBMIT A CONDENSATE RISER DIAGRAM. | | | 11) SHT 502 SUBMIT MANUF. INFO FOR SUMP | | | PUMP. SEC 104.2.1 (FOR COMMENT # 8, 9, | | | 10, & 11). | | | | | | REVIEW BY KEN STEVENS | | | (561) 659-8096 EXT 8377 | | | (561) 805-6721 | | | FAX (561) 653-2692 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2003-06-06 |
|
|
Cont ID |
|
| Sent By |
mmclean |
Date |
2003-06-05 |
Time |
16:42 |
Rev Time |
1.00 |
| Received By |
sgraham |
Date |
|
Time |
|
Sent To |
I |
|
| Notes |
| 2003-06-05 00:00:00 | 6/5/03 PASS ZONING (RANDALL EXT 8365) |
|
|