Plan Review Details - Permit 03050824
Plan Review Stops For Permit 03050824
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2003-10-22 Cont ID  
Sent By sthyng Date 2003-10-22 Time 14:13 Rev Time 0.50
Received By sthyng Date 2003-10-22 Time 16:22 Sent To  
Notes
2003-10-22 00:00:00PROVISO - SUBMIT MULLION PRODUCT
 APPROVAL

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2003-06-30 Cont ID  
Sent By sthyng Date 2003-06-30 Time 10:09 Rev Time 0.50
Received By sthyng Date 2003-06-30 Time 10:09 Sent To B
Notes
2003-06-30 00:00:00******CORRECTIONS*******
  
 SAMANTHA THYNG, BUILDING PLANS EXAMINER
 [email protected]
  
 1.)SEPARATE PERMITS REQUIRED.
  
 2.)SEE PREVIOUS CORRECTION LIST, ITEM
 #2, IMPACT PROTECTION REQUIRED FOR
 WINDOWS, FBC1606.1.4.
  
 3.)SEE PREVIOUS CORRECTION LIST, ITEM
 #3, TWO LEGIBLE PRODUCT APPROVALS MUST
 BE SUBMITTED:
 ROOF (MAY BE SUBMITTED WITH ROOF
 PERMIT)
 IMPACT PROTECTION
 MULLIONS
  
 4.)TWO COPIES OF THE WINDOW PRODUCT
 APPROVAL MUST BE SUBMITTED (ONLY ONE
 SUBMITTED).
  
 5.)SEE PREVIOUS CORRECTION LIST, ITEM
 #4, THE WINDOW AT THE TUB LOCATION IS
 REQUIRED TO BE SAFETY GLASS, FBC2405.2.
  
  
  
 SENT TO MIKE SIZEMORE FOR PREINSPECT

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-06-16 Cont ID  
Sent By shernand Date 2003-06-30 Time 09:43 Rev Time 1.00
Received By sthyng Date 2003-06-16 Time 09:04 Sent To E
Notes
2003-06-16 00:00:00*******CORRRECTIONS*******
  
 SAMANTHA THYNG, BUILDING PLANS EXAMINER
 [email protected]
  
 1.)SEPARATE PERMITS REQUIRED.
  
 2.)IMPACT PROTECTION REQUIRED FOR
 WINDOWS, FBC1606.1.4.
  
 3.)TWO LEGIBLE COPIES OF ALL PRODUCT
 APPROVALS MUST BE SUMBITTED:
 ROOF (MAY BE SUBMITTED WITH ROOF
 PERMIT)
 IMPACT PROTECTIONS
 WINDOWS
 MULLIONS
  
 4.)THE WINDOW AT THE TUB LOCATION IS
 REQUIRED TO BE SAFETY GLASS, FBC2405.2.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-06-19 Cont ID  
Sent By btrobaug Date 2003-06-19 Time 08:18 Rev Time 0.50
Received By btrobaug Date 2003-06-19 Time 07:08 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-10-22 Cont ID  
Sent By sthyng Date 2003-10-22 Time 14:13 Rev Time 0.00
Received By sthyng Date 2003-10-22 Time 14:14 Sent To B
Notes
2003-10-22 00:00:00TO ST DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-06-30 Cont ID  
Sent By shernand Date 2003-06-30 Time 09:43 Rev Time 0.00
Received By shernand Date 2003-06-30 Time 09:42 Sent To B
Notes
2003-06-30 00:00:00STHYNG DESK