Plan Review Details - Permit 03050335
Plan Review Stops For Permit 03050335
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-06-24 Cont ID  
Sent By jgomez Date 2003-06-24 Time 08:44 Rev Time 0.25
Received By jgomez Date 2003-06-24 Time 08:44 Sent To  
Notes
2003-06-24 00:00:00ENERGY CALCULATIONS AND WINDOW MULLION
 SUBMITTAL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2003-06-16 Cont ID  
Sent By shernand Date 2003-06-20 Time 11:10 Rev Time 4.00
Received By jgomez Date 2003-06-13 Time 18:51 Sent To PC
Notes
2003-06-16 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-PROVIDE COMPLETE BULDING SECTION THRU
 FRAMED WALLS AT SECOND FLOOR. SPECIFY
 ALL FASTENERS TOP AND BOTTOM.
 **NOTE: STUCCO TO BE 7/8" MIN. AS PER
 ASTM C-926.
 2-GLASS BLOCK AT BATH TUB AREA TO BE
 SAFETY GLASS IF FACE THICKNESS IS LESS
 THAN 0.25". SEC. 2405.2 FBC 2001.
 3-PROVIDE GENERAL SPECIFICATIONS FOR
 FIREBLOCKING AT ALL CONCEALED SPACES,
 NOT JUST THE UNDERSIDE OF STAIRS. SEE
 SEC. 2305 FBC 2001.
 4-REVISE ENERGY CALCULATIONS: A)OWNER
 INFORMATION IS NOT CORRECT.
 B)COMPLETE HOUSE ADDRESS. ETC.
  
 5-PRODUCT APPROVAL FOR ALUMINUM MULLIONS
 IS EXPIRED. RESUBMIT CURRENT ONE.
 6-PROVIDE SOIL TEST REPORT PRIOR TO
 CONTRUCTION.
 7-SPECIFY CONNECTOR FOR TRUSS ON DETAIL
 1/S2. SEC. 104.2.1.2 CITY AMENDMENTS
 8-CLARIFY EXTERIOR STUCCO SOOFIT SPECS.
 ON SHEET A-5. NOTES ARE NOT CLEAR AND
 SOME ARE REPETITIVE. REVISE AS REQ'D.
 SEE ASTM C-926 AND ASTM C-1063.
 9-THERE ARE SOME CONNECTORS MISSING. SEE
 COMMENTS ON PLANS. SEC. 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001.
 10-UPDATE ALL TRUSS ANCHOR AND DETAILS
 THAT ARE AFFECTED BY SEC. 1609.4.3
 FBC 2001, WHICH DOESN'T ALLOW THE
 ALLOWABLE STRESS INCREASE TO BE USED.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-10-02 Cont ID  
Sent By dpalmer Date 2003-10-02 Time 11:56 Rev Time 0.33
Received By dpalmer Date 2003-10-02 Time 11:56 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-05-19 Cont ID  
Sent By csiegber Date 2003-09-23 Time 16:39 Rev Time 0.25
Received By dpalmer Date 2003-05-19 Time 06:22 Sent To P
Notes
2003-05-19 00:00:00*********** PROVSIO/ REVISION **********
  
 1)NOTE: PLEASE SEE DRYER LOAD OF 5KE MIN
 MISSING FROM LOAD CALCULATIONS.
  
 PLEASE REVISE BEFORE ROUGH ALONG W/ ANY
 OTHER REV`S BEFORE ROUGH.
 IF THERE ARE QUESTIONS, PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-09-23 Cont ID  
Sent By csiegber Date 2003-09-23 Time 16:39 Rev Time 0.00
Received By csiegber Date 2003-09-23 Time 16:39 Sent To E
Notes
2003-09-23 00:00:00TO DP DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-06-20 Cont ID  
Sent By shernand Date 2003-06-20 Time 11:10 Rev Time 0.00
Received By shernand Date 2003-06-20 Time 11:10 Sent To B
Notes
2003-06-20 00:00:00JGOMEZ DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-05-07 Cont ID  
Sent By shernand Date 2003-05-07 Time 15:09 Rev Time 0.00
Received By shernand Date 2003-05-07 Time 15:09 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-05-29 Cont ID  
Sent By kstevens Date 2003-05-23 Time 17:49 Rev Time 0.50
Received By hmoser Date 2003-05-29 Time 17:07 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-05-23 Cont ID  
Sent By dpalmer Date 2003-05-19 Time 06:22 Rev Time 0.25
Received By kstevens Date 2003-05-23 Time 17:49 Sent To M
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-05-15 Cont ID  
Sent By shernand Date 2003-05-07 Time 15:09 Rev Time 1.00
Received By mmclean Date   Time   Sent To E
Notes
***NONE***