Plan Review Details - Permit 03050145
Plan Review Stops For Permit 03050145
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2004-07-28 Cont ID  
Sent By shill Date 2004-07-28 Time 09:51 Rev Time 1.00
Received By shill Date 2004-07-28 Time 09:51 Sent To  
Notes
2004-07-28 00:00:00REVISED A-T1.4 DATED 4/1/04
 ADDRESSING PROVISO

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2004-03-01 Cont ID  
Sent By csiegber Date 2004-06-23 Time 11:15 Rev Time 1.00
Received By shill Date 2004-03-01 Time 15:26 Sent To  
Notes
2004-03-01 00:00:00***PROVISO***
 1. PROVIDE ENGINEERING FOR JAMERCO
 FASTENERS.
 2. SEPARATE PERMIT REQUIRED FOR SHUTTERS
 WINDOWS & DOORS.
 SEE CBAA CASE #1239

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2004-02-28 Cont ID  
Sent By shill Date 2004-02-28 Time 09:54 Rev Time 4.00
Received By shill Date 2004-02-28 Time 09:54 Sent To P
Notes
2004-02-28 00:00:00****CORRECTIONS****
  
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 561-805-6724
  
 1.)PROVIDE A SURVEY FOR THIS PARCEL.
  
 2.)PROVIDE A DIMENSIONED SITE PLAN.
  
 3.)ZONING APPROVAL REQUIRED BEFORE
 PERMIT ISSUANCE.
  
 4.)THE WINDOW SIZES EXCEED THE MAXIMUM
 SIZE ALLOWED BY THE SBCCI TEST REPORTS,
 WHICH IS APPARENTLY WHY ENGINEERING FOR
 THE WINDOWS WAS SUBMITTED.HOWEVER, ANY
 ENGINEERING SUBMITTED IN LIEU OF TEST
 REPORTS MUST BE ORIGINAL AND SEALED IN
 ACCORDANCE WITH FS471.025, WITH
 THE INFORMATION REQUIRED TO BE ON EACH
 SHEET AS PER FAC61G-23.002.ALSO, THE
 SITE SPECIFIC PAPERWORK INDICATES A
 LIMITATION OF +30/-30 FOR DESIGN
 PRESSURE; SEE SHEET A-DT1 FOR DESIGN
 LOAD REQUIREMENTS.
  
 5.)THE PRODUCT APPROVALS SUBMITTED FOR
 THE IMPACT FRENCH DOORS ARE FOR SMALL
 MISSILE IMPACT ONLY.SHUTTERS WOULD
 BE REQUIRED BELOW 30'.IMPACT
 PROTECTION IS TO BE FOR LARGE MISSILE
 IMPACT, FBC1606.1.4(1).
  
 6.)SITE SPECIFIC PRODUCT APPROVALS ARE
 TO BE SEALED IN TWO PLACES; ENGINEER AND
 DESIGNER OF RECORD.
  
 7.)FOR THE NON-IMPACT FRENCH DOOR,
 CLEARLY INDICATE ON DRAWING W03-38 WHICH
 DESIGN YOU ARE USING AS NOT ALL MEET
 DESIGN LOAD REQUIREMENTS.
  
 8.)SHEET 3 PREPARED BY AL-FAROOQ
 CORPORATION FOR THE WINDOWS INDICATES
 THAT 1ST & 2ND FLOOR WILL HAVE NON-
 IMPACT WINDOWS.IMPACT REQUIRED ON THE
 2ND FLOOR AS PER YOUR APPROVED PLAN.
 ALSO APPLIES TO SHEETS 7, 11.
  
 9.)SHEET 4 IS FOR A SINGLE HUNG WINDOW
 BUT INDICATES THAT IT IS FOR MARK C,
 WHICH IS A FIXED WINDOW.NOTE THAT THIS
 WINDOW DOES NOT REQUIRE ENGINEERING AS
 IT IS COVERED UNDER THE SUBMITTED
 SBCCI TEST REPORT. (AL-FAROOQ)
  
 10.)SHEET 5 INDICATES THAT IMPACT IS
 FOR THE 3RD FLOOR, PLEASE NOTE THAT IT
 SHOULD BE FOR 2ND AND 3RD FLOOR (AL-
 FAROOQ).ALSO APPLIES TO SHEETS 9.
  
 11.)SHEET 12, MAX DESIGN PRESSURE IS
 -44.5 FOR THE HORIZONTAL ROLLER, NON-
 IMPACT.THIS DOES NOT MEET DESIGN
 PRESSURE REQUIREMENTS FOR ZONE 5.THE
 COVER SHEET INDICATES THAT ALL WINDOWS
 USE WORST CASE ZONE 5 (NOTE 4). ADDRESS.
  
 12.)SHEET 12 SHOWS A HORIZONTAL ROLLER
 WINDOW SIZE OF 72X54, THE CALCS ON
 SHEET 13 ARE FOR THIS SIZE, BUT THE PLAN
 SHOWS A SIZE OF 74X62.ALSO APPLIES TO
 SHEET 14 (IMPACT HORIZ.ROLLER). ADDRESS.
  
 13.)PRODUCT APPROVAL SUBMITTAL FORM
 FOR THE SINGLE HUNG WINDOW SHOWS A
 DESIGN PRESSURE OF +/- 950.IS THIS
 CORRECT?
  
 14.)ON THE SBCCI REPORT FOR THE
 SHUTTERS CLEARLY INDICATE THE PRODUCT
 TO BE INSTALLED AND CIRCLE ANCHORING
 TO BE USED.NOT ALL PRODUCTS MEET
 MINIMUM DESIGN CRITERIA.
  
 15.)PANELMATE ANCHORS ARE INDICATED ON
 THE SHUTTER INSTALLATION SCHEDULE AND
 21-ADT5.THIS ANCHOR IS FOR CONCRETE/
 HOLLOW BLOCK INSTALLATIONS, SEE TEST
 REPORT.
  
 16.)PRODUCT APPROVALS FOR THE LOUVERED
 DOORS WERE NOT SUBMITTED.
  
 17.)JAMERCO DATA (MISC HARDWARE
 SECTION OF THE PRODUCT APPROVAL BOOK)
 IS ILLEGIBLE.THE PLAN NOTES JAMERCO
 .143"X 1 1/2" PINS, BUT THE SEMCO
 CONNECTORS WERE TESTED WITH .145"
 POWER FASTENERS.SUBMIT LEGIBLE
 PAPERWORK AND HAVE THE ENGINEER
 ADDRESS.
  
 18.)SUBMIT REVISED PRODUCT APPROVAL
 PAPERWORK FOR THE OTHER BUILDINGS IF
 NECESSARY.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2004-01-02 Cont ID  
Sent By shill Date 2003-12-31 Time 08:22 Rev Time 4.00
Received By shill Date 2003-12-30 Time 14:38 Sent To  
Notes
2003-12-31 00:00:00****CORRECTIONS*****
  
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 [email protected]
  
 1.)A NOTICE OF COMMENCEMENT MUST BE
 FILED WITH THE CLERK OF COURTS BEFORE A
 PERMIT CAN BE ISSUED.
  
 2.)IMPACT FEES MUST BE PAID TO PALM
 BEACH COUNTY.THE PLANS MUST BE
 STAMPED AND THE RECEIPT ATTACHED TO THE
 APPLICATION.
  
 3.)NOTE THAT THIS PROJECT HAS FAILED
 ZONING.A PERMIT CANNOT BE ISSUED
 WITHOUT ZONING APPROVAL.
  
 4.)PROVIDE A SOILS INVESTIGATION
 REPORT.
  
 5.)SUBMIT PRODUCT APPROVALS FOR:
 INSWING DOOR
 3068 OUTSWING DOOR
 FRENCH DOOR
 6050 SLIDER, IMPACT AND NONIMPACT
 ROOF TILE
 HORIZONTAL ROLLER, IMPACT AND NONIMPAC
 SINGLE HUNG, IMPACT AND NONIMPACT
 SHUTTERS
 DOUBLE 3668 LOUVERED DOORS
 MODIFIED BITUMEN ROOF
 ANY OTHER PRODUCTS WHICH REQUIRE
 PRODUCT APPROVAL BUT ARE NOT LISTED.
  
 6.)PROVIDE A FIREBLOCK DETAIL FOR THE
 SOFFIT FBC705.3.
  
 7.)PROVIDE THE INSTALLATION PLAN FOR
 HURRICANE PROTECTION AS DISCUSSED.SEE
 A-DT1, SHUTTER NOTE, "THE OWNER WILL
 SUBMIT A 'PLAN OF ACTION' FOR THE
 INSTALLATION OF THE GROUND FLOOR
 SHUTTERS . . ."SUBMIT THIS PLAN FOR
 ALL OF THE BUILDINGS.
 PROVIDE AN INSTALLATION SCHEDULE, SEE
 ATTACHED.
  
 8.)THERE ARE SEVERAL DETAILS ON THE
 PLAN WHICH REFER TO SEMCO CONNECTORS.
 SEMCO HAS BEEN OUT OF BUSINESS FOR OVER
 TWO YEARS.REVISE ALL AFFECTED DETAILS,
 FOR INSTANCE, AT1.4 TYPE "A" ROOF TIE
 DOWN DETAIL, HURRICANE STRAP/CONN NOTE
 3, A-ADT3, B-ADT3.CHECK ALL DETAILS.
  
 9.)STUCCO OVER WIRE LATH IN A VERTICAL
 APPLICATION IS REQUIRED TO BE 3 COAT
 7/8" MIN, FBC2504.2.2, ASTM C926 (SEE
 ATTACHED).THE THICKNESS 5/8" APPEARS
 IN SEVERAL DETAILS, SUCH AS A-DT3. CHECK
 ALL DETAILS.
  
 10.)THE ENTRY DOORS IN THE BREEZEWAY
 ARE TO BE 90 MINUTE TO COMPLY WITH THE
 2 HR WALL REQUIREMENT, FBC TABLE
 705.1.2.REVISE ALL AFFECTED DETAILS
 AND DOOR SCHEDULE.
  
 11.)PROVIDE FIRE RATING INFORMATION
 FOR THE DOORS.
  
 12.) SPECIAL INSPECTOR REQUIRED, FS
 553.71(7).PROVIDE THE INSPECTION PLAN.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2004-02-26 Cont ID  
Sent By dpalmer Date 2004-02-26 Time 06:26 Rev Time 1.00
Received By dpalmer Date 2004-02-25 Time 16:47 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2003-12-17 Cont ID  
Sent By dpalmer Date 2003-12-17 Time 07:08 Rev Time 0.50
Received By dpalmer Date 2003-12-17 Time 07:07 Sent To  
Notes
2003-12-17 00:00:00************* UNSAT **************
  
 1)NOTE: PLEASE SEE WIND LOAD FOR LIGHT
 POLES, SHOWN AT 120 MPH. PLEASE SEE
 FBC. 140 MPH
  
 2)NOTE: PLEASE HAVE PLANS "SIGNED" WITH
 COMPLETE SIGNATURE FOR ENGINEER OF
 RECORD. FS 471.025, FAC 61G15-23.002
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2003-12-03 Cont ID  
Sent By mamini Date 2003-12-03 Time 14:24 Rev Time 1.00
Received By mamini Date 2003-12-03 Time 15:09 Sent To  
Notes
2003-12-03 00:00:00PASSED:
 1. SEE PERMIT # 03101018 FOR UNDERGROUND
 UTILITIES AND SITE WORKS.
  
 IF ANY QUESTION PLEASE CONTACT 805-6723
 MOHAMMAD R. AMINI

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2004-02-13 Cont ID  
Sent By mcarsill Date 2004-02-13 Time 14:13 Rev Time 0.00
Received By mcarsill Date 2004-02-13 Time 14:13 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2003-12-12 Cont ID  
Sent By mcarsill Date 2003-12-12 Time 07:45 Rev Time 0.00
Received By mcarsill Date 2003-12-12 Time 07:45 Sent To  
Notes
2003-12-12 00:00:00APPROVED PROVISO:
  
 1) FIRE SPRINKLER HEADS SHALL NOT BE
 DELETED FROM ELECTRIC AND CABLE ROOMS.
  
 2) THE FIRE DEPARTMENT CONNECTIONS SHALL
 BE 2 1/2 INCH NOT 1 1/2 INCH AS SHOWN
 IN FDC DETAIL ON PAGE FP-2.
  
 3) POST INDICATOR VALVES ARE REQUIRED.
  
 4) PLEASE EXPLAIN THE TWO HOUR BREEZEWAY
 WALLS WITH C LABELED FIRE DOORS. PLEASE
 EXPLAIN RATIONALE.
  
 5) THE DATE OF THE FLOW TEST IS OVER
 ONE YEAR OLD.
  
 MIKE CARSILLO, ASSISTANT FIRE MARSHAL
 835-2910

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2004-06-23 Cont ID  
Sent By csiegber Date 2004-06-23 Time 11:15 Rev Time 0.00
Received By csiegber Date 2004-06-23 Time 11:15 Sent To B
Notes
2004-06-23 00:00:00TO SH DESK/REV

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2004-02-25 Cont ID  
Sent By pkrauss Date 2004-02-25 Time 07:36 Rev Time 0.55
Received By pkrauss Date 2004-02-25 Time 07:27 Sent To  
Notes
2004-02-25 00:00:00PROVISO:
 THE FOLLOWING ITEMS HAVE CHANGED WITH
 THE REVISED 2001 FBC(M), EFFECTIVE JUNE
 30, 2003:
  
 1.PER 2001 FBC(M) 403.3, VENTILATION
 SYSTEMS OTHER THAN R-3 (ONE/TWO FAMILY),
 SHALL HAVE THE MINIMUM REQUIREMENTS OF
 OUTSIDE AIR IN ACCORDANCE WITH TABLE
 403.3. PLEASE REVISE PLANS TO REFLECT
 THIS REQUIREMENT.
  
 2.AUXILIARY DRAIN PAN WITH OVERFLOW
 PROTECTION REQUIRED PER 2001 FBC(M)
 307.2.3.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT (561) 805-6719.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-12-17 Cont ID  
Sent By pkrauss Date 2003-12-17 Time 15:32 Rev Time 1.40
Received By pkrauss Date 2003-12-17 Time 15:05 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2004-02-20 Cont ID  
Sent By shill Date 2004-02-28 Time 12:57 Rev Time 1.25
Received By kstevens Date 2004-02-20 Time 18:05 Sent To  
Notes
2004-02-20 00:00:00PASSED/PROVISO
  
 EXPANSION TANK FOR THERMAL EXPANSION
 CONTROL IS UNDERSIZED. SEE ATTACHED
 SHEET FOR CALCULATIONS. REVISION REQUIR-
 ED.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]

Review Stop P PLUMBING
Rev No 1 Status F Date 2003-12-16 Cont ID  
Sent By kstevens Date 2003-12-16 Time 15:18 Rev Time 1.50
Received By kstevens Date 2003-12-16 Time 15:18 Sent To  
Notes
2003-12-16 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FLA. ADMIN. CODE
 FLA. STATUTES
  
 1) SHTS P-U1 THRU P-U4 WATER RISER DIA-
 GRAMS, A WATER HAMMER ARRESTOR IS REQ-
 UIRD FOR THE ICE MAKER LINE TO THE REF-
 RIDGERATOR. (NOT IN CEILING - PDI-WH 201
 AND MANUF. INSTALL. INSTRUCT. 604.9).
 2) SHT P-T1.3 THERMAL EXPANSION CONTROL
 NOT PROPERLY ADDRESSED WITH THE 3/4"
 VALVE AT THE BACKFLOW. 607.3.2
 3) ENGINEERS SHALL SUBMIT SIGNATURE ON
 SEAL. FAC 61G15-23.002(1) & FS 471.025.
 INITALS ARE NOT ACCEPTABLE PER FBPE AND
 BLDG OFFICIAL.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]

Review Stop Z ZONING
Rev No 3 Status P Date 2004-03-01 Cont ID  
Sent By shill Date 2004-03-01 Time 15:28 Rev Time 0.50
Received By shill Date 2004-03-01 Time 15:28 Sent To  
Notes
2004-03-01 00:00:00PER E.SCHNEIDER

Review Stop Z ZONING
Rev No 2 Status F Date 2004-02-27 Cont ID  
Sent By shill Date 2004-02-27 Time 14:40 Rev Time 0.50
Received By shill Date 2004-02-27 Time 14:40 Sent To  
Notes
2004-02-27 00:00:00PER E.SCHNEIDER
  
 NEEDS TO SHOW BUILDING SETBACKS.
 1

Review Stop Z ZONING
Rev No 1 Status F Date 2003-12-11 Cont ID  
Sent By mmclean Date 2003-12-11 Time 09:08 Rev Time 0.00
Received By mmclean Date 2003-12-11 Time 09:08 Sent To I
Notes
2003-12-11 00:00:00DENIED, NEED UNITY OF TITLE PER ERIC
 SCHNEIDER SENIOR PLANNER EXT 8463 MM