| Plan Review Stops For Permit 03050122 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2003-08-13 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2003-08-14 |
Time |
07:38 |
Rev Time |
1.50 |
| Received By |
sthyng |
Date |
2003-08-13 |
Time |
13:49 |
Sent To |
|
|
| Notes |
| 2003-08-13 00:00:00 | PINK SLIP ON FRONT OF PKG, NEEDS CITY | | | COPY OF ENERGY CALC SIGNED ON OWNER/ | | | AGENT LINE | | | | | | SENT TO DP DESK |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2003-07-18 |
|
|
Cont ID |
|
| Sent By |
alange |
Date |
2003-08-13 |
Time |
08:52 |
Rev Time |
1.50 |
| Received By |
sthyng |
Date |
2003-07-12 |
Time |
17:21 |
Sent To |
M |
|
| Notes |
| 2003-07-12 00:00:00 | *****CORRECTIONS****** | | | | | | 1.)MECHANICAL WORK WAS ADDED TO THE | | | PLAN IN INK.ALL CHANGES TO A SEALED | | | DRAWING MUST BE INITALED AND DATED BY | | | THE ENGINEER. | | | | | | 2.)SIGN THE OWNER/AGENT LINE OF THE | | | ENERGY CALC. | | | | | | 3.)FIRESTOP REQUIRED, FBC 705.3. | | | | | | 4.)INSULATION WAS PUT ON THE PLAN | | | WITH WHITE OUT.ALL CHANGES TO THE | | | PLAN MUST BE INITIALED AND DATED BY | | | THE ENGINEER. | | | | | | 5.)THE CONNECTION SPECIFIED FROM THE | | | TIE BEAM TO THE WOOD BEAM SPECIFIES | | | 16-10DX1.ACCORDING TO THE SIMPSON | | | 2003 CATALOG, THE NAIL LENGTH IS | | | REQUIRED TO BE 1 1/2. | | | | | | 6.)SEE THE PREVIOUS CORRECTION LIST, | | | #7.GIVE EXISTING ATTACHMENTS WITH | | | UPLIFT INFORMATION. | | | | | | 7.)THE INTERNAL PRESSURE COEFFICIENT | | | IN THE WIND INFORMATION SECTION OF THE | | | PLAN IS INCORRECT.A COEFFICIENT IS | | | A NUMBER. | | | | | | 8.)THE ROOF TRUSS LOAD (WIND | | | INFORMATION) STATES "PER TRUSS | | | ENGINEERING".THERE AREN'T ANY | | | TRUSSES IN THIS DESIGN. | | | | | | SAMANTHA THYNG, BUILDING PLANS EXAMINER | | | [email protected] |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2003-05-31 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-07-11 |
Time |
15:11 |
Rev Time |
0.25 |
| Received By |
sthyng |
Date |
2003-05-31 |
Time |
19:39 |
Sent To |
|
|
| Notes |
| 2003-05-31 00:00:00 | *****CORRECTIONS***** | | | | | | SAMANTHA THYNG, BUILDING PLANS EXAMINER | | | [email protected] | | | | | | SEE THE PREVIOUS CORRECTION NOTICE. | | | IMPACT FEES WERE PAID, A NOC IS IN THE | | | PACKAGE, BUT THE STRUCTURAL COMMENTS | | | WERE NOT ADDRESSED. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2003-05-23 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-05-30 |
Time |
14:21 |
Rev Time |
1.50 |
| Received By |
sthyng |
Date |
2003-05-23 |
Time |
19:29 |
Sent To |
|
|
| Notes |
| 2003-05-23 00:00:00 | ******CORRECTIONS****** | | | | | | SAMANTHA THYNG, BUILDING PLANS EXAMINER | | | [email protected] | | | | | | 1.)A NOTICE OF COMMENCEMENT MUST BE | | | FILED WITH THE CLERK OF COURTS BEFORE A | | | PERMIT CAN BE ISSUED. | | | | | | 2.)IMPACT FEES MUST BE PAID TO PALM | | | BEACH COUNTY.THE PLANS MUST BE | | | STAMPED AND THE ORIGINAL RECEIPT | | | ATTACHED TO THE APPLICATION.233-5025 | | | | | | 3.)SEPARATE PERMITS REQUIRED. | | | | | | 4.)ADDITIONAL FEES REQUIRED. | | | | | | 5.)ENERGY CALCS REQUIRED FBC 13-101.2. | | | | | | 6.)SPECIFY INSULATION. | | | | | | 7.)HOW WILL THE WALL SECTION BE | | | STRUCTURALLY CONTINUOUS?NO ATTACHMENTS | | | ARE SHOWN.GIVE EXISTING ATTACHMENTS | | | WITH UPLIFT INFORMATION, AND PROPOSED | | | ATTACHMENTS.IS THE WOOD BEAM PRESSURE | | | TREATED?HOW WILL THE TIE BEAM UNDER | | | THE WOOD BEAM, WITH NO WEIGHT BEARING | | | ON THE TIE BEAM, BE STRUCTURALLY | | | CONTINUOUS? | | | | | | 8.)SEMCO ATTACHMENTS ARE NOT | | | AVAILABLE.SPECIFY ANOTHER BRAND WITH | | | UPLIFT.ALL ATTACHMENTS SHOWN SHOULD | | | SHOW UPLIFT. | | | | | | 9.)SHOW THE 12" BELOW GRADE, 4" ABOVE | | | GRADE FOR THE FOUNDATION REQUIRED BY | | | CODE ON THE WALL SECTION, FBC1804.1.3. | | | | | | 10.) GIVE A SOFFIT VENT SCHEDULE. | | | CANNOT "MATCH EXISTING" AS THE EXISTING | | | MIGHT NOT COMPLY WITH FBC 2309.7. | | | | | | 11.) SUBMIT PRODUCT APPROVALS FOR | | | THE SINGLE HUNG WINDOWS, IMPACT | | | PROTECTION, AND THE DOOR (2 LEGIBLE | | | COPIES EACH). |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2003-08-14 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-08-14 |
Time |
05:59 |
Rev Time |
0.25 |
| Received By |
dpalmer |
Date |
2003-08-14 |
Time |
05:59 |
Sent To |
M |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2003-05-06 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-05-06 |
Time |
18:57 |
Rev Time |
0.25 |
| Received By |
dpalmer |
Date |
2003-05-06 |
Time |
18:57 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2003-08-13 |
|
|
Cont ID |
|
| Sent By |
alange |
Date |
2003-08-13 |
Time |
08:52 |
Rev Time |
0.00 |
| Received By |
alange |
Date |
2003-08-13 |
Time |
08:52 |
Sent To |
B |
|
| Notes |
| 2003-08-13 00:00:00 | TO STHYNG DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2003-08-11 |
|
|
Cont ID |
|
| Sent By |
dbaxter |
Date |
2003-08-11 |
Time |
16:25 |
Rev Time |
0.00 |
| Received By |
dbaxter |
Date |
2003-08-11 |
Time |
16:25 |
Sent To |
B |
|
| Notes |
| 2003-08-11 00:00:00 | TO STHYNG DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2003-07-11 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-07-11 |
Time |
15:11 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-07-11 |
Time |
15:11 |
Sent To |
B |
|
| Notes |
| 2003-07-11 00:00:00 | STHYNG DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2003-05-30 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-05-30 |
Time |
14:21 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-05-30 |
Time |
14:21 |
Sent To |
B |
|
| Notes |
| 2003-05-30 00:00:00 | STHYNG DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2003-05-05 |
|
|
Cont ID |
|
| Sent By |
sgraham |
Date |
2003-05-06 |
Time |
10:30 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-05-05 |
Time |
11:46 |
Sent To |
Z |
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2003-08-14 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2003-08-14 |
Time |
07:38 |
Rev Time |
0.15 |
| Received By |
pkrauss |
Date |
2003-08-14 |
Time |
07:38 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2003-07-17 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-08-14 |
Time |
05:59 |
Rev Time |
0.20 |
| Received By |
pkrauss |
Date |
2003-07-17 |
Time |
11:12 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2003-05-06 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-05-05 |
Time |
11:46 |
Rev Time |
0.00 |
| Received By |
sgraham |
Date |
|
Time |
|
Sent To |
I |
|
| Notes |
|
|