| Plan Review Stops For Permit 03042753 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2003-10-14 |
|
|
Cont ID |
|
| Sent By |
sthyng |
Date |
2003-10-14 |
Time |
15:12 |
Rev Time |
0.50 |
| Received By |
sthyng |
Date |
2003-10-14 |
Time |
15:12 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2003-10-10 |
|
|
Cont ID |
|
| Sent By |
sthyng |
Date |
2003-10-10 |
Time |
10:07 |
Rev Time |
2.00 |
| Received By |
sthyng |
Date |
2003-10-10 |
Time |
10:07 |
Sent To |
|
|
| Notes |
| 2003-10-10 00:00:00 | *****CORRECTIONS***** | | | | | | SAMANTHA THYNG, BUILDING PLANS EXAMINER | | | [email protected] | | | | | | 1.)SEE PREVIOUS LIST, PROVIDE A SOILS | | | INVESTIGATION REPORT. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2003-07-23 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-10-08 |
Time |
12:28 |
Rev Time |
1.50 |
| Received By |
sthyng |
Date |
2003-07-23 |
Time |
15:42 |
Sent To |
|
|
| Notes |
| 2003-07-23 00:00:00 | ******CORRECTIONS****** | | | | | | 1.)ADDITIONAL PERMITS REQUIRED. | | | | | | 2.)SEE PREVIOUS LIST, #2, SHOW THE | | | CLEAR NET OPENING HEIGHT (FROM THE | | | MANUFACTURER) OF THE SINGLE HUNG 60" | | | HIGH EGRESS WINDOWS TO SHOW COMPLIANCE | | | WITH FBC1005.4. | | | | | | 3.)SEE PREVIOUS LIST #10, PROVIDE A | | | HURRICANE SHUTTER ANCHORING SCHEDULE. | | | | | | 4.)PAGE 3 OF THE ROOF PRODUCT APPROVAL | | | IS MISSING. | | | | | | 2.)THE PRODUCT APPROVAL FOR THE | | | OPAQUE DOOR IS MISSING SHEETS REFERRED | | | TO IN ITEM 2.1. | | | | | | 3.)THE SINGLE HUNG WINDOW PRODUCT | | | APPROVAL IS EXPIRED. | | | | | | 4.)PROVIDE A PRODUCT APPROVAL FOR | | | DOOR #5. | | | | | | 5.)PROVIDE A SOILS INVESTIGATION | | | REPORT. | | | | | | 6.)SEE PREVIOUS LIST REGARDING IMPACT | | | FEES, ITEM #14. | | | | | | SAMANTHA THYNG, BUILDING PLANS EXAMINER | | | 561-805-6724 [email protected] |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2003-06-17 |
|
|
Cont ID |
|
| Sent By |
alange |
Date |
2003-07-22 |
Time |
15:05 |
Rev Time |
3.00 |
| Received By |
sthyng |
Date |
2003-06-16 |
Time |
14:55 |
Sent To |
|
|
| Notes |
| 2003-06-17 00:00:00 | ******CORRECTIONS******** | | | | | | SAMANTHA THYNG, BUILDING PLANS EXAMINER | | | [email protected] | | | | | | 1.)SEPARATE PERMITS REQUIRED. | | | | | | 2.)SHOW THE CLEAR NET OPENING HEIGHT | | | (FROM THE MANUFACTURER) OF THE SINGLE | | | HUNG 60" HIGH EGRESS WINDOWS TO SHOW | | | COMPLIANCE WITH FBC1005.4. | | | | | | 3.)ADDITIONAL FEES DUE, $376.61 (SEE | | | ATTACHED FOR VALUATION ADJUSTMENT). | | | | | | 4.)INSULATION ON THE WALLS ARE TO BE | | | A MINIMUM OF 4.2 PER ENERGY CALCS; | | | REVISE WALL SECTION. | | | | | | 5.)UPLIFT FOR TRUSS ANCHORS | | | SPECIFIED EXCEEDS UPLIFT ALLOWED IN THE | | | 2003 CATALOG.REVISE. | | | | | | 6.)FOOTER IS REQUIRED TO BE A MINIMUM | | | OF 12" BELOW GRADE PER FBC 1804.1.3. | | | | | | 7.)SPECIFY THE SPACING OF SOFFIT | | | SCREEN VENTS, COMPLY WITH FBC 2309.7. | | | | | | 8.)INSULATION BETWEEN CONDITIONED AND | | | UNCONDITIONED SPACE IS REQUIRED PER | | | ENERGY CALC (ADJACENT WALL). | | | | | | 9.)PROVIDE A WINDOW AND DOOR BUCK | | | ATTACHMENT DETAIL; COMPLY WITH FBC | | | 1707.4.4.2. | | | | | | 10.) PROVIDE A HURRICANE SHUTTER | | | ANCHORING SCHEDULE, SEE ATTACHED. | | | | | | 11.) SPECIFY DESIGN PRESSURE FOR DOOR | | | #5. | | | | | | 12.)PROVIDE TWO COPIES OF THE GARAGE | | | DOOR PRODUCT APPROVAL. | | | | | | 13.)PROVIDE DESIGN INFORMATION ON THE | | | PLAN, FBC 1606.1.7. | | | | | | 14.)IMPACT FEES MUST BE PAID TO PALM | | | BEACH COUNTY.THE PLANS MUST BE | | | STAMPED AND THE ORIGINAL RECEIPT | | | ATTACHED TO THE PERMIT APPLICATION. | | | 233-5025 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2003-06-05 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-06-04 |
Time |
16:32 |
Rev Time |
0.50 |
| Received By |
btrobaug |
Date |
2003-06-04 |
Time |
16:44 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
6 |
Status |
N |
Date |
2003-10-08 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-10-08 |
Time |
12:28 |
Rev Time |
0.00 |
| Received By |
csiegber |
Date |
2003-10-08 |
Time |
12:28 |
Sent To |
B |
|
| Notes |
| 2003-10-08 00:00:00 | TO ST DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2003-07-23 |
|
|
Cont ID |
|
| Sent By |
alange |
Date |
2003-07-23 |
Time |
15:51 |
Rev Time |
0.00 |
| Received By |
alange |
Date |
2003-07-22 |
Time |
15:05 |
Sent To |
B |
|
| Notes |
| 2003-07-22 00:00:00 | 7/22/03 TO STHYNG ALANGE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2003-06-05 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-06-05 |
Time |
10:52 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-06-05 |
Time |
10:52 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2003-06-04 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2003-06-05 |
Time |
10:51 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-06-04 |
Time |
16:32 |
Sent To |
E |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2003-05-08 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-05-08 |
Time |
11:46 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-05-08 |
Time |
11:46 |
Sent To |
Z |
|
| Notes |
| 2003-05-08 00:00:00 | SUBMITTAL |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2003-04-30 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-04-30 |
Time |
09:39 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-04-30 |
Time |
09:39 |
Sent To |
Z |
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2003-06-16 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2003-06-07 |
Time |
16:34 |
Rev Time |
0.20 |
| Received By |
pkrauss |
Date |
2003-06-16 |
Time |
14:34 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2003-06-07 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-06-05 |
Time |
10:52 |
Rev Time |
0.25 |
| Received By |
kstevens |
Date |
2003-06-07 |
Time |
16:34 |
Sent To |
M |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2003-06-03 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-05-08 |
Time |
11:46 |
Rev Time |
0.00 |
| Received By |
mmclean |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2003-04-30 00:00:00 | DENIED, PUT SITE PLAN ON SURVEY TO | | | SCALE |
|
|