| Plan Review Stops For Permit 03042078 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
6 |
Status |
F |
Date |
2003-07-01 |
|
|
Cont ID |
|
| Sent By |
sthyng |
Date |
2003-07-01 |
Time |
10:44 |
Rev Time |
1.50 |
| Received By |
sthyng |
Date |
2003-07-01 |
Time |
10:44 |
Sent To |
|
|
| Notes |
| 2003-07-01 00:00:00 | ********CORRECTIONS******** | | | | | | SAMANTHA THYNG, BUILDING PLANS EXAMINER | | | [email protected] | | | | | | 1.)SEE THE PREVIOUS CORRECTIONS | | | REGARDING THE ATTACHMENT OF THE NEW SLAB | | | TO THE EXISTING.THE EMBEDMENT LENGTH | | | IS STILL NOT ON THE PLAN.AGAIN, I | | | HAVE CIRCLED THE DETAIL SO THAT YOU | | | CORRECT THE RIGHT ONE. | | | | | | 2.)SEE THE CORRECTION NOTE #5 DATED | | | 6/12/3.I HAD A CONVERSATION WITH THE | | | DESIGNER EXPLAINING THIS CORRECTION.HE | | | INDICATED THAT HE UNDERSTOOD THE | | | CORRECTION.IT IS NOT CHANGED ON THE | | | PLAN.THE R VALUE SPECIFIED ON THE | | | PLAN IN NOT CONSISTENT WITH THE | | | MINIMUMS SPECIFIED ON THE ENERGY CALC. | | | I HAVE CIRCLED THE INCORRECT RVALUE ON | | | THE PLAN. | | | | | | 3.)THE PRODUCT APPROVALS FOR THE | | | HURRICANE SHUTTERS ARE ILLEGIBLE. | | | | | | 4.)PROVIDE A HURRICANE SHUTTER | | | ANCHORING SCHEDULE, SEE ATTACHED. | | | | | | 5.)SHOW THE DIMENSIONS ABOVE & BELOW | | | GRADE FOR THE FOOTER, CBS WALL SECTION. | | | | | | 6.)THE WINDOW PRODUCT APPROVALS ARE | | | INCOMPLETE.SUBMIT TWO COMPLETE COPIES. | | | | | | 7.)ADDITIONS OVER 25% MUST COMPLY | | | WITH FBC3401.7.1.2.SHOW, FOR THE | | | EXISTING HOUSE, THE FOLLOWING: | | | EMERGENCY EGRESS FOR BEDROOMS,FBC1005.4 | | | SMOKE DETECTORS FOR BEDROOMS,FBC905.2.2 | | | BATHROOM TO COMPLY WITH FBC11-11(1) | | | FRONT DOOR TO COMPLY WITH 1004 | | | | | | 8.)SIGN THE OWNER/AGENT LINE OF THE | | | ENERGY CALC. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
5 |
Status |
|
Date |
2003-07-01 |
|
|
Cont ID |
|
| Sent By |
sthyng |
Date |
2003-07-01 |
Time |
09:57 |
Rev Time |
1.00 |
| Received By |
sthyng |
Date |
2003-07-01 |
Time |
09:57 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
F |
Date |
2003-06-23 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-07-01 |
Time |
09:36 |
Rev Time |
0.50 |
| Received By |
sthyng |
Date |
2003-06-23 |
Time |
12:51 |
Sent To |
|
|
| Notes |
| 2003-06-23 00:00:00 | ******CORRECTIONS******* | | | | | | SAMANTHA THYNG, BUILDING PLANS EXAMINER | | | [email protected] | | | | | | 1.)ONLY ENERGY CALCS WERE SUBMITTED. | | | THE PLANS MUST BE SUBMITTED WITH THE | | | ENERGY CALCS, WITH ALL CORRECTIONS | | | FROM THE PREVIOUS CORRECTION LIST | | | MADE TO THE PLAN. | | | | | | 2.)ALL PREVIOUS CORRECTIONS MUST | | | BE MADE TO THE PLAN, OR A 4X FEE WILL | | | BE ASSESSED.SEE ATTACHED. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2003-06-12 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-06-20 |
Time |
15:13 |
Rev Time |
1.00 |
| Received By |
sthyng |
Date |
2003-06-12 |
Time |
19:17 |
Sent To |
|
|
| Notes |
| 2003-06-12 00:00:00 | *******CORRECTIONS******** | | | | | | SAMANTHA THYNG, BUILDING PLANS EXAMINER | | | [email protected] | | | | | | 1.)SEE #2 ON FIRST CORRECTION LIST, | | | #1 ON 2ND CORRECTION LIST.THIS IS | | | THE THIRD REQUEST FOR ENERGY CALCS.A | | | PERMIT CANNOT BE ISSUED UNTIL ENERGY | | | CALCS ARE SUBMITTED. | | | | | | 2.)SEPARATE PERMITS REQUIRED. | | | | | | 3.)SEE PREVIOUS CORRECTION #3, | | | FOR THE ATTACHMENTS OF THE NEW SLAB TO | | | THE EXISTING, SHOW THE LENGTH OF THE | | | DOWELS AND THE EMBEDMENT.THIS IS | | | FOUND ON THE WALL SECTION; I HAVE | | | CIRCLED IT SO THAT YOU CHANGE THE | | | CORRECT DETAIL. | | | | | | 4.)SEE PREVIOUS CORRECTION #5; STILL | | | SHOWS BOTH A 6" AND 8" EMBEDMENT.I | | | HAVE MARKED THIS AS WELL. | | | | | | 5.)YOU HAVE SPECIFIED 4.2 FOIL | | | INSULATION ON THE WALL.THIS MUST BE | | | CONSISTENT WITH THE ENERGY CALCS.IF | | | THEY SUBMIT A SHORT FOR ENERGY CALC, | | | THE MINIMUM R VALUE FOR A BLOCK WALL | | | IS R5.DO NOT RESUBMIT UNTIL YOU HAVE | | | SEEN THE ENERGY CALC AND HAVE CONFIRMED | | | THAT THE R VALUES STATED ON THE ENERGY | | | CALC ARE CONSISTENT WITH OR LESS THAN | | | SPECIFIED BY YOUR PLAN. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2003-06-04 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-06-12 |
Time |
16:03 |
Rev Time |
2.00 |
| Received By |
sthyng |
Date |
2003-06-04 |
Time |
11:13 |
Sent To |
|
|
| Notes |
| 2003-06-04 00:00:00 | ******CORRECTIONS******* | | | | | | SAMANTHA THYNG, BUILDING PLANS EXAMINER | | | [email protected] | | | | | | 1.)SEE #2 ON PREVIOUS CORRECTION | | | LIST; ENERGY CALCS REQUIRED. | | | | | | 2.)SEPARATE PERMITS REQUIRED. | | | | | | 3.)FOR THE ATTACHMENTS OF THE NEW | | | SLAB TO THE EXISTING, SHOW THE LENGTH | | | OF THE DOWELS AND EMBEDMENT. | | | | | | 4.)THE CEILING INSULATION IS TO BE | | | R19 MINIMUM (FBC 13-404.1.C).IT WAS | | | CORRECT ON THE ORIGINAL PLAN, THEN WAS | | | CHANGED TO R11.CORRECTION #5 | | | REFERRED TO THE WALL INSULATION. | | | SPECIFY THE INSULATION R-VALUE FOR THE | | | WALLS. | | | | | | 5.)THE NOTE ABOVE THE BEAM PLAN ON THE | | | ROOF PLAN SHOWS 6" AND 8" EMBEDMENT. | | | CLARIFY.ALSO SAYS "INTO EX. CONC FTG". | | | ISN'T THIS FOR THE BEAM, NOT THE | | | FOOTING?IT IS ON THE ROOF PLAN. | | | | | | 6.)SEE PREVIOUS CORR. NOTE #7.THE | | | SHEATHING SCHEDULE STILL DOES NOT | | | COMPLY. | | | | | | 7.)THE ATTACHMENT OF THE NEW FOOTING | | | TO EXISTING SHOWS BOTH 6" AND 8" | | | EMBEDMENT.CLARIFY. | | | | | | 8.)TWO COPIES OF ALL PRODUCT APPROVALS | | | MUST BE SUBMITTED. | | | | | | 9.)THE ROOF PRODUCT APPROVAL IS TO | | | RE-COVER AN EXISTING DECK WITH AN | | | EXISTING ROOF.YOU MAY SUBMIT THE | | | CORRECT PRODUCT APPROVAL NOW OR SUBMIT | | | IT WITH THE ROOF PERMIT APPLICATION. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2003-05-20 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-06-03 |
Time |
13:10 |
Rev Time |
2.50 |
| Received By |
sthyng |
Date |
2003-05-20 |
Time |
10:50 |
Sent To |
|
|
| Notes |
| 2003-05-20 00:00:00 | *******CORRECTIONS******* | | | | | | SAMANTHA THYNG, BUILDING PLANS EXAMINER | | | [email protected] | | | | | | 1.)IMPACT FEES ARE TO BE PAID TO PALM | | | BEACH COUNTY.THE PLANS MUST BE STAMPED | | | AND THE RECEIPT ATTACHED TO THE | | | APPLICATION.233-5025. | | | | | | 2.)ENERGY CALCS REQUIRED FBC13-101.2. | | | | | | 3.)SEPARATE PERMITS REQUIRED (ELECTRIC | | | ROOF, MECHANICAL). | | | | | | 4.)IS THE 18 X 16 FOOTER ON THE PLAN | | | PROPOSED OR EXISTING?IF IT IS A NEW | | | FOOTER, HOW WILL IT TIE INTO THE | | | EXISTING SLAB? | | | | | | 5.)SPECIFY INSULATION ON THE PLAN (NOT | | | "SEE ENERGY CALC"; ENERGY CALCS NOT | | | SUBMITTED). | | | | | | 6.)SOFFIT VENTS MUST COMPLY WITH FBC | | | 2309.7; CANNOT "MATCH EXISTING". SPECIFY | | | SIZE AND SPACING. | | | | | | 7.)ROOF SHEATHING ATTACHMENT DOES NOT | | | COMPLY WITH CITY OF WEST PALM BEACH | | | AMENDMENTS TO THE FBC, REVISED TABLE | | | 2306.1 FOR ZONE 3. | | | | | | 8.)SECTION A A-1 IS LABELED "MAIN | | | FLOOR STAIR".REVISE. | | | | | | 9.)PROVIDE WINDOW & DOOR BUCK | | | ATTACHMENT DETAILS; REFER TO FBC | | | 1707.4.4.2. | | | | | | 10.) THE ROOF FRAMING PLAN SPECIFIES | | | 2X8S, THE WALL SECTION SPECIFIES 2X10S. | | | | | | 11.) TYPICAL INTERIOR PARTITION DETAIL | | | REFERS TO AN ANCHOR SCHEDULE NOT ON THE | | | PLAN.ALSO IT IS UNCLEAR AS TO WHERE | | | THIS PARTITION IS TO BE INSTALLED. | | | | | | 12.)THE BEAM TO ROOF JOIST CONNECTION | | | IS INCORRECT.SPECIFY THE CORRECT | | | ATTACHMENT WITH CORRECT LANGUAGE AS TO | | | HOW IT WILL BE ATTACHED (SIZE AND | | | NUMBER).REFER TO THE 2003 CATALOG. | | | | | | 13.)WALL SECTION REFERS TO A3; NOT | | | ON PLAN. | | | | | | 14.)ON THE ROOF FRAMING PLAN AND | | | FOUNDATION PLAN THERE IS A #5 DOWEL TO | | | ATTACH TO EXISTING; HOW LONG? | | | | | | 15.)THE WIND INFORMATION REFERS TO | | | TRUSS LOADS; THIS JOB IS USING ROOF | | | JOISTS. | | | | | | 16.)CONFIRM THAT TRACO (SINGLE HUNG | | | WINDOW PRODUCT APPROVAL SUBMITTED) MAKES | | | A 345 SINGLE HUNG WINDOW WITH A CLEAR | | | NET OPENING FOR EMERGENCY EGRESS. | | | | | | 17.)IMPACT PROTECTION FOR WINDOWS | | | REQUIRED; FBC 1606.1.4. | | | | | | 18.)PROVIDE PRODUCT APPROVALS FOR THE | | | IMPACT PROTECTION AND ROOF. | | | | | | 19.)ADDITIONAL FEES REQUIRED. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2003-05-07 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-05-06 |
Time |
11:13 |
Rev Time |
0.33 |
| Received By |
dpalmer |
Date |
2003-05-07 |
Time |
11:26 |
Sent To |
B |
|
| Notes |
| 2003-05-07 00:00:00 | ************ NOTES REDLINED ********* | | | | | | MISSING SD`S INSIDE AND OUTSIDE BEDROOMS | | | NFPA-72 8-1.4.3 | | | | | | MISSING RECEPT PER 210-52 | | | | | | MISSING ARC FAULT PROTECTIN REQ`D FOR | | | NEW BEDROOM CIRCUIT. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
7 |
Status |
N |
Date |
2003-07-01 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-07-01 |
Time |
09:36 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-07-01 |
Time |
09:36 |
Sent To |
B |
|
| Notes |
| 2003-07-01 00:00:00 | STHYNG DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
6 |
Status |
N |
Date |
2003-06-20 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-06-20 |
Time |
15:13 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-06-20 |
Time |
15:12 |
Sent To |
B |
|
| Notes |
| 2003-06-20 00:00:00 | STHYNG DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2003-06-12 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-06-12 |
Time |
16:03 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-06-12 |
Time |
16:03 |
Sent To |
B |
|
| Notes |
| 2003-06-12 00:00:00 | STHYNG DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2003-06-03 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-06-03 |
Time |
13:10 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-06-03 |
Time |
13:10 |
Sent To |
B |
|
| Notes |
| 2003-06-03 00:00:00 | STHYNG DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2003-05-06 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-05-06 |
Time |
11:13 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-05-06 |
Time |
11:13 |
Sent To |
E |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2003-04-30 |
|
|
Cont ID |
|
| Sent By |
sgraham |
Date |
2003-05-05 |
Time |
09:26 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-04-30 |
Time |
14:10 |
Sent To |
Z |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2003-04-28 |
|
|
Cont ID |
|
| Sent By |
sthyng |
Date |
2003-04-28 |
Time |
12:47 |
Rev Time |
0.00 |
| Received By |
sthyng |
Date |
2003-04-28 |
Time |
12:47 |
Sent To |
Z |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2003-05-05 |
|
|
Cont ID |
|
| Sent By |
sgraham |
Date |
2003-05-05 |
Time |
09:26 |
Rev Time |
0.00 |
| Received By |
sgraham |
Date |
|
Time |
|
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2003-04-30 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-04-30 |
Time |
14:10 |
Rev Time |
0.00 |
| Received By |
sgraham |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2003-04-30 00:00:00 | DENIED, NEED SURVEY |
|
|