Plan Review Details - Permit 03041626
Plan Review Stops For Permit 03041626
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-07-01 Cont ID  
Sent By jgomez Date 2003-07-01 Time 12:21 Rev Time 0.50
Received By jgomez Date 2003-07-01 Time 12:21 Sent To PC
Notes
2003-07-01 00:00:00BUILDING REVIEW PROVISO:
 1-STORM SHUTTERS INSTALLATION SCHEDULE:
 REVISE THE SPACING FOR WOOD ANCHORS.
 SEE THE ENGINEERED DRAWINGS.
 2-UPDATE TRUSS ANCHOR SCHEDULE AND ALL
 DETAILS THAT ARE AFFECTED BY SECTION
 1609.4.3 FBC 2001, WHICH DOES NOT
 ALLOW THE STEEL STRESS TO BE INCREASED
 3-REVISE FRONT EXTERIOR ELEVATION TO
 REFLECT HORIZONTAL SLIDER WINDOWS AS
 REVISED ON WINDOW SCHEDULE.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2003-05-15 Cont ID  
Sent By shernand Date 2003-06-03 Time 09:08 Rev Time 2.00
Received By jgomez Date 2003-05-15 Time 13:45 Sent To  
Notes
2003-05-15 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-PROVIDE COMPLETE INFORMATION FOR STORM
 SHUTTERS WITH UPDATED SBCCI REPORT.
 2-REVISE DETAIL S21 FOR COLUMN LOCATED
 BETWEEN GARAGE AND STAIRWAY TO MATCH
 CONDITIONS SHOWN ON 2ND FLOOR FRAMING
 PLAN WHERE THE TWO GIRDER TRUSSES ARE
 RESTING ON THIS COLUMN. SECTION
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
 3-WINDOW 34SH DOESN'T PROVIDE THE 24"
 CLEAR HEIGHT REQUIRED FOR BEDROOMS.
 SEC. 1005.4 FBC 2001. REVISE AS REQ'D

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-10-07 Cont ID  
Sent By btrobaug Date 2003-10-07 Time 14:08 Rev Time 0.33
Received By btrobaug Date 2003-10-07 Time 14:08 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-05-08 Cont ID  
Sent By csiegber Date 2003-09-19 Time 08:23 Rev Time 0.50
Received By btrobaug Date 2003-05-08 Time 07:27 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-09-29 Cont ID  
Sent By csiegber Date 2003-09-29 Time 11:14 Rev Time 0.00
Received By csiegber Date 2003-09-29 Time 11:14 Sent To M
Notes
2003-09-29 00:00:00TO PK BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-09-19 Cont ID  
Sent By csiegber Date 2003-09-19 Time 08:23 Rev Time 0.00
Received By csiegber Date 2003-09-19 Time 08:23 Sent To E
Notes
2003-09-19 00:00:00TO BT DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-06-03 Cont ID  
Sent By shernand Date 2003-06-03 Time 09:07 Rev Time 0.00
Received By shernand Date 2003-06-03 Time 09:07 Sent To B
Notes
2003-06-03 00:00:00JGOMEZ DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-04-23 Cont ID  
Sent By shernand Date 2003-04-23 Time 09:26 Rev Time 0.00
Received By shernand Date 2003-04-23 Time 09:26 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2003-10-01 Cont ID  
Sent By pkrauss Date 2003-10-01 Time 08:27 Rev Time 0.20
Received By pkrauss Date 2003-10-01 Time 08:27 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-05-15 Cont ID  
Sent By csiegber Date 2003-09-29 Time 11:14 Rev Time 0.20
Received By pkrauss Date 2003-05-15 Time 09:49 Sent To B
Notes
2003-05-15 00:00:00MECHANICAL PERMIT 03041631

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-05-10 Cont ID  
Sent By btrobaug Date 2003-05-08 Time 07:27 Rev Time 0.33
Received By kstevens Date 2003-05-10 Time 16:28 Sent To M
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-04-30 Cont ID  
Sent By shernand Date 2003-04-23 Time 09:27 Rev Time 0.00
Received By sgraham Date   Time   Sent To E
Notes
***NONE***