Review Stop B BUILDING (STRUCTURAL)
Rev No 7 Status P Date 2004-03-03 Cont ID  
Sent By shill Date 2004-03-03 Time 15:27 Rev Time 0.50
Received By shill Date 2004-03-03 Time 15:27 Sent To  
Notes
2004-03-03 00:00:00REVISED SHEETS A2, A5, A9 1/26/04

Review Stop B BUILDING (STRUCTURAL)
Rev No 6 Status F Date 2004-02-05 Cont ID  
Sent By shill Date 2004-02-05 Time 12:17 Rev Time 1.00
Received By shill Date 2004-02-05 Time 12:17 Sent To  
Notes
2004-02-05 00:00:00*****CORRECTIONS*****
  
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 [email protected]
  
 1.)REVISE THE WINDOW SCHEDULE TO
 INCLUDE DOORS WW.CHECK THE DESIGN
 PRESSURE AGAINST THE PRODUCT LIMITATIONS
 IN THE PRODUCT APPROVAL.NOTE THAT THE
 ELEVATIONS SHOW GLAZED DOORS; PRODUCT
 APPROVALS SUBMITTED ARE FOR STEEL DOORS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status F Date 2004-01-10 Cont ID  
Sent By btrobaug Date 2004-01-30 Time 12:50 Rev Time 0.50
Received By shill Date 2004-01-10 Time 19:15 Sent To  
Notes
2004-01-10 00:00:00****CORRECTIONS*****
  
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 [email protected]
  
 1.)THE DESIGN PRESSURE FOR THE DOORS
 (WW, SHEET A1) IS +51.7/-56.5.THE
 PRODUCT APPROVALS SUBMITTED HAVE A MAX
 PRESSURE OF +48/-51 FOR DOUBLE DOORS
 WITH SIDELITES.

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status F Date 2003-11-21 Cont ID  
Sent By kstevens Date 2004-01-05 Time 16:15 Rev Time 1.00
Received By sthyng Date 2003-11-21 Time 08:06 Sent To  
Notes
2003-11-21 00:00:00*****CORRECTIONS*****
  
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 561-805-6724
  
 1.)DOOR WW IS NOT ON THE DOOR
 SCHEDULE.
  
 2.)SUBMIT TWO LEGIBLE COPIES OF
 PRODUCT APPROVALS FOR THE FRENCH DOORS
 AND SIDELITES.
  
 3.)SHEETS A7 AND A8, THE NAILING FOR
 TA21 (USP RT16) CONFLICTS WITH THE
 CATALOG.CHECK ALL CONNECTORS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2003-11-03 Cont ID  
Sent By kstevens Date 2003-11-20 Time 10:23 Rev Time 0.50
Received By sthyng Date 2003-11-03 Time 11:46 Sent To  
Notes
2003-11-03 00:00:00****CORRECTIONS****
 REVISED TRUSS ANCHORING
  
 SAMANTHA THYNG, BUILDING PLANS EXAMINER
 [email protected]
  
 1.)THE TRUSS ANCHOR SCHEDULE FOR
 SHEET A8 WAS NOT CHANGED; STILL HAS
 THE STRESS INCREASE FOR STEEL.
  
 2.)THE ARCHITECT'S LICENSE NUMBER IS
 REQUIRED TO BE ON THE TITLE BLOCK,
 FAC61G1-16.004.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-06-02 Cont ID  
Sent By csiegber Date 2003-10-27 Time 08:21 Rev Time 1.00
Received By sthyng Date 2003-06-02 Time 15:14 Sent To  
Notes
2003-06-02 00:00:00*****PROVISO******
 REVISE SHEETS A7 & A8.REFER TO
 2003 CONNECTORS CATALOG.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-05-16 Cont ID  
Sent By shernand Date 2003-05-30 Time 08:44 Rev Time 3.00
Received By sthyng Date 2003-05-15 Time 20:13 Sent To  
Notes
2003-05-16 00:00:00********CORRECTIONS**********
  
 1.)A NOTICE OF COMMENCEMENT IS
 REQUIRED TO BE FILED WITH THE CLERK OF
 COURTS BEFORE A PERMIT CAN BE ISSUED.
  
 2.)IMPACT FEES MUST BE PAID TO PALM
 BEACH COUNTY.CALL 233-5025 FOR MORE
 INFORMATION.THE PLANS MUST BE STAMPED
 AND THE RECEIPT ATTACHED TO THE
 APPLICATION.
  
 3.)WINDOW V REQUIRES SAFETY GLASS.
 REVISE BOTH THE FLOOR PLAN AND THE
 WINDOW SCHEDULE.
  
 4.)THE WINDOW/SGD AND 'REPAIR
 MASONRY GAPS' DETAILS (A12) MUST COMPLY
 WITH FBC 1707.4.4.2.
  
 5.)THE GARAGE DOOR ATTACHMENT DETAIL
 (A12) CONFLICTS WITH THE PRODUCT
 APPROVAL.
  
 6.)THE ROOF SPECS AND SINGLE HUNG
 WINDOW PRODUCT APPROVALS ARE ILLEGIBLE.
 PROVIDE LEGIBLE COPIES.
  
 7.)THE UPLIFT VALUES FOR SOME OF THE
 CONNECTORS ARE INCORRECT.REFER TO
 USP 2003 CATALOG.
  
 8.)SPECIFY CEILING FINISH AT THE
 ENTRY, WITH ATTACHMENTS.
  
 9.)PROVIDE A STAIR SECTION WITH
 FIREBLOCKING, FBC 2305.1.4.
  
 10.) PROVIDE A STRUCTURAL PLAN FOR THE
 STAIRS INDICATING HOW STAIRS AND
 LANDING WILL BE SUPPORTED.
  
 11.)PROVIDE A SOILS INVESTIGATION
 REPORT.
  
 12.)WOOD BALCONY RAILING DETAIL (A12)
 TO COMPLY WITH FBC 1015.3.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 SAMANTHA THYNG, BUILDING PLANS EXAMINER
 [email protected]

Review Stop E ELECTRICAL
Rev No 6 Status P Date 2004-01-30 Cont ID  
Sent By csiegber Date 2004-02-17 Time 10:04 Rev Time 0.50
Received By btrobaug Date 2004-01-30 Time 12:43 Sent To B
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 5 Status P Date 2004-01-09 Cont ID  
Sent By csiegber Date 2004-01-29 Time 16:29 Rev Time 0.50
Received By btrobaug Date 2004-01-09 Time 15:56 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2003-12-23 Cont ID  
Sent By csiegber Date 2004-01-07 Time 16:52 Rev Time 0.50
Received By btrobaug Date 2003-12-23 Time 14:14 Sent To P
Notes
2003-12-23 00:00:00THERE ARE NO REVISED PLANS SUBMITTED,
 CHANGES WERE MADE ON LAST REVISION.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2003-11-12 Cont ID  
Sent By csiegber Date 2003-12-23 Time 08:30 Rev Time 0.33
Received By btrobaug Date 2003-11-12 Time 18:01 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-06-20 Cont ID  
Sent By csiegber Date 2003-11-07 Time 16:41 Rev Time 0.50
Received By btrobaug Date 2003-06-20 Time 17:10 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-05-06 Cont ID  
Sent By shernand Date 2003-06-20 Time 11:04 Rev Time 0.50
Received By btrobaug Date 2003-05-06 Time 08:38 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 10 Status N Date 2004-02-17 Cont ID  
Sent By csiegber Date 2004-02-17 Time 10:01 Rev Time 0.00
Received By csiegber Date 2004-02-17 Time 10:01 Sent To E
Notes
2004-02-17 00:00:00TO BT DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 9 Status N Date 2004-01-29 Cont ID  
Sent By csiegber Date 2004-01-29 Time 16:28 Rev Time 0.00
Received By csiegber Date 2004-01-29 Time 16:28 Sent To E
Notes
2004-01-29 00:00:00TO BT DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 8 Status N Date 2004-01-07 Cont ID  
Sent By csiegber Date 2004-01-07 Time 16:52 Rev Time 0.00
Received By csiegber Date 2004-01-07 Time 16:52 Sent To E
Notes
2004-01-07 00:00:00TO BT DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2003-12-23 Cont ID  
Sent By csiegber Date 2003-12-23 Time 08:30 Rev Time 0.00
Received By csiegber Date 2003-12-23 Time 08:30 Sent To E
Notes
2003-12-23 00:00:00TO BT DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2003-11-07 Cont ID  
Sent By csiegber Date 2003-11-07 Time 16:40 Rev Time 0.00
Received By csiegber Date 2003-11-07 Time 16:40 Sent To E
Notes
2003-11-07 00:00:00TO BT DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2003-10-27 Cont ID  
Sent By csiegber Date 2003-10-27 Time 08:21 Rev Time 0.00
Received By csiegber Date 2003-10-27 Time 08:21 Sent To B
Notes
2003-10-27 00:00:00TO ST DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-06-20 Cont ID  
Sent By shernand Date 2003-06-20 Time 11:04 Rev Time 0.00
Received By shernand Date 2003-06-20 Time 11:04 Sent To E
Notes
2003-06-20 00:00:00BT DESK

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-06-04 Cont ID  
Sent By shernand Date 2003-06-04 Time 14:06 Rev Time 0.00
Received By shernand Date 2003-06-04 Time 14:06 Sent To B
Notes
2003-06-04 00:00:00STHYNG DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-05-30 Cont ID  
Sent By shernand Date 2003-05-30 Time 08:44 Rev Time 0.00
Received By shernand Date 2003-05-30 Time 08:44 Sent To B
Notes
2003-05-30 00:00:00STHYNG DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-04-21 Cont ID  
Sent By shernand Date 2003-04-21 Time 09:27 Rev Time 0.00
Received By shernand Date 2003-04-21 Time 09:27 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-05-13 Cont ID  
Sent By kstevens Date 2003-05-10 Time 15:28 Rev Time 0.25
Received By pkrauss Date 2003-05-13 Time 09:50 Sent To B
Notes
2003-05-13 00:00:00MECH PERMIT 03014520

Review Stop P PLUMBING
Rev No 3 Status P Date 2004-01-05 Cont ID  
Sent By kstevens Date 2004-01-05 Time 16:15 Rev Time 0.50
Received By kstevens Date 2004-01-05 Time 16:15 Sent To B
Notes
2004-01-05 00:00:00REVISION OK - MOVED L/T LOCATION

Review Stop P PLUMBING
Rev No 2 Status F Date 2003-11-20 Cont ID  
Sent By btrobaug Date 2003-12-23 Time 14:37 Rev Time 0.50
Received By kstevens Date 2003-11-20 Time 10:23 Sent To B
Notes
2003-11-20 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
  
 1) LAUNDRY SINK REQUIRES A VENT. 901.2.1
 2) C/O REQ'D TO BE 4' OFF FLOOR FOR
 ACCESS. 708.10
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-05-10 Cont ID  
Sent By btrobaug Date 2003-11-12 Time 18:08 Rev Time 0.33
Received By kstevens Date 2003-05-10 Time 15:20 Sent To M
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-04-25 Cont ID  
Sent By shernand Date 2003-04-21 Time 09:27 Rev Time 0.00
Received By sgraham Date   Time   Sent To E
Notes
***NONE***