Plan Review Details - Permit 03041477
Plan Review Stops For Permit 03041477
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2003-10-28 Cont ID  
Sent By sthyng Date 2003-10-28 Time 09:17 Rev Time 0.50
Received By sthyng Date 2003-10-28 Time 09:17 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2003-06-04 Cont ID  
Sent By csiegber Date 2003-10-27 Time 08:22 Rev Time 1.00
Received By sthyng Date 2003-06-04 Time 07:55 Sent To  
Notes
2003-06-04 00:00:00*****PROVISO******
 SUBMIT A REVISION FOR SHEET
 A5 USING 2003 CONNECTOR CATALOG
 WITHOUT USING STRESS INCREASES
 FOR STEEL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2003-05-28 Cont ID  
Sent By shernand Date 2003-06-03 Time 16:01 Rev Time 1.00
Received By sthyng Date 2003-05-28 Time 17:56 Sent To  
Notes
2003-05-28 00:00:00*******CORRECTIONS*******
  
 SAMANTHA THYNG, BUILDING PLANS EXAMINER
 [email protected]
  
 1.)PROVIDE A SOILS INVESTIGATION
 REPORT.
  
 2.)REFER TO NOTE 2 ON PREVIOUS
 CORRECTION LIST REGARDING IMPACT FEES.
  
 3.)REFER TO NOTE 10 ON PREVIOUS
 CORRECTION LIST.THE SITE SPECIFIC
 MUST BE SIGNED AND SEALED BY THE
 DESIGNER OF RECORD.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-05-16 Cont ID  
Sent By shernand Date 2003-05-28 Time 15:29 Rev Time 3.00
Received By sthyng Date 2003-05-16 Time 11:32 Sent To  
Notes
2003-05-16 00:00:00*********CORRECTIONS********
  
 1.)A NOTICE OF COMMENCEMENT MUST BE
 FILED WITH THE CLERK OF COURTS BEFORE A
 PERMIT CAN BE ISSUED.
  
 2.)IMPACT FEES MUST BE PAID TO PALM
 BEACH COUNTY.THE PLANS MUST BE STAMPED
 AND THE RECEIPT ATTACHED TO THE PERMIT
 APPLICATION.233-5025
  
 3.)PROVIDE A SOILS INVESTIGATION
 REPORT.
  
 4.)THE GARAGE DOOR JAMB DETAIL
 CONFLICTS WITH THE PRODUCT APPROVAL(A8).
  
 5.)'REPAIR MASONRY GAPS' AND 'WINDOW
 & SGD' DETAILS MUST COMPLY WITH FBC
 1707.4.4.2.
  
 6.)SOME OF THE CONNECTOR VALUES ARE
 INCORRECT.REFER TO USP 2003 CATALOG.
  
 7.)THE PRIVACY WALL DETAIL, SHEET A7,
 CONFLICTS WITH THE PRIVACY WALL DETAIL,
 SHEET A3.
  
 8.)SHOW WINDOW O AS TEMPERED ON THE
 WINDOW SCHEDULE.
  
 9.)SINGLE HUNG WINDOW AND ROOF SPECS
 ARE ILLEGIBLE.
  
 10.) THE SITE SPECIFIC MUST BE SEALED BY
 THE ENGINEER IN SECTION 9.
  
 11.)THE STORM PANELS FOR OPENINGS
 #7 AND #10 EXCEED THE SPAN ALLOWED PER
 SBCCI PRODUCT APPROVAL.#12 HAS
 INCORRECT ANCHOR SPACING.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 SAMANTHA THYNG, BUILDING PLANS EXAMINER
 [email protected]

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2003-08-04 Cont ID  
Sent By dpalmer Date 2003-08-04 Time 07:31 Rev Time 0.25
Received By dpalmer Date 2003-08-04 Time 07:31 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status F Date 2003-07-14 Cont ID  
Sent By alange Date 2003-07-28 Time 09:55 Rev Time 0.33
Received By dpalmer Date 2003-07-14 Time 13:03 Sent To  
Notes
2003-07-14 00:00:00************ UNSAT *************
  
 1)NOTE: PLEASE REMOVE EQUIPMENT GROUND-
 -ING CONDUCTOR FROM METER TO PANEL W/
 MCB. PLANS USED TO SHOW A MAIN DISC ON
 THE LINE SIDE OF PANEL AND THEREFORE AN
 EQUIPMENT GRND IS REQ`D. HOWEVER, THERE
 IS NO MAIN SHOWN ANYMORE. 250-24
  
 2)NOTE: PLEASE PLACE REQ'D INFORMATION
 UNDER FAC/ FS ON TITLE BLOCK. LICENSE #
 FIRM REG #. 61G1-16.004, 481
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-06-17 Cont ID  
Sent By shernand Date 2003-07-07 Time 16:54 Rev Time 0.25
Received By dpalmer Date 2003-06-17 Time 08:26 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-04-30 Cont ID  
Sent By shernand Date 2003-06-12 Time 11:39 Rev Time 0.50
Received By btrobaug Date 2003-04-30 Time 09:58 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 9 Status N Date 2003-12-12 Cont ID  
Sent By csiegber Date 2003-12-12 Time 12:07 Rev Time 0.00
Received By csiegber Date 2003-12-12 Time 12:07 Sent To P
Notes
2003-12-12 00:00:00TO KS BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 8 Status N Date 2003-10-27 Cont ID  
Sent By csiegber Date 2003-10-27 Time 08:22 Rev Time 0.00
Received By csiegber Date 2003-10-27 Time 08:22 Sent To B
Notes
2003-10-27 00:00:00TO ST DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 7 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By alange Date 2003-07-28 Time 09:55 Sent To  
Notes
2003-07-28 00:00:00TO DP DESK

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2003-07-07 Cont ID  
Sent By shernand Date 2003-07-07 Time 16:54 Rev Time 0.00
Received By shernand Date 2003-07-07 Time 16:54 Sent To E
Notes
2003-07-07 00:00:00DP DESK

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2003-06-12 Cont ID  
Sent By shernand Date 2003-06-12 Time 11:39 Rev Time 0.00
Received By shernand Date 2003-06-12 Time 11:39 Sent To E
Notes
2003-06-12 00:00:00BT DESK

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-06-03 Cont ID  
Sent By shernand Date 2003-06-03 Time 16:01 Rev Time 0.00
Received By shernand Date 2003-06-03 Time 16:01 Sent To B
Notes
2003-06-03 00:00:00STHYNG DESK

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-06-03 Cont ID  
Sent By shernand Date 2003-06-03 Time 15:57 Rev Time 0.00
Received By shernand Date 2003-06-03 Time 15:57 Sent To B
Notes
2003-06-03 00:00:00STHYNG DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-05-28 Cont ID  
Sent By shernand Date 2003-05-28 Time 15:29 Rev Time 0.00
Received By shernand Date 2003-05-28 Time 15:29 Sent To B
Notes
2003-05-28 00:00:00STHYNG DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-04-21 Cont ID  
Sent By shernand Date 2003-04-21 Time 09:40 Rev Time 0.00
Received By shernand Date 2003-04-21 Time 09:40 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-05-13 Cont ID  
Sent By kstevens Date 2003-05-10 Time 15:01 Rev Time 0.20
Received By pkrauss Date 2003-05-13 Time 10:21 Sent To  
Notes
2003-05-13 00:00:00MECH PERMIT 03041499

Review Stop P PLUMBING
Rev No 2 Status P Date 2003-12-13 Cont ID  
Sent By jleech Date 2003-12-13 Time 12:30 Rev Time 0.25
Received By jleech Date 2003-12-13 Time 12:29 Sent To  
Notes
2003-12-13 00:00:00REVISED RISER DIAGRAM.

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-05-10 Cont ID  
Sent By csiegber Date 2003-12-12 Time 12:07 Rev Time 0.33
Received By kstevens Date 2003-05-10 Time 15:01 Sent To M
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-04-24 Cont ID  
Sent By shernand Date 2003-04-21 Time 09:41 Rev Time 0.00
Received By sgraham Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved