Plan Review Details - Permit 03041401
Plan Review Stops For Permit 03041401
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-12-10 Cont ID  
Sent By dpalmer Date 2003-12-11 Time 06:33 Rev Time 1.00
Received By shill Date 2003-12-10 Time 14:16 Sent To E
Notes
2003-12-10 00:00:00**PROVISO**
 NAILING FOR USP RT20T INCONSISTENT
 WITH CATALOG - SUBMIT REVISED CONNECTOR
 OR CALCULATIONS

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status N Date 2003-05-02 Cont ID  
Sent By csiegber Date 2003-12-03 Time 09:54 Rev Time 1.00
Received By sthyng Date 2003-05-02 Time 14:24 Sent To  
Notes
2003-05-02 00:00:00MASTER 02090696

Review Stop E ELECTRICAL
Rev No 3 Status F Date 2003-12-11 Cont ID  
Sent By dpalmer Date 2003-12-11 Time 06:33 Rev Time 0.33
Received By dpalmer Date 2003-12-11 Time 06:33 Sent To B
Notes
2003-12-11 00:00:00************** UNSAT ***************
  
 1)NOTE: PLEASE SEE FS 471.025 AND FAC
 61G15-23.002. PLANS ARE REQ'D TO HAVE
 A SIGNATURE BY THE ENGINEER OF RECORD.
 THIE OFFICE HAS BEEN INFORMED BY THE
 FBPE'S THAT INITIALS ARE NOT ACCEPTABLE
 AND SIGNATURES CONTAINING A MIN OF FIRST
 AND LAST NAME MUST BE ON SEAL.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-09-24 Cont ID  
Sent By shill Date 2003-12-10 Time 14:16 Rev Time 0.25
Received By dpalmer Date 2003-09-24 Time 19:17 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status N Date 2003-05-02 Cont ID  
Sent By sthyng Date 2003-05-02 Time 14:24 Rev Time 0.00
Received By sthyng Date 2003-05-02 Time 14:24 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status N Date 2003-05-02 Cont ID  
Sent By sthyng Date 2003-05-02 Time 14:24 Rev Time 0.00
Received By sthyng Date 2003-05-02 Time 14:24 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status N Date 2003-05-02 Cont ID  
Sent By sthyng Date 2003-05-02 Time 14:24 Rev Time 0.00
Received By sthyng Date 2003-05-02 Time 14:24 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2003-12-15 Cont ID  
Sent By shill Date 2003-12-15 Time 09:46 Rev Time 0.00
Received By shill Date 2003-12-15 Time 09:46 Sent To Z
Notes
2003-12-15 00:00:00ZONING REQUIRED - SENT TO ZONING
 REVISION TO ADD ELEC METER CLOSET AND
 SHUTTER STORAGE CLOSET

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2003-12-03 Cont ID  
Sent By csiegber Date 2003-12-11 Time 09:01 Rev Time 0.00
Received By csiegber Date 2003-12-03 Time 09:53 Sent To B
Notes
2003-12-03 00:00:00TO ST DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-11-26 Cont ID  
Sent By csiegber Date 2003-11-26 Time 08:52 Rev Time 0.00
Received By csiegber Date 2003-11-26 Time 08:52 Sent To P
Notes
2003-11-26 00:00:00TO KS BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-10-17 Cont ID  
Sent By csiegber Date 2003-10-17 Time 12:56 Rev Time 0.00
Received By csiegber Date 2003-10-17 Time 13:11 Sent To B
Notes
2003-10-17 00:00:00TO HP DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-07-31 Cont ID  
Sent By alange Date 2003-07-31 Time 09:02 Rev Time 0.00
Received By alange Date 2003-07-31 Time 09:02 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-05-08 Cont ID  
Sent By shernand Date 2003-05-08 Time 10:16 Rev Time 0.00
Received By shernand Date 2003-05-08 Time 10:16 Sent To P
Notes
2003-05-08 00:00:00REVISION

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2003-05-02 Cont ID  
Sent By sthyng Date 2003-05-02 Time 14:24 Rev Time 0.00
Received By sthyng Date 2003-05-02 Time 14:24 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 4 Status P Date 2003-12-15 Cont ID  
Sent By kstevens Date 2003-12-15 Time 17:14 Rev Time 0.50
Received By kstevens Date 2003-12-15 Time 17:14 Sent To  
Notes
2003-12-15 00:00:00REVISION OK - ADDED AN EXPANSION TANK TO
 THE WATER SERVICE.

Review Stop P PLUMBING
Rev No 3 Status P Date 2003-08-09 Cont ID  
Sent By csiegber Date 2003-11-26 Time 08:52 Rev Time 0.50
Received By kstevens Date 2003-08-09 Time 17:49 Sent To  
Notes
2003-08-09 00:00:00REVISION OK - ADDED RISER VALVES AND
 BUILDING S.O.V.

Review Stop P PLUMBING
Rev No 2 Status F Date 2003-05-20 Cont ID  
Sent By alange Date 2003-07-31 Time 09:02 Rev Time 0.33
Received By kstevens Date 2003-05-20 Time 12:50 Sent To  
Notes
2003-05-20 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
  
 1) FULL OPEN VALVE REQUIRED ON THE ENT-
 RANCE INTO THE STRUCTURE. SEC 606.1(2)
 2) FULL OPEN VALVES REQUIRED AT THE BASE
 OF EVERY WATER RISER. SEC 606.1(3)
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377
 (561) 805-6721
 FAX (561) 653-2692

Review Stop P PLUMBING
Rev No 1 Status N Date 2003-05-02 Cont ID  
Sent By shernand Date 2003-05-08 Time 10:19 Rev Time 0.00
Received By sthyng Date 2003-05-02 Time 14:24 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status F Date 2003-12-16 Cont ID  
Sent By mmclean Date 2003-12-16 Time 15:14 Rev Time 0.00
Received By mmclean Date 2003-12-16 Time 15:14 Sent To  
Notes
2003-12-16 00:00:00DENIED, NEED MINOR AMENDMENT FOR
 FOOTPRINT CHANGES MM

Review Stop Z ZONING
Rev No 2 Status N Date 2003-12-11 Cont ID  
Sent By shill Date 2003-12-15 Time 09:55 Rev Time 0.00
Received By csiegber Date 2003-12-11 Time 09:00 Sent To I
Notes
2003-12-11 00:00:00NO ZONING REQUIRED FOR ELEC MM

Review Stop Z ZONING
Rev No 1 Status N Date 2003-05-02 Cont ID  
Sent By sthyng Date 2003-05-02 Time 14:25 Rev Time 0.00
Received By sthyng Date 2003-05-02 Time 14:28 Sent To  
Notes
***NONE***