Plan Review Details - Permit 03040606
Plan Review Stops For Permit 03040606
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-05-07 Cont ID  
Sent By rmcdouga Date 2003-05-07 Time 17:53 Rev Time 2.00
Received By rmcdouga Date 2003-05-07 Time 17:53 Sent To  
Notes
2003-05-07 00:00:00BUILDING PROVISO
  
 1) SUBMIT A SOIL BORING TEST REPORT AS
 REQUIRED BY CITY AMEND. TO FBC 1804.2.2,
 PRIOR TO POURING THE FOUNDATION.
  
 2) SUBMIT REVISED TRUSS CONNECTOR UPLIFT
 VALUES THAT DO NOT INCLUDE A STRESS
 INCREASE ON THE STEEL CALCULATIONS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-05-06 Cont ID  
Sent By rregueir Date 2003-04-19 Time 14:36 Rev Time 4.00
Received By rmcdouga Date   Time   Sent To  
Notes
2003-05-06 00:00:00BUILDING DENIED
  
 1) A RECORDED COPY OF THE NOTICE OF
 COMMENCEMENT MUST BE SUBMITTED BEFORE A
 PERMIT CAN BE ISSUED.
  
 2) PROVIDE A SOIL BORING TEST REPORT AS
 REQUIRED BY CITY AMEND. TO FBC 1804.2.2.
  
 3) THE COVERED PATIO SHOWN ON THE SURVEY
 DOES NOT MATCH THE ONE ON THE PLANS.
  
 4) SPECIFY THE LENGTH/EMBEDMENT DEPTH OF
 THE 1/2" DIAMETER EXPANSION ANCHORS USED
 AT THE WOOD FRAME TO CONCRETE WALL
 CONNECTION ON SHEET A6.
  
 5) THE COLUMN SCHEDULE ON S1 SPECIFIES
 A C2 COLUMN AS A TWO 2X4 WOOD POST. THE
 NOTE ON THE FOUNDATION PLAN ON S2,
 SPECIFIES A THREE 2X4 WOOD POST. PLEASE
 CORRECT.
  
 6) STRESS INCREASES FOR SHORT TERM
 LOADING OF STEEL ARE NO LONGER ALLOWED
 TO BE TAKEN BY FBC 1609.4.3. SEE THE
 2003 FBC CATALOG FOR LOAD VALUES THAT DO
 NOT INCLUDE A STRESS INCREASE ON THE
 STEEL CALCULATIONS. PLEASE REVISE THE
 CONNECTOR UPLIFT VALUES ACCORDINGLY.
  
 7) REVISE NOTE 7 UNDER EXTERIOR SOFFIT
 SPECS. TO INDICATE THAT 3/8" HIGH RIB
 METAL LATH IS REQUIRED TO BE FASTENED
 AT EVERY RIB (4"O.C.) PER ASTM C 1063.
 NOTES 4 AND 5 ARE THE SAME.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)659-8096 EXT.8202

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-09-02 Cont ID  
Sent By btrobaug Date 2003-09-02 Time 15:53 Rev Time 0.50
Received By btrobaug Date 2003-09-02 Time 15:44 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-04-16 Cont ID  
Sent By csiegber Date 2003-08-25 Time 08:35 Rev Time 0.50
Received By btrobaug Date 2003-04-16 Time 14:19 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-08-25 Cont ID  
Sent By csiegber Date 2003-08-25 Time 08:35 Rev Time 0.00
Received By csiegber Date 2003-08-25 Time 08:35 Sent To E
Notes
2003-08-25 00:00:00TO BT DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-04-09 Cont ID  
Sent By shernand Date 2003-04-09 Time 09:24 Rev Time 0.00
Received By shernand Date 2003-04-09 Time 09:24 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-04-19 Cont ID  
Sent By jleech Date 2003-04-19 Time 13:21 Rev Time 0.33
Received By rregueir Date 2003-04-19 Time 14:36 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-04-19 Cont ID  
Sent By btrobaug Date 2003-04-16 Time 14:36 Rev Time 0.33
Received By jleech Date 2003-04-19 Time 13:21 Sent To M
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-04-09 Cont ID  
Sent By shernand Date 2003-04-09 Time 09:24 Rev Time 0.00
Received By sgraham Date   Time   Sent To E
Notes
***NONE***