Plan Review Details - Permit 03040480
Plan Review Stops For Permit 03040480
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2003-08-26 Cont ID  
Sent By jgomez Date 2003-08-26 Time 12:12 Rev Time 0.75
Received By jgomez Date 2003-08-26 Time 12:12 Sent To PC
Notes
2003-08-26 00:00:00SUBMITTAL CHECKLIST:
 1-MISSING COMPLETE INFORMATION FOR
 STORM SHUTTERS AS REQUESTED ON
 PROVISO DATED 4-25-03.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2003-04-25 Cont ID  
Sent By dbaxter Date 2003-08-15 Time 13:23 Rev Time 2.00
Received By jgomez Date 2003-04-25 Time 09:21 Sent To  
Notes
2003-04-25 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-PROVIDE SOIL TEST REPORT PRIOR TO
 CONSTRUCTION.
 2-RESUBMIT ENERGY CALCULATIONS WITH
 ENGINEER'S ORIGINAL SIGNATURE & SEAL.
 CHAPTER 471 FLORIDA STATUTES AND SEC.
 103.0 CHAPTER 13 FBC 2001.
 3-RESUBMIT STORM PANELS INFORMATION WITH
 UPDATED SBCCI PRODUCT APPROVAL THAT
 MATCHES ENGINEERED DRAWINGS. CHECK AND
 REVISE DESIGN PRESSURES AND PANEL MAX/
 MIN SPAN SHOWN ON INSTALLATION SCHED.
 TO MATCH ENGINEERED DRAWINGS. SECTION
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
 4-REVISE/CLARIFY DETAIL S26 TO MATCH
 2ND FLOOR FRAMING PLAN CONDITIONS.
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-09-29 Cont ID  
Sent By btrobaug Date 2003-09-29 Time 13:11 Rev Time 0.25
Received By btrobaug Date 2003-09-29 Time 13:11 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-04-15 Cont ID  
Sent By csiegber Date 2003-09-17 Time 16:19 Rev Time 0.50
Received By btrobaug Date 2003-04-15 Time 09:12 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-09-17 Cont ID  
Sent By csiegber Date 2003-09-17 Time 16:19 Rev Time 0.00
Received By csiegber Date 2003-09-17 Time 16:19 Sent To E
Notes
2003-09-17 00:00:00TO BT DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-08-15 Cont ID  
Sent By dbaxter Date 2003-08-15 Time 13:23 Rev Time 0.00
Received By dbaxter Date 2003-08-15 Time 13:23 Sent To B
Notes
2003-08-15 00:00:00TO JGOMEZ DESK.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-04-07 Cont ID  
Sent By shernand Date 2003-04-07 Time 09:05 Rev Time 0.00
Received By shernand Date 2003-04-07 Time 09:05 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-04-19 Cont ID  
Sent By jleech Date 2003-04-19 Time 10:23 Rev Time 0.33
Received By jleech Date 2003-04-19 Time 10:23 Sent To P
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-04-19 Cont ID  
Sent By jleech Date 2003-04-19 Time 10:23 Rev Time 0.25
Received By jleech Date 2003-04-19 Time 10:23 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-04-09 Cont ID  
Sent By shernand Date 2003-04-07 Time 09:07 Rev Time 0.00
Received By sgraham Date   Time   Sent To E
Notes
***NONE***