Plan Review Details - Permit 03032420
Plan Review Stops For Permit 03032420
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2003-05-20 Cont ID  
Sent By jgomez Date 2003-05-20 Time 10:34 Rev Time 0.25
Received By jgomez Date 2003-05-20 Time 10:34 Sent To  
Notes
2003-05-20 00:00:00PROVISO:
 1-PROVIDE SOIL TEST REPORT PRIOR TO
 CONSTRUCTION.
 2-RESUBMIT CORRECT STORM SHUTTERS
 INFORMATION TO MATCH DESIGN PRESSURES
 CALCULATED BY THE ARCHITECT.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status   Date 2003-05-13 Cont ID  
Sent By shernand Date 2003-05-16 Time 16:35 Rev Time 2.00
Received By jgomez Date 2003-05-13 Time 16:19 Sent To PC
Notes
2003-05-13 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-PROVIDE SOIL TEST REPORT PRIOR TO
 CONSTRUCTIONNOT AT TIME OF SLAB
 INSPECTION. DENSITY TEST IS THE ONE
 TO BE COLLECTED AT TIME OF SLAB
 INSPECTION.
 2-PROVIDE COMPLETE/CORRECT INFORMATION
 FOR STORM SHUTTERS UNDER A SEPARATE
 PERMIT: A)REVISE DESIGN PRESSURES. SEE
 DESIGN PRESSURES CALCULATED BY THE
 ARCHITECT. B)SEE ENGINEERED DRAWINGS
 FOR MAX./MIN. PANEL SIZE ACCORDING TO
 DESIGN PRESSURES & REVISE INSTALLATION
 SCHEDULE AS REQUIRED. C)CLEARLY MARK/
 CIRCLE ON ENGINEERED DRAWINGS THE
 MOUNTING CONDITIONS, TYPE AND ANCHOR
 SPACING ACCORD'G TO THE EDGE DISTANCE,
 DESIGN PRESSURES, CONNECTION TYPE,
 PANEL SPAN & STRUCTURE TO BE ATTACHED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status   Date 2003-04-30 Cont ID  
Sent By shernand Date 2003-05-09 Time 16:09 Rev Time 3.00
Received By jgomez Date 2003-04-30 Time 10:59 Sent To  
Notes
2003-04-30 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-PROVIDE SOIL TEST REPORT PRIOR TO
 CONSTRUCTION.
 2-PROVIDE COMPLETE/CORRECT INFORMATION
 FOR STORM SHUTTERS UNDER A SEPARATE
 PERMIT.
 3-RESUBMIT PRODUCT APPROVAL FOR SINGLE
 HUNG WINDOWS WITH LEGIBLE DRAWINGS.
 4-REVISE SPECIFICATIONS FOR INSTALLATION
 OF METHAL LATH AT PORCH CEILING. SEE
 SHEET A2. FASTENER TO HAVE 1 3/4" MIN.
 PENETRATION TO THE HORIZONTAL MEMBER.
 SEE ASTM C-1063 AND REVISE AS REQUIRED

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-12-22 Cont ID  
Sent By dpalmer Date 2003-12-22 Time 15:28 Rev Time 0.33
Received By dpalmer Date 2003-12-22 Time 15:28 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-04-10 Cont ID  
Sent By csiegber Date 2003-12-19 Time 14:27 Rev Time 0.25
Received By dpalmer Date 2003-04-10 Time 03:17 Sent To P
Notes
2003-04-10 00:00:00********** NOTES REDLINED ***********
  
 PLEASE SEE CIRCUITING FOR GEN LT IN SUB-
 PANEL. SHOWS 10 CIR AT 60A #6?
 SHOULD BE 15A/20A #14/12?
  
 1)NOTE: PLEASE SEE MISSING EQUIPMENT
 GROUNDING CONDUCTOR BETWEEN MAIN PANEL
 AND SUB PANEL.
  
 IF THERE ARE ANY QUESTIONS, PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-659-8096 EXT 8372
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-12-19 Cont ID  
Sent By csiegber Date 2003-12-19 Time 14:27 Rev Time 0.00
Received By csiegber Date 2003-12-19 Time 14:27 Sent To E
Notes
2003-12-19 00:00:00TO DP DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-05-16 Cont ID  
Sent By shernand Date 2003-05-16 Time 16:35 Rev Time 0.00
Received By shernand Date 2003-05-16 Time 16:35 Sent To B
Notes
2003-05-16 00:00:00JGOMEZ DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-05-09 Cont ID  
Sent By shernand Date 2003-05-09 Time 16:09 Rev Time 0.00
Received By shernand Date 2003-05-09 Time 16:09 Sent To B
Notes
2003-05-09 00:00:00JGOMEZ DESK. RESUB

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-04-01 Cont ID  
Sent By sthyng Date 2003-04-01 Time 10:30 Rev Time 0.00
Received By sthyng Date 2003-04-01 Time 10:30 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-04-19 Cont ID  
Sent By jleech Date 2003-04-16 Time 17:17 Rev Time 0.33
Received By rregueir Date 2003-04-19 Time 12:00 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-04-16 Cont ID  
Sent By dpalmer Date 2003-04-10 Time 03:18 Rev Time 0.33
Received By jleech Date 2003-04-16 Time 17:16 Sent To M
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-04-30 Cont ID  
Sent By sthyng Date 2003-04-01 Time 10:30 Rev Time 0.00
Received By jgomez Date 2003-04-30 Time 10:59 Sent To  
Notes
2003-04-30 00:00:00APPROVED BY SHIRLEY 4-3-03. SEE SURVEY.