Plan Review Details - Permit 03032245
Plan Review Stops For Permit 03032245
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-05-05 Cont ID  
Sent By hpiskura Date 2003-05-05 Time 13:24 Rev Time 0.00
Received By hpiskura Date 2003-05-05 Time 13:24 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-04-21 Cont ID  
Sent By dpalmer Date 2003-05-05 Time 08:41 Rev Time 0.00
Received By hpiskura Date 2003-04-21 Time 12:54 Sent To  
Notes
2003-04-21 00:00:00SHOW THE DESIGN LOADS FOR THE TRUSSES.
  
 SHOW A DETAIL FOR THE CONNECTION OF THE
 NEW TRUSSES TO THE EXISTING ROOF
 TRUSSES AND AN ANALYSIS OF THE EXISTING
 TRUSSES ABILITY TO ASSUME THE
 ADDITIONAL LOADING.SEE FBC 2309.2.4.
  
 SHOW THE ATTIC ACCESS IN ACCORDANCE WITH
 FBC 2309.6 AND THE VENTILATION TO 2309.
 7.
  
 SHOW THE DESIGN WIND PRESSSURES FOR THE
 ROOF COVERING IN EACH ZONE, AND OTHER
 INFORMATION.SEE FBC 104.2.1.1.

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2003-06-09 Cont ID  
Sent By btrobaug Date 2003-06-09 Time 10:02 Rev Time 0.33
Received By btrobaug Date 2003-06-09 Time 09:59 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-05-05 Cont ID  
Sent By shernand Date 2003-06-06 Time 14:27 Rev Time 0.50
Received By dpalmer Date 2003-05-05 Time 08:40 Sent To B
Notes
2003-05-05 00:00:00************** PROVISO/REVISE *********
  
 1)NOTE: PLEASE REDRAW PLANS BEFORE ROUGH
 ALONG WITH ANY CHANGES.
  
 2)NOTE: PLEASE SEE RISER, SHOWS 6-3/0`S?
 FOR A 200A DISC? PLEASE CLARIFY?
  
 PLEASE PRINT ALL CLEARLY.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2003-04-09 Cont ID  
Sent By sthyng Date 2003-04-28 Time 11:34 Rev Time 0.33
Received By dpalmer Date 2003-04-09 Time 04:56 Sent To M
Notes
2003-04-09 00:00:00*************** UNSAT ***************
  
 1)NOTE: PLEASE CORRELATE PANEL SCHEDULES
 / LOAD CALCULATIONS. PLEASE REVISE LOAD
 CALCULATIONS.220-3
 SOME LOADS MISSING ON LOAD CALCS.
 BOTH SUB-PANELS ARE NOT SHOWN ON MAIN
 PANEL SCHEDULE?
 POOL EQUIPMENT LOADS NEED TO CORRELATE
 W/ LOAD CALCS.
 PANEL MENTIONS EXISTING 2P-70A AND
 PANEL SCHEDULE FOR MAIN PANEL SHOWS
 ONLY ONE SUB PANEL AND IT IS SHOWN AT
 60A?? PLEASE CORRRELATE.
  
 2)NOTE: PLEASE SHOW LOCATION OF NEW
 PANEL AND GROUPING OF MAINS PER 230-72
  
 3)NOTE: PLEASE SEE PLANS, TWO DIFFERENT
 EXISTING RISER DIAGRAMS SUBMITTED FOR
 REVIEW? PLEASE ONLY SUBMIT THE ACTUAL
 EXISTING.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-659-8096 EXT 8372
 [email protected].

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-06-06 Cont ID  
Sent By shernand Date 2003-06-06 Time 14:26 Rev Time 0.00
Received By shernand Date 2003-06-06 Time 14:26 Sent To E
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-04-28 Cont ID  
Sent By sthyng Date 2003-04-28 Time 11:33 Rev Time 0.00
Received By sthyng Date 2003-04-28 Time 11:33 Sent To E
Notes
2003-04-28 00:00:00TO DP DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-04-07 Cont ID  
Sent By shernand Date 2003-04-07 Time 15:16 Rev Time 0.00
Received By shernand Date 2003-04-07 Time 15:15 Sent To E
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-04-01 Cont ID  
Sent By sgraham Date 2003-04-04 Time 10:24 Rev Time 0.00
Received By sthyng Date 2003-04-01 Time 16:25 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-04-09 Cont ID  
Sent By dpalmer Date 2003-04-09 Time 04:57 Rev Time 0.35
Received By pkrauss Date 2003-04-09 Time 13:56 Sent To P
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2003-04-11 Cont ID  
Sent By pkrauss Date 2003-04-09 Time 13:57 Rev Time 0.25
Received By kstevens Date 2003-04-11 Time 15:40 Sent To B
Notes
2003-04-11 00:00:00NO PLUMBING PLANS SUBMITTED

Review Stop Z ZONING
Rev No 1 Status P Date 2003-04-04 Cont ID  
Sent By sthyng Date 2003-04-01 Time 16:25 Rev Time 0.00
Received By sgraham Date   Time   Sent To I
Notes
***NONE***