| Plan Review Stops For Permit 03031952 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
6 |
Status |
P |
Date |
2003-09-08 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2003-09-08 |
Time |
09:33 |
Rev Time |
0.50 |
| Received By |
jgomez |
Date |
2003-09-08 |
Time |
09:33 |
Sent To |
PC |
|
| Notes |
| 2003-09-08 00:00:00 | MINOR REVISIONS. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
5 |
Status |
P |
Date |
2003-06-27 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2003-09-06 |
Time |
18:56 |
Rev Time |
0.25 |
| Received By |
jgomez |
Date |
2003-06-27 |
Time |
11:37 |
Sent To |
PC |
|
| Notes |
| 2003-06-27 00:00:00 | PERMIT FEES PAID. PLANS APPROVED WITH | | | PROVISO DATED 6-18-03. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
|
Date |
2003-06-23 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-06-26 |
Time |
08:36 |
Rev Time |
0.25 |
| Received By |
jgomez |
Date |
2003-06-23 |
Time |
09:03 |
Sent To |
PC |
|
| Notes |
| 2003-06-23 00:00:00 | NEED TO PAY IMPACT FEES TO PASS BUILDING | | | STOP. OTHERWISE, PASSED WITH PROVISO. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
|
Date |
2003-06-18 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2003-06-23 |
Time |
07:12 |
Rev Time |
3.00 |
| Received By |
jgomez |
Date |
2003-06-18 |
Time |
17:29 |
Sent To |
E |
|
| Notes |
| 2003-06-18 00:00:00 | BUILDING REVIEW APPROVED WITH PROVISO: | | | 1-PROVIDE SOIL TEST REPORT. "MASTER SOIL | | | TEST" IS PRELIMINARY AND CALLS FOR | | | ADDITIONAL BORINGS ON THE LIMITATIONS. | | | 2-RESUBMIT STORM SHUTTERS: | | | A)DESIGN PRESSURES ARE LOWER THAN THOSE | | | CALCULATED BY THE ARCHITECT OF RECORD. | | | B)REVISE SIZE OF PANEL SPAN. SEE THE | | | ENGINEERED DRAWINGS FOR MIN. SIZE. | | | C)CLEARLY MARK ON THE ENGINEERED DWGS | | | ANCHOR TYPE AND SPACING TO BE USED | | | ACCORDING TO THE EDGE DISTANCE (THIS | | | MAKES A BIG DIFFERENCE ON THE ANCHOR | | | SPACING), DESIGN PRESSURE, PANEL SPAN, | | | CONNECTION TYPE AND STRUCTURE TO BE | | | ATTACHED TO. | | | | | | 3-PROVIDE STRUCTURAL BUCK DETAIL FOR | | | GARAGE DOOR. SEC. 104.2.1.2 CITY | | | AMENDMENTS TO FBC 2001. | | | 4-SPECIFY SAFETY GLASS FOR GLASS BLOCK | | | BY TUB & SHOWER AREA IF FACE THICKNESS | | | OF GLASS BLOCK IS LESS THAN 0.25". | | | SEE SEC. 2405.2 FBC 2001. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2003-05-13 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-06-12 |
Time |
08:17 |
Rev Time |
2.50 |
| Received By |
jgomez |
Date |
2003-05-13 |
Time |
12:18 |
Sent To |
M |
|
| Notes |
| 2003-05-13 00:00:00 | BUILDING CHECKLIST: | | | 1-REAR ELEVATION EXCEEDS THE MAXIMUM | | | PERCENTAGE OF OPENINGS ALLOWED BY | | | TABLE 600 FBC 2001. | | | **NOTE: TABLE 600 REFERS TO OPENINGS IN | | | THE WALL AREA, NOT GLASS AREA IN THE | | | OPENING. | | | 2-PROVIDE SOIL TEST REPORT NOW. NOT AT | | | TIME OF CONCRETE SLAB. THIS IS PART | | | OF PLAN REVIEW AND INFORMATION NEEDED | | | BY DESIGNER TO DESIGN FOOTINGS ETC. | | | SEC. 104.2.1.2 CITY AMENDMENTS TO FBC. | | | 3-PAY IMPACT FEES AND BRING BACK PAID | | | RECEIPT AND STAMPED DRAWINGS. | | | 4-STORM SHUTTERS: | | | A)REVISE DESIGN PRESSURES. SEE PLANS FOR | | | CALCULATED PRESSURES BY THE ARCHITECT. | | | B)SEE ENGINEERED DRAWINGS FOR MAXIMUM | | | AND MINIMUM PANEL SPAN ACCORDING TO | | | THE DESIGN PRESSURES. | | | C)CLEARLY MARK/CIRCLE ON STORM SHUTTERS | | | DRAWINGS THE MOUNTING CONDITIONS AND | | | ANCHOR TYPE AND SPACING TO BE USED | | | ACCORDING TO THE EDGE DISTANCE, DESIGN | | | PRESSURES, CONNECTION TYPE, PANEL SPAN | | | AND STRUCTURE TO BE ATTACHED TO. | | | SEC. 104.2.1.2 CITY AMENDMENTS TO FBC. | | | | | | 5-PROVIDE PRODUCT APPROVAL FOR FRENCH | | | DOORS WITH SIDELITES SINGLE ASSEMBLY | | | AS SHOWN ON PLANS. **BROWARD COUNTY | | | PRODUCT APPROVAL IS NOT ACCEPTABLE. | | | PROVIDE DADE COUNTY, SBCCI OR SITE | | | SPECIFIC ENGINEERING(SEE ATTACHED CITY | | | SAMPLE FORM FOR SITE SPECIFIC DOOR) | | | SIGNED AND SEALED BY THE ENGINEER AND | | | BY THE DESIGNER OF RECORD. | | | **NOTE: ENGINEER TO CLARIFY WHY FORM | | | SUBMITTED SAYS THAT 2X BUCK DETAIL IS | | | NOT STRUCTURAL. | | | 6-CLARIFY WHY PERMIT APPLICATION AND | | | ENERGY CALCULATIONS HAVE DIFFERENT | | | CONTRACTORS NAME. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2003-04-30 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-05-09 |
Time |
16:14 |
Rev Time |
3.00 |
| Received By |
jgomez |
Date |
2003-04-29 |
Time |
17:36 |
Sent To |
|
|
| Notes |
| 2003-04-29 00:00:00 | BUILDING REVIEW CHECKLIST: | | | 1-REAR ELEVATION EXCEEDS THE MAXIMUM | | | PERCENTAGE OF OPENINGS ALLOWED BY | | | TABLE 600 FBC 2001. REVISE AS REQUIRED | | | 2-PROVIDE SOIL TEST REPORT. | | | 3-PAY IMPACT FEES BRING BACK STAMPED | | | DRAWINGS AND PAID RECEIPT. | | | 4-NEED RECORDED NOTICE OF COMMENCEMENT. | | | 5-STORM SHUTTERS: A)DRAWINGS NEED TO | | | HAVE ENGINEER'S SEAL AND SIGNATURE AS | | | REQUIRED BY DESIGNER ENGINEER ON NOTE | | | #6 ON PAGE 1 OF 9. | | | B)DRAWINGS DON'T MATCH THOSE REFERENCED | | | ON SBCCI REPORT. SEE NUMBER OF DWGS | | | AND LATEST REVISIONS. | | | **NOTE: THERE IS AN UPDATED SBCCI REPORT | | | #2229A. ALSO, GET MATCHING DRAWINGS. | | | C)CHECK THE DESIGN PRESSURES AND MAX./ | | | MIN. PANEL SPAN SHOWN ON INSTALLATION | | | SCHEDULE AND THOSE SHOWN ON ENGINEERED | | | DRAWINGS AND REVISE SCHEDULE AS REQ'D. | | | ALSO, CHECK ANCHOR SPACING. | | | | | | 6-A)PROVIDE PRODUCT APPROVAL FOR FRENCH | | | DOORS WITH SIDELITES AS SHOWN ON PLANS | | | B)RESUBMIT PRODUCT APPROVAL FOR SINGLE | | | HUNG WINDOWS WITH LEGIBLE DRAWINGS. | | | | | | 7-REVISE SPECIFICATIONS FOR INSTALLATION | | | OF METAL LATH AT PORCH CEILING. SEE | | | ASTM C-1063 FOR SIZE OF FASTENER | | | REQUIRED. NEED 1 3/4" PENETRATION TO | | | HORIZONTAL MEMBER AND 1 3/4" STAPLES | | | DON'T PROVIDE THIS REQUIREMENT. REVISE | | | SPECIFICATIONS AS REQUIRED. | | | 8-PROVIDE COMPLETE DETAIL AND FASTENERS | | | SPECIFICATIONS FOR INSTALLATION OF | | | AIR HANDLER UNIT HANGING FROM TRUSSES. | | | SEC. 104.2.1.2 CITY AMENDMENTS TO FBC. | | | 9-COMPLETE INFORMATION ON TOP OF THE | | | ENERGY CALCULATIONS. EG: OWNER. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2003-08-27 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2003-08-27 |
Time |
18:08 |
Rev Time |
0.33 |
| Received By |
btrobaug |
Date |
2003-08-27 |
Time |
18:02 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2003-06-19 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-08-27 |
Time |
15:36 |
Rev Time |
0.50 |
| Received By |
btrobaug |
Date |
2003-06-19 |
Time |
10:43 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2003-04-09 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2003-06-18 |
Time |
17:29 |
Rev Time |
0.25 |
| Received By |
dpalmer |
Date |
2003-04-09 |
Time |
03:29 |
Sent To |
P |
|
| Notes |
| 2003-04-09 00:00:00 | ********* NOTE ************ | | | | | | SUB PANEL SHOWS ALL GEN LT CIRCUITS AS | | | 60A AND #6 AWG.? | | | 15/20A #14/#12 AWG,,,,, | | | | | | | | | IF THERE ARE ANY QUESTIONS, PLEASE CALL. | | | | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW | | | 561-659-8096 EXT 8372 | | | [email protected] |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2003-08-27 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-08-27 |
Time |
15:31 |
Rev Time |
0.00 |
| Received By |
csiegber |
Date |
2003-08-27 |
Time |
15:31 |
Sent To |
E |
|
| Notes |
| 2003-08-27 00:00:00 | TO BT DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2003-06-26 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-06-26 |
Time |
08:36 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-06-26 |
Time |
08:36 |
Sent To |
B |
|
| Notes |
| 2003-06-26 00:00:00 | JGOMEZ DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2003-06-12 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-06-12 |
Time |
08:17 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-06-12 |
Time |
08:17 |
Sent To |
B |
|
| Notes |
| 2003-06-12 00:00:00 | JGOMEZ DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2003-05-09 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-05-09 |
Time |
16:14 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-05-09 |
Time |
16:14 |
Sent To |
B |
|
| Notes |
| 2003-05-09 00:00:00 | JGOMEZ DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2003-03-25 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-03-25 |
Time |
09:51 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2003-03-25 |
Time |
09:50 |
Sent To |
Z |
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
P |
Date |
2003-06-23 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2003-06-23 |
Time |
07:12 |
Rev Time |
0.25 |
| Received By |
pkrauss |
Date |
2003-06-23 |
Time |
07:12 |
Sent To |
B |
|
| Notes |
| 2003-06-23 00:00:00 | MECHANICAL PERMIT 03031954 | | | APPROVED 5-14-03, NO CHANGES WITH THIS | | | SUBMITTAL. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2003-05-15 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2003-06-21 |
Time |
07:15 |
Rev Time |
0.20 |
| Received By |
pkrauss |
Date |
2003-05-15 |
Time |
09:53 |
Sent To |
B |
|
| Notes |
| 2003-05-15 00:00:00 | MECHANICAL PERMIT 03031954 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2003-04-19 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2003-05-13 |
Time |
13:20 |
Rev Time |
0.50 |
| Received By |
jleech |
Date |
2003-04-19 |
Time |
06:53 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2003-09-06 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2003-09-06 |
Time |
18:56 |
Rev Time |
0.33 |
| Received By |
kstevens |
Date |
2003-09-06 |
Time |
18:56 |
Sent To |
B |
|
| Notes |
| 2003-09-06 00:00:00 | REVISION OK - SANT. RISER DIAGRAM - CHG. | | | LOCATION OF L/SINK |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2003-06-21 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2003-08-27 |
Time |
18:08 |
Rev Time |
0.25 |
| Received By |
jleech |
Date |
2003-06-21 |
Time |
07:15 |
Sent To |
M |
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2003-04-14 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2003-06-19 |
Time |
11:15 |
Rev Time |
0.50 |
| Received By |
jleech |
Date |
2003-04-14 |
Time |
18:54 |
Sent To |
M |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2003-04-03 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-03-25 |
Time |
09:51 |
Rev Time |
0.00 |
| Received By |
sgraham |
Date |
|
Time |
|
Sent To |
E |
|
| Notes |
|
|