Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-03-18 Cont ID  
Sent By hpiskura Date 2003-03-18 Time 14:57 Rev Time 0.00
Received By hpiskura Date 2003-03-14 Time 13:57 Sent To  
Notes
2003-03-18 00:00:00SPECIFICATIONS HAVE NOT BEEN PROVIDED
 FOR REVIEW.
  
 NOTE WHICH EIFS SYSTEM WILL BE USED AND
 PROVIDE AN EVALUATION REPORT FOR THE
 SYSTEM, FROM A RECOGNIZED CODE AGENCY.
  
 THE SKYLIGHTS AND ANY OTHER GLAZING
 LOCATED IN THE ROOF OR EXTERIOR WALLS
 MUST COMPLY WITH THE HURRICANE MISSILE
 IMPACT REQUIREMENTS OF FBC 1606.1.4.
  
 IF TEST OR ACCEPTANCE REPORTS ARE NOT
 INCLUDED WITH THIS PERMIT APPLICATION,
 SEPARATE PERMITS, FEES AND INFORMATION
 WILL BE REQUIRED FOR THE EXTERIOR
 WINDOWS, DOORS AND ROOF COVERING.
  
 BEFORE A PERMIT TO CONSTRUCT MAY BE
 ISSUED, IMPACT FEES MUST BE PAID TO
 PALM BEACH COUNTY, THE PERMIT PLANS
 STAMPED BY THAT OFFICE, AND A COPY OF
 THE PAID RECEIPT ATTACHED TO THE PERMIT
 APPLICATION.CALL 561-233-5025 FOR
 MORE INFORMATION.
  
 DUE TO THE SCOPE OF THIS PROJECT THE
 BUILDING OFFICIAL WILL REQUIRE A
 RESIDENT INSPECTOR FOR THE JOB.CALL
 DON NEELY AT 561-659-8096 EXT 8333 FOR
 MORE INFORMATION.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2003-03-20 Cont ID  
Sent By dpalmer Date 2003-03-14 Time 05:38 Rev Time 6.00
Received By dpalmer Date 2003-03-14 Time 05:15 Sent To  
Notes
2003-03-14 00:00:00*************** UNSAT ***************
  
 1)NOTE: PLEASE SHOW ALL CIRCUITING FOR
 BRANCH WIRING. NOTE MENTIONS SEE HEAD-
 BOARD DETAIL FOR CIRCUIT DETAIL? PLEASE
 CLARIFY WHERE THIS IS?
  
 2)NOTE: PLEASE SEE 220-13 FOR LOADING
 OF BRANCH CIRCUITS(KVA PER RECEPT)
 PLEASE SEE POWER SHEETS, PLEASE CLARIFY
 CIRCUITS WHICH SEEM TO EXCEED LOADING
 PERMITTED IN NEC. SOME ARE SHOWN WITH
 MORETHAN ONE CIRCUIT? PLEASE EITHER NOTE
 ON PLANS: MAX # PERMITTED OR PLEASE
 DIVIDE CIRCUITS.
  
 3)NOTE: PLEASE CLARIFY RECEPTS REQ`D FOR
 ROOFTOP EQUIPMENT. 210-63
  
 4)NOTE: PLEASE SEE DETAILS SHOWN FOR
 GROUNDING, PLEASE NOTE, CODES SHOWN ARE
 FROM "96" NEC. WE ARE CURRENTLY UNDER
 THE 99 NEC. PLEASE CORRELATE.
 PLEASE ALSO SHOW COLD WATER PIPE AS
 PART OF THE GROUNDING ELECTRODE SYSTEM.
 250-50/250-32
  
 5)NOTE: PLEASE SEE 225-31 FOR MEANS OF
 DISCONNECT REQ`D COMING FROM GENERATOR
 TO MAIN BLDG. PLEASE SEE 230-76/ 230-79
 FOR DISCONNECTING REQUIREMENTS. PLEASE
 NOTE, THAT SHUNT TRIPS WILL NOT BE
 PERMITTED BY THE AHJ.
 PLEASE ALSO PROVIDE INFORMATION WHERE
 2HR FIRE RATED SEPARATION FORM EXISTING
 BLDG W/ EXISTING ELECTRICAL SERVICE
 IS FED FROM. PLEASE NOTE COMPLETE
 SEPARATION OF THESE NEW AND OLD WILL BE
 REQ`D DUE TO FACT THEY ARE FED FROM TWO
 SEPARATE ELECTRICAL SERVICES. PLEASE
 ALSO NOTE, LABELING AND COMPLETE SIGNAGE
 WILL BE REQ`D W/ A MIN OF 1" LETTERING
 ON A CONTRASTING BACKGROUND.
  
 6)NOTE: PLEASE ALSO SEE 96 NEC REF
 ON LINE DIAGRAM.
  
 7)NOTE: PLEASE SEE SIZING SHOWN FOR
 TRANSFER SWITCH "LS", MISPRINT AT 260A`S
  
 8)NOTE: PLEASE CLARIFY 3000A SWITCHBOARD
 W/TWO 1600A MAINS? 3200A? PLEASE CLARIFY
 HOW MAINS CNA EXCEED RATING OF SWITCH-
 -BOARD?
  
 9)NOTE: PLEASE CORRELATE RISER DIAGRAM
 AND SW BRD ES-1. CRBR SHOWS 600A ON
 RISER AND 800A ON PANEL SCHEDULE.
  
 10)NOTE: PLEASE COMPLETE RISER DIAGRAM
 W/ ALL CONDUIT AND WIRE SIZES. PLEASE
 SUBMIT A FEEDER SCHEDULE, SEEMS TO HAVE
 #`S ON RISER?? SUBMIT ALL WIRE SIZES ON
 PANEL SCHEDULES ALSO.
 11)NOTE: PLEASE COMPLETE LOAD CALCULAT-
 -IONS. PLEASE SHOW FINAL AMPERAGE ON
 EACH PANEL AND ON MAIN SERVICE.
 PLEASE SHOW LOAD CALC PER 220-3,220-10
 220-11,220-13, PLEASE ALSO SHOW ALL
 CONTINUOUS LOADS AT 125% 215-3/230-42ETC
  
 12)NOTE: PLEASE PROVIDE GROUNDING FOR
 ALL TRANSFORMERS PER 250-30
 PLEASE SHOW DETAIL.
  
 13)NOTE: PLEASE SEE RISER DIAGRAM,
 1CHEM1, SHOWS THREE TRANSFORMERS FEEDING
 TWO PANELS? 2-45 KVA'S AND ONE 75KVA TO
 THE SAME PANEL? PLEASE CLARFIY HOW TWO
 X-FORMERS ARE FEEDING ONE PANEL. PLEASE
 ALSO CLARIFY PANEL SCHEDULE.
  
 14)NOTE: PLEASE SUBMIT ALL PANEL
 SCHEDULES, SOME ARE MISSING.
  
 15)NOTE: PLEASE SEE PANEL 1 ELEM1, OTHER
 PANSL SHOWN ON SECONDARY SIDE OF X-FORM-
 -ERS ? 240-21/384-16
  
 PLEASE NOTE A COMPLETE PLAN REVIEW CAN
 NOT BE DONE AT THIS TIME. PLEASE SUBMIT
 THE ABOVE INFORMATION FOR REVIEW AND
 PLEASE ALSO NOTE THERE MAY BE FURTHER
 COMMENTS AFTER INFORMATION FOR REVIEW
 IS SUBMITTED.
  
 IF THERE ARE ANY QUESTIONS, PLEASE CALL.
  
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-659-8096 EXT 8372
  
 PLEASE NOTE, IN ADDTION TO ABOVE COMMENT
 -S , PLEASE ALSO SEE 571-17 FOR GFI
 PROTECTION.

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2003-05-06 Cont ID  
Sent By nmccray Date 2003-05-06 Time 14:37 Rev Time 0.00
Received By nmccray Date 2003-05-06 Time 14:37 Sent To  
Notes
2003-05-06 00:00:001) PLEASE PROVIDE LIFE SAFETY PLAN WITH
 REGARDS TO EXITING AND TRAVEL DISTANCES
 FOR REVIEW.
  
 2) PLEASE PROVIDE INTERIOR FINISH
 CLASSIFICATION.
  
 3) SEPARATE PLANS AND PERMITS ARE
 REQUIRED FOR FIRE SPRINKLER AND FIRE
 ALARM SYSTEM.
  
 NATE MCCRAY, CAPTAIN
 659-8096, EXT 8497
 835-2910

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-02-20 Cont ID  
Sent By sgraham Date 2003-02-24 Time 13:45 Rev Time 0.00
Received By dpalmer Date 2003-02-20 Time 10:13 Sent To  
Notes
2003-02-20 00:00:00TO COMM BOARD #22, PLANS ARE ON SHELF
 #5 ON RACK NEXT TO CONFERENCE ROOM.
 W/ FOUNDATION PLAN.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2003-05-08 Cont ID  
Sent By jleech Date 2003-04-26 Time 12:37 Rev Time 8.30
Received By pkrauss Date 2003-03-17 Time 13:30 Sent To  
Notes
2003-03-17 00:00:00PLEASE CLARIFY THE FOLLOWING INFORMATION
  
 1.TEMPORARY CORRIDOR INDICATED ON PLAN
 SHEET A0.10INDICATES THE DOORS ARE
 60 MIN. INDICATE WHAT PARTITION RATING
 IS TO BE.WILL THIS BE UTILIZED DURNING
 THE DEMO/RECONSTRUCTION OF PHASE 9 & 10?
 FIRE OR FIRE SMOKE DAMPERS REQUIRED
 WHILE THIS CORRIDOR IS IN USE.
  
 2.PLEASE CLARIFY ALL SMOKE, FIRE OR
 COMBINATION DAMPERS ON THE PLAN WHETHER
 TEMPORARY OR PERMANENT.
  
 3.MECH ROOM IN WHICH CH-3 IS TO BE
 INSTALLED.VENTILATION, DETECTORS,
 ALARMS, BREATHING APPERATUS OUTSIDE
 ENTRANCE TO MECH RM TO BE BROUGHT UP TO
 CODE.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT (561) 805-6719.

Review Stop MEDGAS MEDICAL GAS
Rev No 1 Status P Date 2003-04-26 Cont ID  
Sent By jleech Date 2003-04-26 Time 12:37 Rev Time 6.00
Received By jleech Date 2003-04-26 Time 12:37 Sent To M
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2003-04-19 Cont ID  
Sent By kstevens Date 2003-04-19 Time 15:28 Rev Time 6.00
Received By kstevens Date 2003-04-19 Time 15:27 Sent To  
Notes
2003-04-19 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
  
 1) ALL DEMO'D AND CAPPED PIPES SHALL BE
 INSPECTED PRIOR TO COVERING.
 2) SHT P2.09A PLEASE IDENTIFY VALVES ON
 HOT WATER CIRCULATING LINE, NOT FOUND
 ON PLUMBING LEGEND - SHT P0.01
 3) SHTS P2.10B, P2.10C, & P5.04, OVER-
 FLOW DRAIN AT COL'S 18/U MINIMUM 8" REQD
 @ 2975 SQ FT. EXTEND CONNECTION TO 2ND
 OVERFLOW DRAIN AND INCREASE PIPE SIZE TO
 8". TABLE 1106.3 - SECTION 1107.3
 4) SHT P2.10B 4" W & T AT CLASSROOM
 1-350 APPEARS TO DRAIN TO 6" R.W.L.
 PLEASE CLAIRFY. PLEASE INDICATE WHAT
 THIS SYSTEM DRAINS.
 5) SHTS P4.01 & P5.04 CONDENSATE SHALL
 DRAIN TO FLOOR SINKS. SECTION 803.2
 HUB DRAINS NOT APPROVED.
 6) SHTS P2.10CU & P5.01 ICE DISPENSORS
 #095895, & # 203201 SHALL DRAIN INDIREC-
 TLY INTO A FLOOR SINK. SECTION 802.3.
 7) SHT P5.01 CLINICAL SINK, P-7A, PLEASE
 CLAIRFY IF THESE SINKS HAVE INTERNAL
 TRAPS OR NOT. NONE ARE SHOWN ON RISER.
 8) SHTS P2.11 & P5.01 SINKS P20B SHOW
 2" SANT ON FLOOR PLAN BUT 3" PIPE ON
 SANT. RISER. PLEASE CLAIRFY.
 9) SHT P5.04 PHASE 10 PART B EXISTING 2"
 ROOF DRAIN. PLEASE PROVIDE SQ. FOOTAGE
 DRAINED BY THIS DRAIN PER SEC 1106.
 10) SHT P5.04 - THE FOLLOWING INFORMAT-
 ION IS REQUIRED FOR GAS PERMIT.
 A. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2001
 FUEL GAS CODE. - PLEASE PROVIDE LENGTHS
 FOR SYSTEM AFTER REGULATOR.
 B. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED.
 C. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2001 FUEL GAS CODE SECS. 401.8
 THRU 402.5.2 AND TABLES 402(1) THRU
 402(34). PLEASE PROVIDE BTU'S ANTICIPAT-
 ED FOR FUTURE USE.
 D. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2001 FUEL GAS CODE SEC. 402.2.
 PLEASE INDICATE PRESSURE FOR SYSTEM
 AFTER REGULATOR.
 E. SUBMIT A DETAIL SHOWING THE TYPE,
 LOCATION, SIZE AND TERMINATION OF THE
 GAS VENTS PER FBC-2001 FUEL GAS CODE
 SECS. 502 THRU 506.
 F. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2001 FUEL GAS CODE SEC 402.2
 G) PLEASE INDICATE TABLE IN FBC-2001
 FUEL GAS CODE THAT IS BEING USED TO
 SIZE PIPE FOR HIGH PRESSURE & MEDIUM
 PRESSURE SYSTEMS.
 11) SHT P6.01 FILM PROCESOR DETAIL, PER
 SECTION 803.3 A FLOOR SINK WILL BE RE-
 QUIRED FOR INDIRECT WASTE. FLOOR DRAINS
 ARE NOT AN APPROVED RECEPTOR.
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377
 (561) 805-6721
 FAX (561) 653-2692

Review Stop Z ZONING
Rev No 1 Status P Date 2003-02-24 Cont ID  
Sent By sgraham Date 2003-02-24 Time 13:45 Rev Time 0.00
Received By sgraham Date   Time   Sent To I
Notes
***NONE***