Plan Review Details - Permit 03021008
Plan Review Stops For Permit 03021008
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2003-04-24 Cont ID  
Sent By pkrauss Date 2003-04-24 Time 10:53 Rev Time 1.00
Received By rmcdouga Date 2003-04-24 Time 09:14 Sent To  
Notes
2003-04-24 00:00:00DATE STAMP PLANS, PRODUCT APPROVAL FOR
 SINGLE OUTSWING DOOR WITH SIDELITE IS
 OK (PROVISO ITEM #1)

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-04-04 Cont ID  
Sent By pkrauss Date 2003-04-24 Time 08:07 Rev Time 3.00
Received By rmcdouga Date 2003-04-04 Time 09:47 Sent To M
Notes
2003-04-04 00:00:00BUILDING PROVISO
  
 1)PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR SINGLE OUTSWING DOOR WITH
 SIDELITES. SITE SPECIFIC ENGINEERING CAN
 BE SUBMITTED.
  
 2) SIGNED (WET SIGNATURE), SEALED AND
 DATED TRUSS LAYOUT AND DRAWINGS ARE
 REQUIRED TO BE GIVEN TO THE FIELD
 INSPECTOR AT TIME OF ROOF FRAMING
 INSPECTION.
  
 3) NO C.O. WILL BE ISSUED UNTIL RECORDED
 COPY OF COVENANTS SPECIFYING AN EGRESS
 EASEMENT IS SUBMITTED AND APPROVED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-03-12 Cont ID  
Sent By shernand Date 2003-04-03 Time 13:16 Rev Time 5.00
Received By rmcdouga Date 2003-03-12 Time 11:35 Sent To  
Notes
2003-03-12 00:00:00DENIED
  
 1) ONE HOUR FIRE RATED GLASS BLOCK IS
 REQUIRED IN THE WALL ON THE ZERO LOT
 LINE. INDICATE THIS ON THE PLANS.
  
 2) THE GLASS BLOCK LOCATED WITHIN 3 FEET
 HORIZONTALLY OF THE TUB/SHOWER IS
 REQUIRED TO HAVE A MINIMUM UNIFORM FACE
 THICKNESS OF 0.25" PER FBC 2405.2.2(5).
 PLEASE INDICATE THIS ON PLAN.
  
 3) WIRE MESH IS REQUIRED TO BE SUPPORTED
 ON APPROVED MATERIALS AT MAXIMUM 3 FEET
 ON CENTER PER FBC 1909.3.
  
 4) THE WIRE LATH NOTES ON A6 ARE NOT
 CORRECT. HIGH RIB METAL LATH IS REQUIRED
 TO BE ATTACHED AT EACH RIB (4"OC) AND
 SHALL BE ATTACHED TO HORIZONTAL WOOD
 FRAMING MEMBERS WITH NAILS OR STAPLES
 PROVIDING AT LEAST 1-3/4" PENETRATION
 INTO FRAMING MEMBERS. SEE ASTM C 1063.
  
 5) FBC 1707.4.4.2 REQUIRES WOOD BUCKS
 1-1/2" THICK AND GREATER TO EXTEND TO
 THE INTERIOR FACE OF THE JAMB. PLEASE
 REVISE SWING DOOR BUCK DETAIL ON AS2.
  
 6) SPECIFY THE REQUIRED EMBED DEPTH OF
 THE 1/2" J-BOLT FOR THE USP NFM
 CONNECTORS ON A5.
  
 7) PROVIDE THE MANUFACTURER'S SPECS. AND
 UL LISTING INFORMATION FOR A ONE HOUR
 FIRE RATED GLASS BLOCK ASSEMBLY.
  
 8) THE TRUSS LAYOUT IS REQUIRED TO BE
 SIGNED, SEALED AND DATED BY THE TRUSS
 ENGINEER. THE COVER SHEET FOR THE TRUSS
 DRAWINGS REQUIRES THE ORIGINAL SIGNATURE
 OF THE TRUSS ENGINEER. A SIGNATURE
 STAMP IS NOT ACCEPTABLE. FAC 61G15-35
  
 9) AN EGRESS EASEMENT IS REQUIRED ON THE
 ZERO LOT LINE SIDE OF THE STRUCTURE
 FROM THE EGRESS OPENING TO THE PUBLIC
 WAY.
  
 10) SEVERAL TRUSS CONNECTORS LISTED ON
 A5 ARE NOT ADEQUATE FOR THE UPLIFT LOADS
 ON THE TRUSS DRAWINGS. TRUSSES H73, H81,
 H115, H95, H101, H113, ETC. PLEASE
 REVIEW THE REQUIRED UPLIFTS ON THE TRUSS
 DRAWINGS AND REVISE THE SPECIFIED
 CONNECTORS.
 NOTE: THE TRUSS PLANS ARE NO LONGER
 REQUIRED TO BE SUBMITTED FOR PLAN REVIEW
 THEY ARE REQUIRED TO BE GIVEN TO THE
 BUILDING INSPECTOR AT THE ROOF FRAMING
 INSPECTION.
  
 11) THE KEY PLAN INDICATES OPENING #5 AT
 THE WRONG LOCATION. PLEASE CORRECT.
  
 12) PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR THE SINGLE OUTSWING DOOR
 WITH SIDELITES (FRONT DOOR).
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)659-8096 EXT.8202

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2004-02-05 Cont ID  
Sent By btrobaug Date 2004-02-05 Time 10:46 Rev Time 0.50
Received By btrobaug Date 2004-02-05 Time 09:37 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-04-08 Cont ID  
Sent By csiegber Date 2004-02-03 Time 16:33 Rev Time 0.75
Received By btrobaug Date 2003-04-08 Time 08:46 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-03-07 Cont ID  
Sent By jleech Date 2003-03-04 Time 17:07 Rev Time 0.50
Received By btrobaug Date 2003-03-07 Time 08:28 Sent To B
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2004-02-03 Cont ID  
Sent By csiegber Date 2004-02-03 Time 16:33 Rev Time 0.00
Received By csiegber Date 2004-02-03 Time 16:33 Sent To E
Notes
2004-02-03 00:00:00TO BT DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-11-05 Cont ID  
Sent By csiegber Date 2003-11-05 Time 15:30 Rev Time 0.00
Received By csiegber Date 2003-11-05 Time 15:30 Sent To M
Notes
2003-11-05 00:00:00TO PK BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-04-14 Cont ID  
Sent By shernand Date 2003-04-14 Time 14:03 Rev Time 0.00
Received By shernand Date 2003-04-14 Time 14:03 Sent To P
Notes
2003-04-14 00:00:00KSTEVENS DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-04-03 Cont ID  
Sent By shernand Date 2003-04-03 Time 13:15 Rev Time 0.00
Received By shernand Date 2003-04-03 Time 13:15 Sent To B
Notes
2003-04-03 00:00:00RM DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-02-13 Cont ID  
Sent By dpalmer Date 2003-02-13 Time 14:56 Rev Time 0.00
Received By dpalmer Date 2003-02-13 Time 14:56 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 5 Status P Date 2003-11-07 Cont ID  
Sent By pkrauss Date 2003-11-07 Time 16:09 Rev Time 0.33
Received By pkrauss Date 2003-11-07 Time 15:41 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 4 Status P Date 2003-04-24 Cont ID  
Sent By csiegber Date 2003-11-05 Time 15:30 Rev Time 0.30
Received By pkrauss Date 2003-04-24 Time 08:02 Sent To B
Notes
2003-04-24 00:00:00CONTRACTOR BROUGHT CORRECT PLAN IN.

Review Stop M MECHANICAL (A/C)
Rev No 3 Status F Date 2003-04-04 Cont ID  
Sent By kstevens Date 2003-04-17 Time 10:02 Rev Time 0.30
Received By pkrauss Date 2003-04-04 Time 11:29 Sent To B
Notes
2003-04-04 00:00:00DENIED:MECHANICAL PERMIT 03021011
 2ND REQUEST
 ENERGY CALCS & PERFORMANCE LEVEL DISPLAY
 CARD INDICATE 13 SEER PLANS REFLECT 12
 SEER.PLEASE CORRELATE.
  
 DUCT LAYOUT APPROVED.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT 659-8096
 EXT. 8388.

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2003-03-12 Cont ID  
Sent By pkrauss Date 2003-03-12 Time 14:21 Rev Time 0.35
Received By pkrauss Date 2003-03-12 Time 14:10 Sent To  
Notes
2003-03-12 00:00:00DENIED:MECHANICAL PERMIT 03021011
  
 1.ENERGY CALCULATIONS INDICATE A 13
 SEER UNIT PLANS INDICATE TWO 12 SEER
 UNITS.
  
 2.ONLY ONE UNIT SUBMITTED UNDER THE
 MANUAL J CALCULATIONS (TOTAL OF 47,726
 BTU'S), ENERGY CALCS INDICATE 80,000
 BTU'S.PLAN INDICATES 2 UNITS.
  
 PLEASE CORRECT AND RESUBMIT.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT 659-8096
 EXT. 8388.
 PLEASE NOTE, THIS WAS NOT A RESUB, PLANS
 MECH PLANS WERE OVERLOOKED

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2003-03-04 Cont ID  
Sent By jleech Date 2003-03-01 Time 10:04 Rev Time 0.25
Received By jleech Date 2003-03-04 Time 17:07 Sent To E
Notes
2003-03-04 00:00:00NO A/C PLAN.

Review Stop P PLUMBING
Rev No 3 Status P Date 2003-04-17 Cont ID  
Sent By kstevens Date 2003-04-17 Time 10:02 Rev Time 0.33
Received By kstevens Date 2003-04-17 Time 10:02 Sent To M
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2003-04-04 Cont ID  
Sent By shernand Date 2003-04-14 Time 14:03 Rev Time 0.50
Received By kstevens Date 2003-04-04 Time 14:00 Sent To  
Notes
2003-04-04 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
  
 1) SHT A6 SANITARY RISER DIAGRAM DOES
 NOT MEET CODE REQUIREMENTS OR REFLECT
 THE FLOOR PLAN.
 2) LAUNDRY TRAY AND WASH MACHINE CAN NOT
 DRAIN INTO THE SAME STACK AS BATH #2 LAV
 THEY ARE NOT ON A COMMON WALL.
 3) WASH MACHINE SHALL DRAIN DOWNSTREAM
 FROM THE LAUNDRY TRAY NOT ABOVE. A CLEAN
 OUT IS REQUIRED ON THE LAUNDRY STACK MIN
 OF 4' AFF.
 4) TUBS IN MASTER BATH AND BATH #2 SHALL
 NOT BE TAKEN OFF ABOVE THE SLAB AS SHOWN
 5) SHOWERS IN MASTER BATH, BATH #3, AND
 CABANA BATH SHALL NOT BE TAKEN OFF ABOVE
 THE SLAB AS SHOWN.
 6) BIDET IN MASTER BATH SHALL NOT BE
 TAKEN OFF ABOVE THE SLAB AS SHOWN.
 7) SIZE ALL SECTIONS OF PIPE.
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-03-01 Cont ID  
Sent By sgraham Date 2003-02-19 Time 14:17 Rev Time 0.33
Received By jleech Date 2003-03-01 Time 10:04 Sent To M
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-02-19 Cont ID  
Sent By dpalmer Date 2003-02-13 Time 14:57 Rev Time 0.00
Received By sgraham Date   Time   Sent To P
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved