Plan Review Details - Permit 03020457
Plan Review Stops For Permit 03020457
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-03-20 Cont ID  
Sent By shernand Date 2003-05-20 Time 16:47 Rev Time 4.00
Received By rmcdouga Date 2003-03-20 Time 15:28 Sent To  
Notes
2003-03-20 00:00:00PROVISO
  
 1) SUBMIT SOIL BORING TEST REPORT PRIOR
 TO POURING FOUNDATION.
  
 2) SUBMIT PRODUCT APPROVALS FOR OVAL
 FIXED GLASS WINDOWS AND FRENCH DOORS.
  
 3) SUBMIT SBCCI NOA THAT ACCOMPANIES THE
 DRAWINGS THAT WERE SUBMITTED. SUBMIT
 REVISED STORM PANEL SCHEDULE WITH
 OPENING SIZES THAT MATCH THE PLANS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-03-03 Cont ID  
Sent By sthyng Date 2003-03-19 Time 09:07 Rev Time 4.00
Received By rmcdouga Date 2003-02-28 Time 17:16 Sent To  
Notes
2003-02-28 00:00:00BUILDING DENIED
  
 1) IMPACT FEES MUST BE PAID TO PALM
 BEACH COUNTY, PLANS STAMPED BY THEM AND
 COPY OF RECEIPT SUBMITTED TO CITY OF
 WEST PALM BEACH BUILDING DEPARTMENT,
 BEFORE A BUILDING PERMIT CAN BE ISSUED.
  
 2) IMPACT FEES MUST BE PAID TO PALM
 BEACH COUNTY, PLANS STAMPED BY THEM AND
 COPY OF RECEIPT SUBMITTED TO CITY OF
 WEST PALM BEACH BUILDING DEPARTMENT,
 BEFORE A BUILDING PERMIT CAN BE ISSUED.
  
 3) PROVIDE A SOIL BORING TEST REPORT AS
 REQUIRED BY FBC 1804.1.1.
  
 4) PLEASE REVISE #1 UNDER GENERAL NOTES
 ON C-1. THE CONSTRUCTION IS TYPE VI.
  
 5) INDICATE THE INTERNAL PRESSURE
 COEFFICENT ON C-1 WITH THE DESIGN
 CRITERIA. SEE FBC 1606.1.7.
  
 6) THE CONNECTION DETAIL 7 ON A-6 IS
 MISLABELED AS 1 ON A-6. PLEASE CORRECT.
  
 7) THE NOTE ON THE BOLLARD ON A-2 REFERS
 TO DETAIL #54. THIS DETAIL DOES NOT
 APPEAR TO BE ON THE PLANS.
  
 8) THE ENERGY CALCULATIONS INCORRECTLY
 LIST THE EXTERIOR WALLS AS WOOD FRAME.
  
 9) SPECIFY THAT THE DOOR BETWEEN THE
 GARAGE AND THE CONDITIONED SPACE IS A
 SOLID CORE OR INSULATED STEEL DOOR.
  
 10) INDICATE ON THE PLANS THAT THE WALL
 BETWEEN THE GARAGE AND THE CONDITIONED
 SPACE IS INSULATED.
  
 11) THE DETAILS ON SHEET A4 ARE LABELED
 INCORRECTLY.
  
 12) THERE ARE TWO DIFFERENT SHEETS OF
 DRAWINGS MARKED A4. PLEASE CORRECT.
  
 13) THE FRONT ELEVATION SHOWS TWO OVAL
 WINDOWS AT THE DEN AND THE FLOOR PLANS
 INDICATE SINGLE HUNG WINDOWS. PLEASE
 CORRECT.
  
 14) REVISE THE SLIDING GLASS DOOR DETAIL
 ON A4 TO INDICATE THAT THE ANCHORS ARE
 REQUIRED TO BE FASTENED THROUGH BUCKS
 LESS THAN 1-1/2" THICK AND INTO THE
 CONCRETE SUBSTRATE. SEE FBC 1707.4.4.2.
  
 14) THE INSTALLATION SCHEDULE AND KEY
 PLAN FOR THE STORM PANELS DOES NOT
 CORRESPOND WITH THE PLANS. PLEASE REVISE
  
 15) PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR:
 - SINGLE FRENCH DOOR
 - GLASS BLOCK (THE ONE SUBMITTED IS A
 PRELIMINARY NOA)
  
 16) PROVIDE THE MANUFACTURER'S SPECS.
 AND UL LISTING FOR THE ONE HOUR FIRE
 RATED GLASS BLOCK ASSEMBLY.
  
 18) THE OPENING SIZE INDICATED ON THE
 PLANS FOR THE GLASS BLOCK EXCEEDS THE
 MAXIMUM OPENING SIZE ALLOWED BY THE
 PRODUCT APPROVAL. PLEASE CORRECT.
  
 19) ONE OF THE PAGES OF THE DRAWINGS IS
 MISSING FROM THE PRODUCT APPROVAL FOR
 THE SINGLE HUNG WINDOWS.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)659-8096 EXT.8202

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-07-08 Cont ID  
Sent By btrobaug Date 2003-07-08 Time 09:03 Rev Time 0.50
Received By btrobaug Date 2003-07-08 Time 08:17 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-02-24 Cont ID  
Sent By shernand Date 2003-07-07 Time 16:40 Rev Time 0.50
Received By btrobaug Date 2003-02-24 Time 17:02 Sent To B
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-07-07 Cont ID  
Sent By shernand Date 2003-07-07 Time 16:40 Rev Time 0.00
Received By shernand Date 2003-07-07 Time 16:40 Sent To E
Notes
2003-07-07 00:00:00BT DESK

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-05-20 Cont ID  
Sent By shernand Date 2003-05-20 Time 16:47 Rev Time 0.00
Received By shernand Date 2003-05-20 Time 16:47 Sent To B
Notes
2003-05-20 00:00:00RM DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-03-19 Cont ID  
Sent By sthyng Date 2003-03-19 Time 09:07 Rev Time 0.00
Received By sthyng Date 2003-03-19 Time 09:07 Sent To B
Notes
2003-03-19 00:00:00TO RM DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-02-10 Cont ID  
Sent By dpalmer Date 2003-02-10 Time 10:46 Rev Time 0.00
Received By dpalmer Date 2003-02-10 Time 10:46 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-02-22 Cont ID  
Sent By jleech Date 2003-02-19 Time 18:17 Rev Time 0.25
Received By hmoser Date 2003-02-22 Time 11:53 Sent To E
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-02-19 Cont ID  
Sent By sgraham Date 2003-02-11 Time 07:48 Rev Time 0.33
Received By jleech Date 2003-02-19 Time 18:17 Sent To M
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-02-11 Cont ID  
Sent By dpalmer Date 2003-02-10 Time 10:46 Rev Time 0.00
Received By sgraham Date   Time   Sent To P
Notes
***NONE***