| 2003-02-04 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 424.2 SWIMMING POOLS |
| | |
| | A) PLEASE ADJUST YOUR NOTES, DETAILS, OR |
| | SUBMITTALS TO REFLECT THE FOLLOWING IN- |
| | FORMATION REQUIRED FOR PLAN REVIEW |
| | 1) FBC-2001 SEC 424.2.6.1 ENGINEERING |
| | DESIGN, CONSTRUCTION AND WORKMANSHIP. |
| | ANSI/NSPI-4 92, AND NSPI-5. (ADD TO |
| | NOTES) |
| | 2) FBC-2001424.2.6.6.5 WHERE PROVIDED, |
| | THE VACUUM OR PRESSURE CLEANER FITTING |
| | SHALL BE LOCATED AT LEAST 6" AND NOT |
| | GREATER THAN 12" BELOW THE MINIMUM OPER- |
| | ATING WATER LEVEL OR AS AN ATTACHMENT TO |
| | THE SKIMMER. |
| | 3) FBC-2001 424.2.14.2 WATER RETENTION, |
| | PROVIDE A POSITIVE MEANS OF RETAINING |
| | WATER IN THE HEATER WHEN PUMP IS SHUT |
| | OFF. (MANUFACTURE CUT SHEETS SUBMITTAL) |
| | 4) POOL LAYOUT SHEET SHOWS VAC LINE, BUT |
| | SPECIFICATIONS SAYS NO VACUUM. PLEASE |
| | CLAIRFY. |
| | 5) TWO PIPING SCHEMATIC SHOWN. ONE SHOWS |
| | A PUMP WITH BLOWER PICKING UP MAIN DRAIN |
| | AND RETURNING TO SPA. THE OTHER SHOWS |
| | A PUMP WITH TWO SETS OF MAIN DRAINS. |
| | IS THERE TWO PUMPS?? PLEASE CLAIRFY. |
| | PLEASE SUBMIT ONE SCHEMATIC WILL ALL |
| | PIPING AND PUMPS AND NOT NUMERIOUS PIP- |
| | ING SCHEMATICS. |
| | 6) ALL CHANGES TO A SIGNED AND SEALED |
| | SET OF PLANS SHALL BE INITIALED AND |
| | DATED BY ENGINEER OF RECORD OR NEW SHEET |
| | SUBMITTED. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 659-8096 EXT 8377 |