Plan Review Details - Permit 03011742
Plan Review Stops For Permit 03011742
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2003-02-10 Cont ID  
Sent By hpiskura Date 2003-02-10 Time 13:48 Rev Time 0.00
Received By hpiskura Date 2003-02-10 Time 11:04 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-02-10 Cont ID  
Sent By dpalmer Date 2003-02-10 Time 06:13 Rev Time 0.50
Received By dpalmer Date 2003-02-10 Time 06:13 Sent To  
Notes
2003-02-10 00:00:00NOTES REDLINED ON PLANS FOR CIRCUITS
 8&10. CORRELATE OCP/KW/AWG.
  
 IF THERE ARE ANY QUESTIONS, PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-659-8096

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2003-02-07 Cont ID  
Sent By mcarsill Date 2003-02-07 Time 12:07 Rev Time 0.00
Received By mcarsill Date 2003-02-07 Time 12:07 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-03-13 Cont ID  
Sent By sthyng Date 2003-03-13 Time 15:35 Rev Time 0.00
Received By sthyng Date 2003-03-13 Time 15:35 Sent To P
Notes
2003-03-13 00:00:00ADD THERMOSTATIC MIXING VALVE, HANDICAP
 FOUNTAIN, WATER HEATER

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-02-25 Cont ID  
Sent By dpalmer Date 2003-02-25 Time 09:58 Rev Time 0.00
Received By dpalmer Date 2003-02-25 Time 09:58 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-01-27 Cont ID  
Sent By dpalmer Date 2003-01-27 Time 15:09 Rev Time 0.00
Received By dpalmer Date 2003-01-27 Time 15:09 Sent To  
Notes
2003-01-27 00:00:00TO COMM BOARD #23

Review Stop M MECHANICAL (A/C)
Rev No 2 Status   Date 2003-05-24 Cont ID  
Sent By pkrauss Date 2003-05-24 Time 07:56 Rev Time 0.40
Received By pkrauss Date 2003-05-24 Time 07:56 Sent To  
Notes
2003-05-24 00:00:00AS PER OUR CONVERSATION - 8" B VENT IS
 FOR "HEAT REMOVAL" FROM THE BAKERY OVEN,
 REVISION APPLICATION INDICATES THIS IS
 AN 8" "FLUE VENT".PLEASE CLARIFY -
 HEAT HOOD & FLUE VENT ARE TWO DIFFERENT
 ANIMALS.8" FLUE INDICATES GAS AND HAS
 DIFFERENT REQUIREMENTS THAN DUCT FOR
 A HEAT HOOD.
  
 PLANS ORIGINALLY SUBMITTED ARE STAMPED
 BY ENGINEER, I WAS NOT INFORMED OF THIS
 DURING OUR CONVERSATION.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-02-10 Cont ID  
Sent By pkrauss Date 2003-02-10 Time 08:55 Rev Time 0.40
Received By pkrauss Date 2003-02-10 Time 08:26 Sent To  
Notes
2003-02-10 00:00:00PROVISO:
  
 AS PER 2001 FBC(M) 501.2, EXHAUST
 SYSTEMS FROM BATH, TOILET, OR URINAL
 SHALL BE INDEPENDENT OF OTHER EXHAUST
 SYSTEMS.CLARIFY EXHAUST TERMINATION
 OF THE STEAM/TOILET EXHAUST SYSTEMS
 SHOWN ON PLAN SHEET M-1.
  
 ADDITIONAL PERMITS REQUIRED FOR HOOD,
 FIRE SUPRESSION, AND WALK-IN COOLERS.
 PLEASE PROVIDE PLANS & MANUFACTURERS
 INSTALLATION INSTRUCTIONS WITH PERMIT
 APPLICATION.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT 659-8096
 EXT. 8388.

Review Stop P PLUMBING
Rev No 3 Status F Date 2003-03-14 Cont ID  
Sent By kstevens Date 2003-03-14 Time 16:38 Rev Time 0.75
Received By kstevens Date 2003-03-14 Time 16:38 Sent To  
Notes
2003-03-14 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
  
 1) PLEASE SUBMIT A CHANGE FOR THE SANT.
 RISER DIAGRAM.
 2) SEEMS TO BE A HORIZONTAL DRY VENT AT
 THE FLOOR SINK NEXT TO THE WATER HEATER.
 FLOOR SINK SHOULD BE TAKEN OFF ON THE
 RISE.
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377

Review Stop P PLUMBING
Rev No 2 Status P Date 2003-03-03 Cont ID  
Sent By sthyng Date 2003-03-13 Time 15:35 Rev Time 1.50
Received By kstevens Date 2003-03-01 Time 15:01 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2003-01-31 Cont ID  
Sent By dpalmer Date 2003-02-25 Time 09:58 Rev Time 1.00
Received By kstevens Date 2003-01-31 Time 18:00 Sent To  
Notes
2003-01-31 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
 FBC-2001 CHAPTER 11
  
 1) GREASE TRAP SHALL BE SIZED BY RODNEY
 COMPO, ENVIRONMENTAL COMPLIANCE (561)
 837-4074 PER WASTE ORD. #2938-96
 2) SHT P-1 ALL SINKS IN A FOOD PREP AREA
 SHALL DRAIN INDIRECTLY INTO A FLOOR SINK
 EXCEPT HAND SINKS.
 3) SHTS P-1/P-2 WHAT WILL THE FLOOR
 TROUGH BE USED TO DRAIN? ALL INDIRECT
 WASTE (CONDENSATE) SHALL DRAIN TO A F.S.
 4) SHT P-2 WATER RISER, A WATER HAMMER
 ARRESTOR IS REQUIRED AT THE ICE MACHINE.
 SEC 604.9
 5) SHT P-2 GREASE RISER, JANITOR SINK
 NOT SHOWN ON RISER.
 6) SHT P-2 WATER HEATER DETAIL, FLOOR
 SINK IS REQUIRED FOR PAN DRAIN AND P/T
 DISCHARGE.
 7) FOLLOWING INFORMATION REQUIRED FOR
 SEPARATE GAS PERMIT APPLICATION.
 A. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2001
 FUEL GAS CODE.
 B. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE BEING USED.
 C. TYPE OF GAS, (LP OR NATURAL)
 D. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2001 FUEL GAS CODE SECS. 401.8
 THRU 402.5.2 AND TABLES 402(1) THRU
 402(34).
 E. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2001 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES (A)(3).
 F. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2001 FUEL GAS CODE SEC. 402.2.
 NATURAL GAS SPECIFY .5 PSI OR 2 PSI.
 G. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2001 FUEL GAS CODE SEC 402.2
 H. CLEARLY SHOW THE LOCATION AND CAP-
 ACITY OF LP TANK(S), TYPE OF TANK (DOT
 OR ASME), THE DISTANCE OF THE TANK FROM
 THE BUILDING AND ADJACENT PROPERTY LINES
 THE DISTANCE OF THE TANK FROM ALL SOUR-
 CES OF IGNITION, OTHER CONTAINERS, BUILD
 INGS, AND THE LOCATION OF ANY BUILDING
 OPENINGS BELOW THE RELIEF VALVE OF THE
 TANK PER NFPA 58, TABLE 3-2.2.2.
 I. CLEARLY INDICATE ON THE PLAN IF THE
 LP TANK IS ABOVE OR BELOW GROUND, AND
 SHOW REQUIRED PROTECTION OF THE TANK AND
 APPURTENANCES PER NFPA 58. IF THE TANK
 IS BELOW GROUND THE CONTAINER SHALL BE
 SECURILY ANCHORED PER NFPA 58 SECTION
 3-2.2.7(H).
 J. EMERGENCY HOOD SHUT DOWN SHUT OFF
 VALVE TO BE BELOW CEILING. MANUAL SHUT
 OFF VALVE TO BE UPSTREAM. UNION TO BE
 DOWN STREAM OF MANUAL VALVE.
 8) SHT P-2 DRINKING FOUNTAIN SHALL
 COMPLY WITH 11-4.15 AND ALL SUBSECTIONS.
 ALSO SEE 11-4.1.3.(10)(A) PROVISIONS
 SHALL BE MADE FOR THOSE WHO HAVE DIFFI-
 CULTY BENDING OR STOOPING.
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377