Plan Review Details - Permit 03011281
Plan Review Stops For Permit 03011281
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-03-06 Cont ID  
Sent By jgomez Date 2003-03-06 Time 17:21 Rev Time 0.25
Received By jgomez Date 2003-03-06 Time 17:21 Sent To  
Notes
2003-03-06 00:00:00BUILDING REVIEW APPROVED. SEE PROVISO
 DATED 2-14-03.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2003-02-14 Cont ID  
Sent By dpalmer Date 2003-02-05 Time 07:14 Rev Time 2.00
Received By jgomez Date 2003-02-13 Time 17:45 Sent To  
Notes
2003-02-13 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-PROVIDE COMPLETE INFORMATION FOR STORM
 SHUTTERS UNDER A SEPARATE PERMIT.
 2-FLOOD ZONE A8. NEED TO PROVIDE THE
 ELEVATION CERTIFICATE.
 3-SHEET A-1: REVISE NOTE #24. SEE SEC.
 1007.5.1 FBC 2001 FOR HANDRAIL HEIGHT.
 4-GLASS BLOCK TO BE SAFETY GLASS IF FACE
 THICKNESS IS LESS THAN 0.25". SECTION
 2405.2.2 FBC 2001.
 5-SHEET A-4: REVISE NOTE #1. SEE SECTION
 1007.5.1 FBC 2001 FOR HANDRAIL HEIGHT.
 6-PROVIDE GENERAL SPECS FOR FIREBLOCKING
 AT ALL CONCEALED SPACES AS REQUIRED BY
 SEC. 2305.1.4 FBC 2001.
 7-PROVIDE COMPLETE DETAIL/SECTION FOR
 CONNECTION AT TOP OF COLUMN LOCATED
 BETWEEN GARAGE AND KITCHEN. CLARIFY
 HOW ARE STRAPS HOLDING THE GIRDER
 TRUSSES. SEE FLOOR FRAMING PLAN. SEC.
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
 8-SHEET S-3: PROVIDE SPECS ON STRUCTURAL
 WALL SECTIONS FOR FIRECUT REQUIREMENTS
 SEC. 2305.4 FBC 2001.
 9-DETAIL R19: SPECIFY ALL CONNECTORS.
 ROOF FRAMING PLAN DOESN'T SPECIFY THEM
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC.
 10-GARAGE DOOR STRUCTURAL BUCK DETAIL:
 SPECIFY ANCHOR EMBEDMENT AND WASHER
 SIZE. SEC. 104.2.1.2 CITY AMENDMENTS
 TO FBC 2001.
 11-PROVIDE SOIL TEST REPORT PRIOR TO
 CONSTRUCTION.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-02-05 Cont ID  
Sent By hmoser Date 2003-02-03 Time 18:00 Rev Time 0.30
Received By dpalmer Date 2003-02-05 Time 07:14 Sent To B
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-07-08 Cont ID  
Sent By shernand Date 2003-07-08 Time 16:07 Rev Time 0.00
Received By shernand Date 2003-07-08 Time 16:07 Sent To M
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2003-07-11 Cont ID  
Sent By pkrauss Date 2003-07-11 Time 14:32 Rev Time 0.25
Received By pkrauss Date 2003-07-11 Time 14:32 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2003-03-01 Cont ID  
Sent By shernand Date 2003-07-08 Time 16:07 Rev Time 0.50
Received By hmoser Date 2003-03-01 Time 06:48 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2003-02-03 Cont ID  
Sent By kstevens Date 2003-01-27 Time 12:46 Rev Time 0.25
Received By hmoser Date 2003-02-03 Time 17:59 Sent To E
Notes
2003-02-03 00:00:00PLAN DENIED
 1) ENERGY PERFORMANCE LEVEL DISPLAY CARD
 AND ENERGY CALCULATIONS DO NOT MATCH.
 2) EQUIPMENT SELESTION ON MANUAL (J) NOT
 COMPLETE.
 3) COOLING & HEATING BTU.ON MANUAL (J)
 DO NOTMATCH PLANS.
 PLAN REVIEW BY HAROLD MOSER
 (561)689-8096 EXT.8390

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-01-27 Cont ID  
Sent By sgraham Date 2003-01-24 Time 16:28 Rev Time 0.25
Received By kstevens Date 2003-01-27 Time 12:24 Sent To M
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-01-24 Cont ID  
Sent By sgraham Date 2003-01-24 Time 16:28 Rev Time 0.00
Received By sgraham Date   Time   Sent To P
Notes
***NONE***