| Plan Review Stops For Permit 03010450 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2003-01-28 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2003-01-24 |
Time |
13:34 |
Rev Time |
2.50 |
| Received By |
lhatten |
Date |
2003-01-24 |
Time |
17:57 |
Sent To |
|
|
| Notes |
| 2003-01-28 00:00:00 | REVIEW & STAMPED PLANS 01/24/2003 | | | PRINT CARD01/28/2003 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2003-10-09 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2003-10-09 |
Time |
17:51 |
Rev Time |
0.50 |
| Received By |
btrobaug |
Date |
2003-10-09 |
Time |
17:09 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2003-03-10 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-10-06 |
Time |
14:30 |
Rev Time |
0.00 |
| Received By |
btrobaug |
Date |
2003-03-10 |
Time |
11:30 |
Sent To |
P |
|
| Notes |
| 2003-03-10 00:00:00 | PROVISO | | | ~~~~~~~ | | | ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ | | | PLEASE PROVIDE THE FOLLOWING CHANGES TO | | | PLANS PRIOR TO ROUGH | | | INSPECTION,RESUBMIT FOR REVIEW. | | | | | | 1} THE LAUNDRY CIRCUIT ON THE PANEL | | | SCHEDULE SHOULD BE CALCULATED @ 1500 | | | VA.PER210-16(B). | | | | | | 2} PLEASE LIST THE REQ`D BATH(S) | | | CIRCUIT(S). PER 210-11-C-3 | | | MUST BE 20A AND #12AWG.ON PANEL | | | SCHEDULE. | | | | | | 3} THE GROUNDED ELECTRODE CONDUCTOR IS | | | TOO SMALL FOR 400 AMP SERVICE,SEE | | | 250-66.SHOULD BE 1/0. | | | | | | 4} THE FEEDER TO TO PANEL "B" SHOULD | | | CONTAIN AN EQUIPMENT GROUND PER 250-122. | | | | | | 5} THE SMOKE DETECTOR IN THE KITCHEN | | | DOES NOT COMPLY WITH 8-1.4.2 | | | NFPA-72,SHOULD BE CHANGED TO A HEAT | | | DETECTOR OR BE REMOVED. | | | | | | IF THERE ARE ANY QUESTIONS PLEASE CALL. | | | | | | BILL TROBAUGH | | | ELECTRICAL PLAN REVIEW | | | 561/659-8096 EXT 8392 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2003-01-24 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-03-10 |
Time |
08:25 |
Rev Time |
0.50 |
| Received By |
btrobaug |
Date |
2003-01-24 |
Time |
13:30 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
6 |
Status |
N |
Date |
2003-10-06 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2003-10-06 |
Time |
14:30 |
Rev Time |
0.00 |
| Received By |
csiegber |
Date |
2003-10-06 |
Time |
14:30 |
Sent To |
E |
|
| Notes |
| 2003-10-06 00:00:00 | TO BT DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2003-03-13 |
|
|
Cont ID |
|
| Sent By |
sthyng |
Date |
2003-03-13 |
Time |
14:18 |
Rev Time |
0.00 |
| Received By |
sthyng |
Date |
2003-03-13 |
Time |
14:18 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2003-03-10 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-03-10 |
Time |
08:25 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2003-03-10 |
Time |
08:25 |
Sent To |
E |
|
| Notes |
| 2003-03-10 00:00:00 | TO BT`S DESK. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2003-02-20 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-02-20 |
Time |
15:41 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2003-02-20 |
Time |
15:41 |
Sent To |
P |
|
| Notes |
| 2003-02-20 00:00:00 | TO PLUMB INBOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2003-01-13 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-01-13 |
Time |
08:18 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2003-01-13 |
Time |
08:18 |
Sent To |
P |
|
| Notes |
| 2003-01-13 00:00:00 | RES RACK. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2003-01-09 |
|
|
Cont ID |
|
| Sent By |
sgraham |
Date |
2003-01-10 |
Time |
15:25 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2003-01-09 |
Time |
18:53 |
Sent To |
Z |
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2003-03-03 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2003-03-03 |
Time |
13:34 |
Rev Time |
0.35 |
| Received By |
pkrauss |
Date |
2003-03-03 |
Time |
13:30 |
Sent To |
|
|
| Notes |
| 2003-03-03 00:00:00 | MECHANICAL PERMIT 03010477 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2003-01-18 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2003-03-01 |
Time |
11:38 |
Rev Time |
1.00 |
| Received By |
hmoser |
Date |
2003-01-18 |
Time |
09:37 |
Sent To |
E |
|
| Notes |
| 2003-01-18 00:00:00 | PLAN DENIED | | | CFM.ON PLAN DO NOT MATCH CFM.ON | | | EQUIPMENT,OR MANUAL (J) | | | PLAN REVIEW BY HAROLD MOSER | | | (561)659-8096 EXT.8390 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
4 |
Status |
P |
Date |
2003-03-14 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2003-03-14 |
Time |
17:05 |
Rev Time |
0.50 |
| Received By |
kstevens |
Date |
2003-03-14 |
Time |
17:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
F |
Date |
2003-03-12 |
|
|
Cont ID |
|
| Sent By |
sthyng |
Date |
2003-03-13 |
Time |
14:18 |
Rev Time |
0.33 |
| Received By |
kstevens |
Date |
2003-03-12 |
Time |
14:12 |
Sent To |
|
|
| Notes |
| 2003-03-12 00:00:00 | DENIED | | | REFERENCE: FBC-2001 PLUMBING | | | | | | 1) WASH MACHINE AND LAUNDRY SINK ARE | | | STILL DRAINING INTO THE WET VENT FOR THE | | | MASTER BATHROOM. SEPARATE THE LAUNDRY | | | ROOM PLUMBING FROM THE BATHROOM PLUMBING | | | AND GROUP ALL THE FIXTURES FOR THE | | | BATHROOM GROUP TOGETHER ON SANITARY | | | RISER DIAGRAM. | | | | | | REVIEW BY KEN STEVENS | | | (561) 659-8096 EXT 8377 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2003-03-01 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2003-03-10 |
Time |
11:30 |
Rev Time |
0.75 |
| Received By |
kstevens |
Date |
2003-03-01 |
Time |
11:33 |
Sent To |
M |
|
| Notes |
| 2003-03-01 00:00:00 | DENIED | | | REFERENCE: FBC-2001 PLUMBING | | | | | | 1) COMMENTS FROM PREVIOUS REVIEW WERE | | | NOT ADDRESSED. | | | A) ONLY FIXTURES IN THE BATHROOM GROUP | | | SHALL CONNECT TO THE WET VENTED HORI- | | | ZONTAL BRANCH DRAIN. SEC 909.1. 2ND | | | FLOOR LAUNDRY SHALL DRAIN DOWNSTREAM OF | | | THE W/C AND SHOWER. | | | B) MASTER BATH FLOOR PLAN SHOWS 2 LAVS, | | | BUT RISER SHOWS 3? PLEASE CLAIRFY | | | C) RISER DIAGRAM SHOWS SINK ON 2ND | | | FLOOR, BUT NOT SHOWN ON FLOOR PLAN. | | | PLEASE CLAIRFY. | | | | | | REVIEW BY KEN STEVENS | | | (561) 659-8096 EXT 8377 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2003-01-18 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-02-20 |
Time |
15:41 |
Rev Time |
1.00 |
| Received By |
jleech |
Date |
2003-01-18 |
Time |
08:32 |
Sent To |
M |
|
| Notes |
| 2003-01-18 00:00:00 | DENIED; | | | PAGE A-1 PLUMBING RISER; | | | 1.ONLY FIXTURES IN THE BATHROOM GROUP | | | SHALL CONNECT TO THE WET VENTED | | | HORIZONTAL BRANCH DRAIN. SEC.909.1. | | | 2ND FL. LAUNDRY AND MASTER BATH. | | | 2.TABLE 909.3 | | | ONLY 4 FU'S ON 2" WET VENT. | | | 3.MASTER BATH FLOOR PLAN SHOWS 2 LAVS. | | | RISER DIAGRAM SHOWS 3. | | | 4.RISER DIAGRAM SHOWS SINK ON 2ND FLOOR | | | NOT SHOWN ON FLOOR PLAN. | | | PLUMBING PLAN REVIEW BY; | | | JOHN LEECH | | | 659-8096 EXT. 8369 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2003-01-10 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-01-09 |
Time |
18:53 |
Rev Time |
0.00 |
| Received By |
sgraham |
Date |
|
Time |
|
Sent To |
I |
|
| Notes |
|
|