| Plan Review Stops For Permit 02120612 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2003-02-07 |
|
|
Cont ID |
|
| Sent By |
hpiskura |
Date |
2003-02-07 |
Time |
10:29 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
2003-02-07 |
Time |
10:29 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2003-01-14 |
|
|
Cont ID |
|
| Sent By |
hpiskura |
Date |
2003-01-14 |
Time |
08:11 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
2003-01-13 |
Time |
16:18 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2003-02-07 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-02-07 |
Time |
06:01 |
Rev Time |
0.25 |
| Received By |
dpalmer |
Date |
2003-02-07 |
Time |
06:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2002-12-27 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2002-12-27 |
Time |
17:42 |
Rev Time |
1.50 |
| Received By |
dpalmer |
Date |
2002-12-27 |
Time |
17:41 |
Sent To |
|
|
| Notes |
| 2002-12-27 00:00:00 | *************** UNSAT ***************** | | | | | | | | | PLEASE NOTE, ALL ELECTRICAL SHEETS WERE | | | STAMPED IN ERROR. PLEASE ADDRESS THE | | | FOLLOWING COMMENTS AND SUBMIT NEW SHEETS | | | IN SETS WHEN ALL REVIEWS ARE COMPLETE | | | AND PLANS ARE RESUBMITTED FOR REVIEW. | | | | | | 1)NOTE: PLEASE NOTE CIRCUITING FOR ALL | | | EMERGENCY AND EXITS LTS TO MEET 700-12 | | | WHICH WILL HAVE AN EFFECT ON LOADING | | | OF CIRCUITS, CIRCUIT #`S AND PANEL | | | SCHEDULES. | | | | | | 2)NOTE: PLEASE SEE FIRE REVIEW COMMENST | | | AS PANELS MAY CHANGE LOCATION DUE TO | | | FIRE RATING OF ROOMS WHERE PANELS ARE | | | LOCATED. | | | | | | 3)NOTE: PLEASE CLARIFY FIXTURES/TYPES | | | IN ORDER TO MEET 700-16 | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | | REVIEW. IF THERE ARE ANY QUESTIONS, | | | PLEASE CALL. | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW | | | 561-659-8096 EXT 8372 |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2003-02-07 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2003-02-07 |
Time |
09:56 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2003-02-07 |
Time |
09:56 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2002-12-19 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2002-12-19 |
Time |
13:53 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2002-12-19 |
Time |
13:53 |
Sent To |
|
|
| Notes |
| 2002-12-19 00:00:00 | 1) DUCT SMOKE DETECTORS ARE REQUIRED | | | TO ACTIVATE THE FIRE ALARM SYSTEM. IN | | | THE FIRE ALARM NOTES SECTION, IT | | | INDICATES A SUPERVISORY SIGNAL WILL | | | BE PROVIDED. | | | | | | 2) IT APPEARS THAT MAGNETIC LOCKS | | | ARE PRESENT ON EXIT DOORS. LOCKS ON | | | EGRESS DOORS SHALL COMPLY WITH | | | DELAYED EGRESS OR ACCESS CONTROLLED. | | | PLEASE REVIEW SPECIAL LOCKING | | | ARRANGEMENTS IN CHAPTER SEVEN OF THE | | | 2000 EDITION OF THE LIFE SAFETY CODE. | | | | | | 3) ALL ELECTRICAL, MECHANICAL, AND | | | STORAGE ROOM DOORS ARE TO BE FIRE | | | SEPARATED FROM OTHER AREAS OF THE | | | BUILDING BY AT LEAST ONE HOUR WITH | | | RATED OPENING PROTECTIVE DEVICES. | | | | | | MIKE CARSILLO, ASSISTANT FIRE MARSHAL | | | 659-8096,EXT.8497 | | | 835-2910 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2003-02-18 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-02-18 |
Time |
15:25 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2003-02-18 |
Time |
15:14 |
Sent To |
P |
|
| Notes |
| 2003-02-18 00:00:00 | PLUMB INBOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2003-02-04 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-02-04 |
Time |
12:40 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2003-02-04 |
Time |
12:40 |
Sent To |
|
|
| Notes |
| 2003-02-04 00:00:00 | TO COMM BOARD #13 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2002-12-09 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2002-12-09 |
Time |
18:04 |
Rev Time |
0.00 |
| Received By |
btrobaug |
Date |
2002-12-09 |
Time |
18:04 |
Sent To |
|
|
| Notes |
| 2002-12-09 00:00:00 | COMM BOARD #14./WRT |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2003-08-15 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2003-08-15 |
Time |
09:03 |
Rev Time |
0.15 |
| Received By |
pkrauss |
Date |
2003-08-15 |
Time |
09:03 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2002-12-28 |
|
|
Cont ID |
|
| Sent By |
hmoser |
Date |
2002-12-28 |
Time |
12:34 |
Rev Time |
1.50 |
| Received By |
hmoser |
Date |
2002-12-28 |
Time |
12:34 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2003-02-24 |
|
|
Cont ID |
|
| Sent By |
pschmitz |
Date |
2003-02-24 |
Time |
11:29 |
Rev Time |
1.00 |
| Received By |
pschmitz |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2003-02-24 00:00:00 | REVISION, APPROVED, PES. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2003-02-07 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-02-18 |
Time |
15:25 |
Rev Time |
1.25 |
| Received By |
kstevens |
Date |
2003-02-07 |
Time |
17:44 |
Sent To |
|
|
| Notes |
| 2003-02-07 00:00:00 | DENIED | | | REFERENCE: FBC-2001 PLUMBING | | | FBC-2001 CHAPTER 11 | | | | | | 1) ANSWER NOTED CONCERNING THE 20% | | | DISPROPORTIONAL COST FOR ACCESSIBILITY. | | | PLEASE ITEMISE ALL ACCESSIBILITY IMPROV- | | | MENTS AND SHOW COST OF EACH TO DETERMINE | | | HOW MUCH OF THE CONTRACT WAS SPENT FOR | | | THESE ITEMS. | | | 2) FROM PERVIOUS REVIEW: SHT P-2 WATER | | | HEATER DETAIL. THERMAL EXPANSION CONTROL | | | IS NOT ACHEIVED WITH A HEAT TRAP. EXPAN- | | | SION CONTROL REQUIRED BY SECTION 607.3.2 | | | IS ACCOMPLISHED WITH AN EXPANSION TANK. | | | PLEASE CHANGE DETAIL. | | | | | | REVIEW BY KEN STEVENS | | | (561) 659-8096 EXT 8377 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2003-01-06 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2003-01-06 |
Time |
09:45 |
Rev Time |
1.50 |
| Received By |
kstevens |
Date |
2003-01-06 |
Time |
09:44 |
Sent To |
|
|
| Notes |
| 2003-01-06 00:00:00 | DENIED | | | REFERENCE: FBC-2001 PLUMBING | | | FBC-2001 CHAPTER 11 | | | | | | 1) SHT AD-1 ALL CAPPED PLUMBING SHALL BE | | | INSPECTED PRIOR TO COVERING. | | | 2) SHT A-1 TOILET ROOM #153, PER SECTION | | | 11-4.1.6(1) ALL SPACES SHALL BE ACCESS- | | | IBLE. PER 1-4.1.6(2) 20% ABOVE CONTRACT | | | SHALL BE SPENT TO BRING SPACES UP TO NEW | | | CONSTRUCTION REQUIREMENTS. PLEASE SHOW | | | HOW THE $60,000 WILL BE SPENT. | | | 3) SHT A-4 DETAIL #04, SINK SHALL COMPLY | | | WITH 11-4.24 AND ALL SUBSECTIONS. PLEASE | | | PROVIDE DETAILS. | | | 4) SHT P-2 WATER HEATER DETAIL, PLEASE | | | COMPLY WITH 607.3.2. SHOW THERMAL EX- | | | PANSION CONTROL. | | | 5) SHT P-2 WATER RISER DIAGRAM, ALL | | | WATER HAMMER ARRESTORS REQUIRED BY SEC. | | | 604.9 SHALL BE LOCATED NEAR THE FIXTURE, | | | IN AN "EFFECTIVE RANGE" PER PDI-WH 201 & | | | MANUF. INSTALLATION INSTRUCTIONS, NOT AT | | | THE TOP OF THE DROP IN THE CEILING AS | | | SHOWN. | | | | | | REVIEW BY KEN STEVENS | | | (561) 659-8096 EXT 8377 |
|
|