| Plan Review Stops For Permit 02110299 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2003-02-05 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2003-01-29 |
Time |
16:10 |
Rev Time |
0.50 |
| Received By |
lsmith |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2003-01-06 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2002-11-20 |
Time |
07:45 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
2002-12-11 |
Time |
15:46 |
Sent To |
M |
|
| Notes |
| 2002-12-11 00:00:00 | SHEET A4 CITES DESIGN TO THE UBC.THE | | | 2001 FLORIDA BUILDING CODE IS IN | | | EFFECT. PLEASE REVISE AND ENSURE | | | COMPLIANCE WITH SAME. | | | | | | THE PLANS DO NOT SHOW THE DESIGN | | | PRESSURES FOR THE COMPONENTS AND | | | CLADDING, WALLS AND ROOF. | | | SEE FBC 1606.1.7. | | | | | | SHOW THE ATTIC ACCESS IN ACCORDANCE WITH | | | FBC 2309.6. | | | | | | SHOW THE MINIMUM INFORMATION FOR THE | | | REINFORCED MASONRY.SEE FBC 2103.1. | | | | | | THE BEAM SCHEDULE ON SHEET A4 CALLS OUT | | | 4 #5 T&B.THE TYPICAL WALL SECTION (1) | | | ON SHEET A3 INDICATES A DOUBLE BOND BEAM | | | WITH #7 BARS.PLEASE CLARIFY DESIGN | | | INTENT. | | | | | | THE MIAMI-DADE NOTICE OF ACCEPTANCE'S | | | 02-0129.01, 01-0323.02 AND 01-0516.10 | | | HAVE ILLEGIBLE DRAWINGS.PLEASE PROVIDE | | | CLEAR COPIES. | | | | | | BEFORE A PERMIT TO CONSTRUCT CAN BE | | | ISSUED, IMPACT FEES MUST BE PAID TO | | | PALM BEACH COUNTY, THE PERMIT PLANS | | | STAMPED BY THAT OFFICE, AND A COPY OF | | | THE PAID RECEIPT ATTACHED TO THE PERMIT | | | APPLICATION.CALL 233-5025 FOR MORE | | | INFORMATION. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2003-01-29 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2003-01-29 |
Time |
15:29 |
Rev Time |
0.75 |
| Received By |
btrobaug |
Date |
2003-01-29 |
Time |
15:43 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2002-11-14 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2002-11-08 |
Time |
16:49 |
Rev Time |
0.50 |
| Received By |
btrobaug |
Date |
2002-11-14 |
Time |
12:26 |
Sent To |
P |
|
| Notes |
| 2002-11-14 00:00:00 | PROVISO | | | ~~~~~~~ | | | ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ | | | PLEASE NOTE AND COMPLY WITH THE | | | FOLLOWING BEFORE CALLING ROUGH | | | INSPECTION. | | | | | | 1} A DISCONNECT IS REQUIRED PER | | | 230-70(A)CWPB,IF THERE IS MORE THAN | | | 8'OF SERVICE CONDUCTORS ARE INSIDE THE | | | BUILDING PER 230-6. | | | | | | 2} THE RELOCATED SERVICE MUST COMPLY | | | WITH 250-50(A)(B)& (C),CWP,ROD,AND | | | FOOTER STEEL. | | | | | | 3} PLEASE LIST THE REQ`D BATH(S) | | | CIRCUIT(S). PER 210-11-C-3 | | | MUST BE 20A AND #12AWG.,ON THE PANEL | | | SCHEDULE. | | | | | | 4} PLEASE LIST THE REQ'D ARC | | | FAULT PROTECTED CIRCUITS ON PANEL | | | SCHEDULE OR NOTE ON PLANS FOR BRANCH | | | CIRCUIT PROTECTION. PER 210-12 | | | | | | 5} ALL RECEPTALES SERVING COUNTERTOPS | | | MUST BE GFCI PROTECTED PER 210-8(A)(7) | | | CWBP. | | | | | | 6} AHU IN ATTIC MUST COMPLY WITH 210-63 | | | & 210-70(A)(3). | | | | | | BILL TROBAUGH | | | ELECTRICAL PLAN REVIEW | | | 561/659-8096 EXT.8392 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2003-07-18 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-07-18 |
Time |
12:54 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-07-18 |
Time |
12:54 |
Sent To |
M |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2003-01-23 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-01-23 |
Time |
12:01 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2003-01-23 |
Time |
12:00 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2002-11-08 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2002-11-08 |
Time |
16:49 |
Rev Time |
0.00 |
| Received By |
btrobaug |
Date |
2002-11-08 |
Time |
16:49 |
Sent To |
E |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2002-11-06 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2002-11-06 |
Time |
16:26 |
Rev Time |
0.00 |
| Received By |
btrobaug |
Date |
2002-11-06 |
Time |
16:26 |
Sent To |
Z |
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
P |
Date |
2003-07-25 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2003-07-25 |
Time |
11:15 |
Rev Time |
0.25 |
| Received By |
pkrauss |
Date |
2003-07-25 |
Time |
10:52 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2003-01-29 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-07-18 |
Time |
12:54 |
Rev Time |
0.35 |
| Received By |
pkrauss |
Date |
2003-01-29 |
Time |
15:27 |
Sent To |
E |
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2002-12-11 |
|
|
Cont ID |
|
| Sent By |
hpiskura |
Date |
2003-01-06 |
Time |
15:23 |
Rev Time |
0.35 |
| Received By |
pkrauss |
Date |
2002-12-11 |
Time |
16:08 |
Sent To |
|
|
| Notes |
| 2002-12-11 00:00:00 | DENIED: | | | | | | 1.PROVIDE ENERGY & MANUAL J CALCS. | | | | | | 2.PLAN SHEET A-5 MECHANICAL NOTE #10, | | | AHU INSTALLED ON BENCH OR STAND AS | | | SHOWN ON PLAN.PLANS INDICATE | | | AHU HANGING IN ATTIC.PROVIDE | | | DETAIL FOR HANGING.PLEASE NOTE | | | AUXILIARY DRAIN PAN WITH OVERFLOW | | | PROTECTION REQUIRED AS PER 2001 | | | FBC(M) 307.2.3. | | | | | | 3.ACCESS OPENING TO AHU SHALL BE NO | | | LESS THAN 20" X 30". 2001 FBC(M) | | | 306.3 | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | | CONTACT PATTY KRAUSS AT 659-8096 | | | EXT. 8388. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2003-01-23 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-01-23 |
Time |
12:10 |
Rev Time |
0.25 |
| Received By |
kstevens |
Date |
2003-01-23 |
Time |
17:03 |
Sent To |
M |
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2002-11-20 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2002-11-14 |
Time |
15:07 |
Rev Time |
0.50 |
| Received By |
kstevens |
Date |
2002-11-20 |
Time |
07:40 |
Sent To |
B |
|
| Notes |
| 2002-11-20 00:00:00 | DENIED | | | REFERENCE: FBC-2001 PLUMBING | | | | | | 1) SANITARY RISER DIAGRAM DOES NOT MEET | | | CODE. SHOWER IN BATHROOM #3 NOT VENTED. | | | ONLY THE FIXTURES WITHIN THE BATHROOM | | | GROUPS SHALL CONNECT TO THE WET VENTED | | | HORIZONTAL BRANCH. ANY ADDITIONAL FIX- | | | TURES SHALL DISCHARGE DOWNSTREAM OF THE | | | WET VENT. | | | | | | REVIEW BY KEN STEVENS | | | (561) 659-8096 EXT 8377 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2002-11-13 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2002-11-06 |
Time |
16:26 |
Rev Time |
0.25 |
| Received By |
sgraham |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|