| Plan Review Stops For Permit 02110117 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2003-01-15 |
|
|
Cont ID |
|
| Sent By |
lmartine |
Date |
2003-01-15 |
Time |
18:36 |
Rev Time |
1.00 |
| Received By |
lmartine |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2002-12-06 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2003-01-13 |
Time |
07:42 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
2002-12-05 |
Time |
14:23 |
Sent To |
Z |
|
| Notes |
| 2002-12-06 00:00:00 | SHEET A4 SHOWS DETAIL 1/A6 TAKEN IN | | | FOURSEPARATE PLACES OF DIFFERING | | | CONDITIONS AND IS NOT DETAILED ON THE | | | PLAN.PLEASE CLARIFY AS NECESSARY.THE | | | INFORMATION FOR THE TRANSITION OF THE | | | NEW CONCRETE BEAM TO THE OLD, THE | | | GIRDER CONNECTIONS TO THE CMU, AND | | | OTHER DETAILS ARE IMPORTANT. | | | | | | SECTION 1/A8 SHOWS A CONTINUOUS 2" | | | SCREENED SOFFIT VENT.PROVIDE AN | | | ANALYSIS, INCLUDING THE FREE AREA OF | | | THE VENT THAT DEMONSTRATES COMPLIANCE | | | WITH FBC 2309.7, ALSO SHOW THE ATTIC | | | ACCESS IN ACCORDANCE WITH FBC 2309.6. | | | | | | SECTION 2/A8 AND ELSEWHERE, SHOW THE | | | SPEICIFICATION FOR THE GUARD RAIL AND | | | HAND RAILS.SEE FBC 1007.5 AND FBC | | | 1015. | | | | | | PLEASE MARK THE COMPONENTS TO BE USED | | | FOR THE HURRICANE SHUTTERS IN SBCCI | | | REPORT | | | 2211. | | | | | | IF TEST AND OR NOTICE OF ACCEPTANCE | | | REPORTS FOR THE WINDOWS, DOORS AND ROOF | | | COVERING ARE NOT INCLUDED WITH THIS | | | PERMIT APPLICATION, SEPARATE PERMITS | | | AND FEES WILL BE REQUIRED. | | | | | | BEFORE A PERMIT TO CONSTRUCT MAY BE | | | ISSUED, IMPACT FEES MUST BE PAID TO | | | PALM BEACH COUNTY, THE PERMIT PLANS | | | STAMPED BY THAT OFFICE AND A COPY OF | | | THE PAID RECEIPT ATTACHED TO THE PERMIT | | | APPLICATION.CALL 561-253-5025 FOR | | | MORE INFORMATION. | | | | | | A COPY OF A RECORDED NOTICE OF | | | COMMENCEMENT MUST BE PROVIDED TO THE | | | CITY PRIOR TO THE PERMIT BEING ISSUED. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
4 |
Status |
P |
Date |
2004-06-14 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2004-06-14 |
Time |
15:43 |
Rev Time |
0.50 |
| Received By |
btrobaug |
Date |
2004-06-14 |
Time |
15:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2003-01-13 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2004-06-11 |
Time |
12:48 |
Rev Time |
0.53 |
| Received By |
btrobaug |
Date |
2003-01-13 |
Time |
06:35 |
Sent To |
B |
|
| Notes |
| 2003-01-13 00:00:00 | TO LUIS M./WRT |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
I |
Date |
2002-12-16 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2002-12-16 |
Time |
13:41 |
Rev Time |
0.50 |
| Received By |
btrobaug |
Date |
2002-12-16 |
Time |
13:17 |
Sent To |
|
|
| Notes |
| 2002-12-16 00:00:00 | CALLED SMITH & MOORE FOR A SECOND SET OF | | | PLANS AND A PERMIT APPLICATION./WRT. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2002-12-18 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2002-11-04 |
Time |
12:23 |
Rev Time |
1.50 |
| Received By |
btrobaug |
Date |
2002-11-04 |
Time |
12:25 |
Sent To |
P |
|
| Notes |
| 2002-11-04 00:00:00 | UNSAT | | | ~~~~~ | | | ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ | | | PLEASE PROVIDE THE FOLLOWING | | | INFORMATION, MAKE ANY NECESSARY CHANGES | | | ON PLANS AND RESUBMIT FOR REVIEW. | | | | | | 1} PLEASE SUBMIT AIC RATINGS FOR | | | ALL NEW EQUIPMENT BEING INSTALLED. | | | MAINS/PANELS/BREAKERS MUST BE RATED FOR | | | THE AVAILABLE FAULT CURRENT PER 110-9. | | | | | | 2} THE #6 EQUIPMENT GROUND RAN BETWEEN | | | THE METER AND THE PANEL IS CREATING A | | | PARALLEL GROUND PATH WITH THE GROUNDED | | | CONDUCTOR (NEUTRAL) AND CANNOT BE | | | INSTALLED PER 250-24(A)(1). | | | | | | 3} PLEASE NOTE THE GEC SYSTEM MUST | | | COMPLY WITH 250-50,SHOW SAME ON PLANS. | | | | | | 4} THE WATER HEATER ON CIRCUITS 18 & 20 | | | DOES NOT HAVE THE CORRECT OVERCURRENT | | | FOR THE LOAD SERVED. | | | | | | 5} PLEASE NOTE THAT THE LAUNDRY CIRCUIT | | | MUST COMPLY WITH 220-16(B).SHOW SAME IN | | | CALCS & SCHEDULES. | | | | | | 6} PLEASE NOTE THE DRYER MUST COMPLY | | | WITH 220-18,IT IS SHOWN AS 1200VA ON | | | THE SCHEDULE. | | | | | | 7} THE WATER HEATER LISTED ON CIRCUITS | | | 9 & 11 @ 5000VA HAS AN OCP OF 40 | | | AMPS,PLEASE CLARIFY. | | | | | | 8} AHU #1,CIRCUITS 15 & 17 LISTS THE OCP | | | AND THE WIRE SIZE INCORRECTLY. | | | | | | 9} PLEASE LIST THE REQ'D BATH(S) | | | CIRCUIT(S). PER 210-11-C-3 | | | MUST BE 20A AND #12AWG.LIST SAME ON | | | SCHEDULE. | | | | | | 10} NOTE THAT SERVICE RECEPTACLES ARE | | | REQUIRED IN ATTICS PER 210-63. | | | | | | 11} PLEASE LIST THE REQ'D ARC | | | FAULT PROTECTED CIRCUITS ON PANEL | | | SCHEDULE OR NOTE ON PLANS FOR BRANCH | | | CIRCUIT PROTECTION. PER 210-12 | | | | | | 12} SMOKE DETECTORS ARE REQUIRED | | | INSIDE AND OUTSIDE ALL SLEEPING ROOMS. | | | ALSO ON EACH LEVEL OF A MULTI-LEVEL | | | DWELLING UNIT. ROOMS WITH BATHS AND OR | | | CLOSETS ARE CONSIDERED SLEEPING ROOMS. | | | PER NFPA-72 2-2.1.1.1. | | | IN THE VICINITY OF BEDROOMS AND CLOSE | | | PROXIMITY OF STAIRWAYS. 2-5.2.1.3 | | | 3'FT FROM BATHS/KITCHENS.2-5.2.1.6 | | | | | | 13} PLEASE NOTE THAT FAN SUPPORTS MUST | | | COMPLY WITH 422-18. | | | | | | 14} PLEASE NOTE FRONT AND REAR | | | RECEPTS REQ'D PER 210-52(E). | | | | | | IF THERE ARE ANY QUESTIONS PLEASE CALL. | | | | | | BILL TROBAUGH | | | ELECTRICAL PLAN REVIEW | | | CITY OF WEST PALM BEACH | | | 561/659-8096 EXT.8392 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2004-06-11 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2004-06-11 |
Time |
12:48 |
Rev Time |
0.00 |
| Received By |
csiegber |
Date |
2004-06-11 |
Time |
12:48 |
Sent To |
E |
|
| Notes |
| 2004-06-11 00:00:00 | TO BT DESK/REV |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2003-08-11 |
|
|
Cont ID |
|
| Sent By |
alange |
Date |
2003-08-11 |
Time |
09:27 |
Rev Time |
0.00 |
| Received By |
alange |
Date |
2003-08-11 |
Time |
09:27 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2003-01-23 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-01-23 |
Time |
08:50 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2003-01-23 |
Time |
08:50 |
Sent To |
P |
|
| Notes |
| 2003-01-23 00:00:00 | TO PLUMB INBOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2002-12-04 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2003-01-13 |
Time |
07:42 |
Rev Time |
0.00 |
| Received By |
btrobaug |
Date |
2002-12-04 |
Time |
15:17 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2002-11-04 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2002-11-04 |
Time |
12:23 |
Rev Time |
0.00 |
| Received By |
btrobaug |
Date |
2002-11-04 |
Time |
12:23 |
Sent To |
E |
|
| Notes |
| 2002-11-04 00:00:00 | TO WRT./WRT. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2003-01-08 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2003-01-08 |
Time |
15:45 |
Rev Time |
0.55 |
| Received By |
pkrauss |
Date |
2003-01-08 |
Time |
14:52 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2002-11-18 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2002-11-09 |
Time |
10:58 |
Rev Time |
0.40 |
| Received By |
pkrauss |
Date |
2002-11-18 |
Time |
15:25 |
Sent To |
B |
|
| Notes |
| 2002-11-18 00:00:00 | PROVISO: | | | | | | AS PER 2001 FBC CHAPTER 13 SECTION | | | 610.1.ABC.3.6, DUCT INSTALLED IN THE | | | CAVATIY OF THE WALL SHALL BE INSULATED | | | IN ACCORDANCE WITH SECTION 610.1.ABC.2. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
4 |
Status |
P |
Date |
2003-08-15 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2003-08-15 |
Time |
15:39 |
Rev Time |
0.50 |
| Received By |
kstevens |
Date |
2003-08-15 |
Time |
15:39 |
Sent To |
|
|
| Notes |
| 2003-08-15 00:00:00 | REVISION OK W/PROVISO - SANITARY RISER | | | TO REFLECT CHANGES THIS REVISION AND | | | CHANGE REQUIRED FOR PROVISO ON STAMPED | | | SET OF PLANS. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2003-01-24 |
|
|
Cont ID |
|
| Sent By |
alange |
Date |
2003-08-11 |
Time |
09:27 |
Rev Time |
0.90 |
| Received By |
kstevens |
Date |
2003-01-24 |
Time |
15:26 |
Sent To |
|
|
| Notes |
| 2003-01-24 00:00:00 | PASSED - PROVISO - REVISION REQUIRED |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2003-01-13 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-01-23 |
Time |
08:50 |
Rev Time |
0.50 |
| Received By |
kstevens |
Date |
2003-01-13 |
Time |
13:27 |
Sent To |
|
|
| Notes |
| 2003-01-13 00:00:00 | DENIED | | | REFERENCE: FBC-2001 PLUMBING | | | | | | A) PREVIOUS PLAN REVIEW COMMENTS NOT | | | ADDRESSED. | | | 1) SHT D-1 ALL PLUMMBING, SANITARY/WATER | | | LINES CAPPED SHALL BE INSPECTED PRIOR TO | | | COVERING. | | | 2) SHT M/E-1 PLUMBING NOTES #1, CODE IN | | | EFFECT IS FBC-2001 PLUMBING NOT STANDARD | | | PLEASE CHANGE REFERENCE. | | | 3) SHT M/E-1 PLUMBING RISER SHALL RE- | | | FLECT THE FLOOR PLAN. THE LAUNDRY ROOM | | | IS TO THE LEFT OF THE KITCHEN, NOT BE- | | | TWEEN THE KITCHEN AND BATH RISERS. ALSO | | | THE LAUNDRY TRAY IS NOT SHOWN ON THE | | | RISER. A CLEANOUT IS REQUIRED ON RISER | | | ABOVE THE WASH MACHINE MINIMUM OF 4' | | | ABOVE FINISHED FLOOR. | | | 4) SHT M/E-1 PLUMBING RISER, ISLAND VENT | | | DOES NOT MEET CODE. (SUGGEST AN AIR AD- | | | MITTENCE VALVE) | | | 5) PER BLDG OFFICIAL, ONCE A PLAN COMES | | | IN FOR REVIEW WITH A RISER DIAGRAM, A | | | RISER DIAGRAM SHALL BE REQUIRED. | | | | | | REVIEW BY KEN STEVENS | | | (561) 659-8096 EXT 8377 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2002-11-09 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2002-12-18 |
Time |
12:25 |
Rev Time |
0.50 |
| Received By |
kstevens |
Date |
2002-11-09 |
Time |
10:57 |
Sent To |
M |
|
| Notes |
| 2002-11-09 00:00:00 | DENIED | | | REFERENCE: FBC-2001 PLUMBING | | | | | | 1) SHT D-1 ALL PLUMBING, SANITARY/WATER | | | LINES CAPPED SHALL BE INSPECTED PRIOR TO | | | COVERING. | | | 2) SHT M/E-1 PLUMBING NOTES #1, CODE TO | | | READ FBC-2001 PLUMBING NOT STANDARD. | | | 3) SHT M/E-1 PLUMBING RISER SHALL RE- | | | FLECT THE FLOOR PLAN. THE LAUNDRY ROOM | | | IS TO THE LEFT OF THE KITCHEN, NOT BE- | | | TWEEN THE KITCHEN AND BATH RISERS. ALSO | | | LAUNDRY TRAY IS NOT SHOWN ON RISER. | | | CLEAN OUT REQUIRED ON RISER ABOVE WASH | | | MACHINE MINIMUM OF 4' AFF. | | | 4) SHT M/E-1 PLUMBING RISER, ISLAND VENT | | | DOES NOT MEET CODE. (SUGGEST AN AIR AD- | | | MITTENCE VENT) | | | | | | REVIEW BY KEN STEVENS | | | (561) 659-8096 EXT 8377 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2002-12-23 |
|
|
Cont ID |
|
| Sent By |
hpiskura |
Date |
2002-12-06 |
Time |
08:50 |
Rev Time |
0.25 |
| Received By |
sgraham |
Date |
|
Time |
|
Sent To |
B |
|
| Notes |
|
|