Plan Review Details - Permit 02102247
Plan Review Stops For Permit 02102247
Review Stop E ELECTRICAL
Rev No 1 Status P Date 2002-12-10 Cont ID  
Sent By btrobaug Date 2002-12-10 Time 14:21 Rev Time 0.50
Received By btrobaug Date 2002-12-10 Time 13:54 Sent To R
Notes
2002-12-10 00:00:00TO LUIS M./WRT.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-01-06 Cont ID  
Sent By dpalmer Date 2003-01-06 Time 18:52 Rev Time 0.00
Received By dpalmer Date 2003-01-06 Time 18:52 Sent To P
Notes
2003-01-06 00:00:00TO PLUMB INBOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2002-12-10 Cont ID  
Sent By btrobaug Date 2002-12-10 Time 11:30 Rev Time 0.00
Received By btrobaug Date 2002-12-10 Time 11:25 Sent To Z
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2002-11-01 Cont ID  
Sent By dpalmer Date 2002-11-01 Time 13:41 Rev Time 0.00
Received By dpalmer Date 2002-10-31 Time 13:40 Sent To Z
Notes
2002-11-01 00:00:00TO Z IN BOX./WRT.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2002-12-11 Cont ID  
Sent By kstevens Date 2002-12-10 Time 17:34 Rev Time 0.45
Received By pkrauss Date 2002-12-11 Time 08:22 Sent To R
Notes
2002-12-11 00:00:00PROVISO:MECHANICAL PERMIT 02102250
  
 1.O.A. CALCS (NATURAL OR MECHANICAL)
 TO BE ON JOBSITE FOR THE ROUGH
 INSPECTION.
  
 2.FAN SHUTDOWN REQUIRED FOR FINAL
 INSPECTION.
  
 3.CLARIFY 4" FLUE PIPE SHOWN IN
 GARAGE.
  
 4.PROGRAMMABLE T-STAT REQUIRED AS
 PER ENERGY CALCS.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT 659-8096
 EXT. 8388.

Review Stop P PLUMBING
Rev No 2 Status P Date 2003-01-11 Cont ID  
Sent By kstevens Date 2003-01-11 Time 17:53 Rev Time 0.25
Received By kstevens Date 2003-01-11 Time 17:53 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2002-12-10 Cont ID  
Sent By dpalmer Date 2003-01-06 Time 18:53 Rev Time 0.25
Received By kstevens Date 2002-12-10 Time 17:33 Sent To M
Notes
2002-12-10 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
  
 1) SANITARY RISER DIAGRAM DOES NOT RE-
 FLECT FLOOR PLAN. BATH #2 SHOULD BE ON
 THE LEFT HAND SIDE OF BLDG DRAIN, W/M,
 L.T, POWDER ROOM AND MASTER BATH SHOULD
 BE ON THE RIGHT SIDE OF BLDG. DRAIN.
 POWDER ROOM MISSING FROM RISER DIAGRAM.
 PLEASE ADJUST RISER AND RESUBMIT.
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status P Date 2003-01-13 Cont ID  
Sent By rmcdouga Date 2003-01-13 Time 10:22 Rev Time 4.00
Received By rmcdouga Date   Time   Sent To  
Notes
2003-01-13 00:00:00BUILDING PROVISO
  
 1) A RECORDED COPY OF THE NOTICE OF
 COMMENCEMENT MUST BE SUBMITTED BEFORE A
 PERMIT CAN BE ISSUED.
  
 2)PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR:
 - OUTSWING DOUBLE FRONT DOORS (THE ONE
 SUBMITTED IS A PRELIMINARY NOA AND THE
 DRAWINGS DO NOT HAVE THE MIAMI-DADE CO.
 RENEWAL STAMP)
  
 3) PROVIDE A PRODUCT APPROVAL FOR THE
 STRUCTURAL MULLION BETWEEN THE TWELVE
 FOOT WIDE SLIDING GLASS DOOR AND FIXED
 GLASS ABOVE. THE PRODUCT APPROVALS
 SUBMITTED DO NOT WORK AT THIS OPENING.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2002-12-20 Cont ID  
Sent By pkrauss Date 2002-12-11 Time 08:42 Rev Time 4.00
Received By rmcdouga Date   Time   Sent To  
Notes
2002-12-13 00:00:00BUILDING DENIED
  
 1) NOTE #11 OF THE PLAN NOTES ON SHEET
 C1 STATES THAT HURRICANE PANELS ARE
 REQUIRED IN HVHZ. THEY ARE REQUIRED IN
 THE CITY OF WPB, WHICH IS NOT IN A HVHZ,
 BUT IS IN THE WIND-BORNE DEBRIS REGION.
 PLEASE REVISE. FBC CHAPTER 16.
  
 2) THE FBC SECTION 1707.4.4.2 STATES
 THAT WHERE WOOD BUCKS ARE LESS THAN
 1-1/2 INCHES THICK THE WINDOW AND DOOR
 ASSEMBLIES ARE REQUIRED TO BE ANCHORED
 THROUGH THE JAMB INTO THE STRUCTURAL
 SUBSTRATE. PLEASE REVISE THE SLIDING
 GLASS DOOR BUCK DETAIL ON A4.
  
 3) FBC SECTION 1707.4.4.2 REQUIRES BUCKS
 1-1/2 INCHES THICK OR GREATER TO EXTEND
 TO THE INTERIOR FACE OF THE JAMB. PLEASE
 REVISE DOOR HEAD/JAMB DETAIL ON A8.
  
 4) SPECIFY THE SIZE AND SPECIES OF WOOD
 FOR THE WOOD POST SHOWN ON A5.
  
 5) THE ENERGY CALC. FORM IS REQUIRED TO
 BE SIGNED BY THE OWNER/AGENT.
  
 6) PROVIDE THE LISTING INFORMATION AND
 MANUFACTURER'S SPECIFICATIONS FOR A ONE
 HOUR RATED FIRE ASSEMBLY FOR THE GLASS
 BLOCK.
  
 7)PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR:
 - SH WINDOWS (EXPIRED)
 - OUTSWING DOUBLE DOORS (EXPIRED)
  
 8) THE PRODUCT APPROVALS FOR THE
 MULLIONS DO NOT HAVE DESIGN WINDLOADS
 FOR A MULLION LENGTH OF 144" AND AN
 OPENING WIDTH OF 120", WHICH IS REQUIRED
 AT THE SLIDING GLASS DOOR AND FIXED
 GLASS WINDOW ASSEMBLY.
  
 9) THE SITE SPECIFIC PRODUCT APPROVAL
 FORM FOR THE OVERHEAD GARAGE DOORS IS
 NOT ACCEPTABLE. IT MUST REFERENCE THE
 THE 2001 FBC, BE SIGNED, SEALED AND
 DATED BY THE PRODUCT ENGINEER AND THE
 DESIGNER OF RECORD, AND THE LOCATION OF
 THE JOB IS REQUIRED. SUBMIT THE SBCCI
 PRODUCT EVALUATION REPORT #9606C THAT
 ACCOMPANIES THE DRAWING.
  
 10)THE STORM PANEL INSTALLATION SCHEDULE
 IS NOT CORRECT FOR THE VERTICAL
 INSTALLATION ON THE MULLED WINDOWS. THE
 SHUTTERS MUST SPAN THE ENTIRE OPENING
 PLUS THE REQUIRED EDGE DISTANCE. PLEASE
 CORRECT.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)659-8096 EXT.8202

Review Stop Z ZONING
Rev No 2 Status P Date 2002-12-10 Cont ID  
Sent By sgraham Date 2002-12-10 Time 13:29 Rev Time 0.25
Received By sgraham Date   Time   Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2002-11-04 Cont ID  
Sent By btrobaug Date 2002-12-10 Time 11:30 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
2002-11-04 00:00:00DENIED NEED SITE PLAN


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved