Review Stop B BUILDING (STRUCTURAL)
Rev No 6 Status P Date 2003-05-07 Cont ID  
Sent By rbrown Date 2003-05-07 Time 09:15 Rev Time 0.00
Received By rbrown Date 2003-05-07 Time 09:15 Sent To  
Notes
2003-05-07 00:00:004-25-03 SUBMITTAL FOR EXTERIOR DOOR
 PRODUCT APPROVAL

Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status P Date 2003-05-05 Cont ID  
Sent By rbrown Date 2003-05-05 Time 11:08 Rev Time 0.00
Received By rbrown Date 2003-05-05 Time 11:08 Sent To  
Notes
2003-05-05 00:00:00BUILDING PLAN REVIEW
 ******PROVISO*******
 ROBERT BROWN(561) 805 6716
 E-MAIL: [email protected]
  
 --PROVISO--
 THE DRAWING SHEETS SUBMITTED WITH THE
 DAYBAR OUTSWING DOOR PRODUCT APPROVAL
 NOA# 01-0730.01 ARE POOR COPIES AND DO
 NOT INCLUDE THE MIAMI-DADE COUNTY
 PRODUCT CONTROL RENEWAL STAMP.THE ONLY
 STAMP ON THE SUBMITTED SHEETS REFERS TO
 THE EXPIRED NOA# 98-0528.02.SUBMIT
 TWO LEGIBLE COPIES OF PRODUCT APPROVAL
 DRAWINGS VERIFIED BY VALID STAMPS.
 COPIES OF MIAMI-DADE PRODUCT APPROVALS
 CAN BE PRINTED FROM THEIR WEBSITE,WWW.
 MIAMIDADE.GOV/BUILDINGCODE/PC-SEARCH.HTM

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2003-04-21 Cont ID  
Sent By shernand Date 2003-04-28 Time 10:49 Rev Time 0.00
Received By rbrown Date 2003-04-18 Time 18:06 Sent To  
Notes
2003-04-21 00:00:00BUILDING PLAN REVIEW
 ******PROVISO*******
 ROBERT BROWN(561) 805 6716
 E-MAIL: [email protected]
  
 --PROVISO--
 SUBMIT PRODUCT APPROVALS FOR THE
 EXTERIOR DOORS 143.1 AND 157.2 TO THE
 MECHANICAL ROOM AND MATERIALS MANAGEMENT
 RESPECTIVELY.THE DOORS SHALL BE
 HURRICANE MISSILE IMPACT RESISTANT OR
 A SEPARATE SHUTTER PERMIT APPLICATION
 WILL BE REQUIRED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2003-04-09 Cont ID  
Sent By shernand Date 2003-04-14 Time 16:51 Rev Time 0.00
Received By rbrown Date 2003-04-09 Time 13:50 Sent To  
Notes
2003-04-09 00:00:00BUILDING PLAN REVIEW
 *******DENIED*******
 ROBERT BROWN(561) 659 8096 EXT 8499
  
 FBC = FLORIDA BUILDING CODE 2001
 FBC*= FLORIDA BUILD'G CODE (CITY AMEND)
  
 FOR CONSISTENCY, THE FOLLOWING COMMENTS
 ARE NUMBERED AS PER THE BUILDING PLAN
 REVIEW OF 2/12/03:
  
 1) FBC* 104.2.1.2THIS COMMENT HAS NOT
 BEEN PROPERLY ADDRESSED.SHEET A1.03,
 DUMPSTER AND BIO-HAZARD ENCLOSURE,
 REFERS TO THE CIVIL PLANS FOR STEEL
 BOLLARD DETAILS AND TO THE STRUCTURAL
 PLANS FOR CONCRETE SLAB AND BOND BEAM
 DETAILS.THE CIVIL PLANS DO NOT SHOW
 ANY DETAILS FOR THE STEEL BOLLARDS, AND
 THE STRUCTURAL PLANS DO NOT SHOW ANY
 DETAILS FOR THE CONCRETE SLAB OR BOND
 BEAM.CO-ORDINATE THE PLAN SETS TO SHOW
 THE REQUIRED DETAILS.
  
 **QUOTE PERMIT# ON ALL CORRESPONDENCE**
  
 END OF REVIEW COMMENTS
 THE CODE REFERENCES GIVE ADDITIONAL INFO
 IF YOU HAVE ANY QUESTIONS PLEASE CALL:
 ROBERT BROWN(561) 659 8096 EXT 8499

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2003-02-12 Cont ID  
Sent By rbrown Date 2003-02-12 Time 14:47 Rev Time 0.00
Received By rbrown Date 2003-02-12 Time 14:47 Sent To  
Notes
2003-02-12 00:00:00BUILDING PLAN REVIEW
 *******DENIED*******
 ROBERT BROWN(561) 659 8096 EXT 8499
  
 FBC = FLORIDA BUILDING CODE 2001
 FBC*= FLORIDA BUILD'G CODE (CITY AMEND)
  
 1) FBC* 104.2.1.2IT IS EVIDENT FROM
 THE ARCHITECTURAL PLANS THAT THE SCOPE
 OF WORK HAS CHANGED TO EXCLUDE THE
 RELOCATED MED-GAS STORAGE ENCLOSURE AND
 INCLUDE A BIO-HAZARD STORE AND DUMPSTER
 ENCLOSURE.THE REVISED SHEET A1.03
 REFERS TO THE CIVIL AND STRUCTURAL PLANS
 FOR STEEL BOLLARD, CMU WALL, CONCRETE
 BOND BEAM, CONCRETE SLAB AND CONCRETE
 FOOTING DETAILS.THE CIVIL AND
 STRUCTURAL PLANS HAVE NOT BEEN REVISED
 TO INCLUDE THE REQUIRED DETAILS
  
 2) MECHANICAL SHEET M3.01, DETAIL 12 AND
 13 (NOTE 2).WIND LOAD ON ROOF-MOUNTED
 MECHANICAL EQUIPMENT.THE FLORIDA
 BUILDING CODE IS NOT 2002, AND THE
 SECTION QUOTED DOES NOT EXIST.THE
 CORRECT REFERENCE IS FLORIDA BUILDING
 CODE 2001, SECTION 1606.1.AMEND THE
 NOTES.
  
 **QUOTE PERMIT# ON ALL CORRESPONDENCE**
  
 END OF REVIEW COMMENTS
 THE CODE REFERENCES GIVE ADDITIONAL INFO
 IF YOU HAVE ANY QUESTIONS PLEASE CALL:
 ROBERT BROWN(561) 659 8096 EXT 8499

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2002-11-12 Cont ID  
Sent By rbrown Date 2002-11-06 Time 16:30 Rev Time 0.00
Received By rbrown Date 2002-11-06 Time 16:29 Sent To  
Notes
2002-11-06 00:00:00BUILDING PLAN REVIEW
 ******PROVISO*******
 ROBERT BROWN(561) 659 8096 EXT 8499
  
 FBC = FLORIDA BUILDING CODE 2001
 FBC*= FLORIDA BUILD'G CODE (CITY AMEND)
  
 1) A RECORDED COPY OF THE NOTICE OF
 COMMENCEMENT MUST BE SUBMITTED BEFORE A
 PERMIT CAN BE ISSUED.FOR INFORMATION.
  
 2) IMPACT FEE MUST BE PAID TO PALM BEACH
 COUNTY, THE PLANS STAMPED BY THEM AND A
 COPY OF THE RECEIPT SUBMITTED TO THE
 CITY OF WEST PALM BEACH, DEPARTMENT OF
 CONSTRUCTION SERVICES, BEFORE A BUILDING
 PERMIT CAN BE ISSUED.FOR INFORMATION.
  
 3) FBC 1504.1SUBMIT A PRODUCT APPROVAL
 FOR THE ROOF COVERING.
  
 4) FBC 704.1.3.3FIRE RESISTANT
 SEPARATION AT THE WALL BETWEEN THE NEW
 MECH ROOM (1-143) AND BODY HOLD (1-146)
 AND TOILET (1-144) AND AT THE WALL
 BETWEEN THE MECH ROOM (1-143) AND THE
 NITROUS OXIDE ROOM SHALL BE PROVIDED IN
 ACCORDANCE WITH ANY FIRE PLAN REVIEW
 COMMENTS.THE NITROUS OXIDE ROOM WALL,
 WHICH WAS EXTERIOR WALL, IS TO BECOME AN
 INTERIOR WALL TO THE MECH ROOM.FROM
 SHEET M2.01, THE MECH ROOM APPEARS TO BE
 FOR AIR HANDLING EQUIPMENT AND DUCTS.
 FIRE RESISTANT SEPARATION MAY BE
 REQUIRED IF THE ROOM IS TO HOUSE ANY
 OTHER MECHANICAL EQUIPMENT.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-02-04 Cont ID  
Sent By dpalmer Date 2003-02-04 Time 15:04 Rev Time 0.50
Received By dpalmer Date 2003-02-04 Time 15:04 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2002-11-12 Cont ID  
Sent By dpalmer Date 2002-11-12 Time 10:14 Rev Time 1.00
Received By dpalmer Date 2002-11-12 Time 10:14 Sent To  
Notes
2002-11-12 00:00:00************** UNSAT *******************
  
 1)NOTE: PLEASE NOTE TAP CONDUCTORS ON
 SECONDARY SIDE OF TRANSFORMERS PER
 240-21. SHOWN AT 225 FT AWAY WITHOUT
 A MAIN.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-659-8096 EXT 8372

Review Stop ENG ENGINEERING CSD
Rev No 1 Status N Date 2002-11-06 Cont ID  
Sent By mamini Date 2002-11-06 Time 16:15 Rev Time 1.00
Received By mamini Date 2002-11-06 Time 16:15 Sent To  
Notes
2002-11-06 00:00:00N/A
 1. SEE PERMITS # 02061904 AND 02101671
 FOR UNDERGROUND UTILITIES AND SITE WORKS
 IF ANY QUESTIONS PLEASE CONTACT 659-8096
 EXT. 8492 MOHAMMAD R. AMIN

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2003-01-24 Cont ID  
Sent By mcarsill Date 2003-01-24 Time 12:16 Rev Time 0.00
Received By mcarsill Date 2003-01-24 Time 12:16 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2002-11-22 Cont ID  
Sent By mcarsill Date 2002-11-22 Time 12:01 Rev Time 0.00
Received By mcarsill Date 2002-11-22 Time 12:01 Sent To  
Notes
2002-11-22 00:00:00PLEASE PROVIDE MORE DETAILS ON
 NITROUS OXIDE STORAGE.
  
 MIKE CARSILLO, ASSISTANT FIRE MARSHAL
 659-8096,EXT.8497
 835-2910

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2003-05-13 Cont ID  
Sent By shernand Date 2003-05-13 Time 10:53 Rev Time 0.00
Received By shernand Date 2003-05-13 Time 10:53 Sent To  
Notes
2003-05-13 00:00:00SPOKE W/ HANK AT ARELLANO ABOUT REVISION
 OF 5/9/03.REVISIONS NOT CLEAR, WILL CO
 ME IN TO EXPLAIN.PLACED UP FRONT UNDER
 'A'.

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-04-28 Cont ID  
Sent By shernand Date 2003-04-28 Time 10:49 Rev Time 0.00
Received By shernand Date 2003-04-28 Time 10:49 Sent To B
Notes
2003-04-28 00:00:00RBROWN DESK

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-04-14 Cont ID  
Sent By shernand Date 2003-04-14 Time 16:51 Rev Time 0.00
Received By shernand Date 2003-04-14 Time 16:51 Sent To B
Notes
2003-04-14 00:00:00RBROWN DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-03-11 Cont ID  
Sent By sthyng Date 2003-03-11 Time 10:51 Rev Time 0.00
Received By sthyng Date 2003-03-11 Time 10:51 Sent To  
Notes
2003-03-11 00:00:00COMM BOARD #54

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-01-22 Cont ID  
Sent By btrobaug Date 2003-01-22 Time 16:24 Rev Time 0.00
Received By btrobaug Date 2003-01-22 Time 16:24 Sent To  
Notes
2003-01-22 00:00:00COM BOARD#53./WRT

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2003-04-09 Cont ID  
Sent By pkrauss Date 2003-04-09 Time 14:40 Rev Time 0.00
Received By pkrauss Date 2003-03-18 Time 11:10 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status N Date 2003-02-12 Cont ID  
Sent By pkrauss Date 2003-02-12 Time 15:38 Rev Time 1.15
Received By pkrauss Date 2003-02-12 Time 15:36 Sent To  
Notes
2003-02-12 00:00:00SEE BUILDING PLAN REVIEW COMMENT #2,
 PLAN SHEET M3.01 DETAIL #12 & 13,
 CLARIFY NOTE #2 FBC 2002 (SHOULD BE
 2001) SECTION 4201.16.2.6 (MUST BE A
 TYPOGRAPHICAL ERROR).
  
 SEE ALSO PLUMBING COMMENT #1 ON THE
 CONDENSATE.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT 659-8096
 EXT. 8388.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2002-11-21 Cont ID  
Sent By pkrauss Date 2002-11-21 Time 14:41 Rev Time 0.50
Received By pkrauss Date 2002-11-21 Time 14:06 Sent To  
Notes
2002-11-21 00:00:00DENIED:
  
 SEE PLUMBING COMMENTS ON CONDENSATE.
  
 PLAN SHEET M3.02 DETAIL 16, EQUIPMENT
 STANDS SHALL COMPLY WITH 2001 FBC TABLE
 1511.7 FOR MINIMUM HEIGHT REQUIREMENT
 (SEE ATTACHED).
  
 ADDITIONAL PERMIT REQUIRED FOR HOODS,
 FIRE SUPRESSION, GAS & MED GAS.PLEASE
 PROVIED MANUFACTURER SUBMITTAL & PLANS
 WITH PERMIT APPLICATION.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT 659-8096
 EXT. 8388.

Review Stop MEDGAS MEDICAL GAS
Rev No 1 Status P Date 2003-02-06 Cont ID  
Sent By pschmitz Date 2003-02-06 Time 08:53 Rev Time 1.00
Received By pschmitz Date   Time   Sent To  
Notes
2003-02-06 00:00:00MED GAS. PES

Review Stop P PLUMBING
Rev No 3 Status P Date 2003-03-22 Cont ID  
Sent By kstevens Date 2003-03-22 Time 06:52 Rev Time 0.25
Received By kstevens Date 2003-03-22 Time 06:52 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2003-01-25 Cont ID  
Sent By kstevens Date 2003-01-25 Time 08:00 Rev Time 0.75
Received By kstevens Date 2003-01-25 Time 08:00 Sent To  
Notes
2003-01-25 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
  
 1) SHT P2.01 CONDENSATE STILL SHOWN
 CONNECTING TO RWL REFERED TO IN NOTE #2
 NEXT TO PATHOLOGY OFFICE.
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377

Review Stop P PLUMBING
Rev No 1 Status F Date 2002-11-13 Cont ID  
Sent By kstevens Date 2002-11-13 Time 15:37 Rev Time 1.50
Received By kstevens Date 2002-11-13 Time 15:36 Sent To  
Notes
2002-11-13 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
 FBC-2001 CHAPTER 11
  
 1) SHT P1.01 CONDENSATE SHALL DRAIN TO
 THE EXTERIOR OF THE BLDG SEPARATELY.
 CONDENSATE SHALL NOT TIE INTO THE RAIN
 CONDUCTORS INSIDE THE BLDG AND SHALL NOT
 DRAIN INTO FLOOR DRAINS FOR THE SANITARY
 SYSTEM. CONDENSATE SHALL TIE INTO STORM,
 CATCHBASIN OR DRYWELL OUTSIDE OF THE
 BUILDING WITH A RELIEF VENT IN THE LINE
 AS IT EXITS THE BLDG. SHT P2.01 SAME
 NOTES APPLY.
 2) SEPARATE GAS PERMIT REQUIRED FOR ANY
 NATURAL GAS WORK BEING DONE INSIDE BLDG.
  
 ----MED GAS SEPARATE REVIEW-----
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377

Review Stop Z ZONING
Rev No 1 Status P Date 2003-01-22 Cont ID  
Sent By sgraham Date 2003-01-22 Time 15:50 Rev Time 0.00
Received By sgraham Date   Time   Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved