Plan Review Details - Permit 02101140
Plan Review Stops For Permit 02101140
Review Stop E ELECTRICAL
Rev No 2 Status P Date 2002-12-24 Cont ID  
Sent By dpalmer Date 2002-12-23 Time 10:06 Rev Time 0.50
Received By dpalmer Date 2002-12-24 Time 12:36 Sent To B
Notes
2002-12-24 00:00:00TWO ITEMS REDLINED ON PLANS.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2002-11-05 Cont ID  
Sent By hmoser Date 2002-11-03 Time 11:24 Rev Time 0.75
Received By dpalmer Date 2002-11-05 Time 15:14 Sent To B
Notes
2002-11-05 00:00:00************** UNSAT ******************
  
 1)NOTE: PLEASE SUBMIT AIC RATING
 FOR ALL NEW SERVICE EQUIPMENT. MAINS,
 PANELS, BRKRS MUST BE RATED FOR THE
 AVAILABLE FAULT CURRENT.110-9/215-5
  
 2)NOTE: PLEASE LIST THE REQ`D BATH
 CIRCUIT(S) PER 210-52D,210-11-C-3
  
 3)NOTE: PLEASE LIST THE REQ` ARC FAULT
 PROTECTED CIRCUITSPER 210-12
  
 4)NOTE: PLEASE NOTE SIZING FOR OCP FOR
 AHU`S TO BE SIZED PER 424-3B
  
 5)NOTE: PLEASE CLARIFY HOW THREE AHU
 LOADS AT 9.6KW AND ARE AT 65% = TO 13KW
  
  
 PLEASE COMPLETEAND SUBMITFOR REVIEW.
 IF THERE ARE ANY QUESTIONS, PLEASE CALL.
  
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-659-8096 EXT 8372

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-01-14 Cont ID  
Sent By rmcdouga Date 2003-01-14 Time 13:12 Rev Time 0.00
Received By rmcdouga Date   Time   Sent To P
Notes
2003-01-14 00:00:00WAS PASSED BY BUILDING IN PREVIOUS
 REVIEW. GAVE TO K.STEVENS FOR PLUMBING
 REVIEW.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-01-10 Cont ID  
Sent By btrobaug Date 2003-01-10 Time 17:14 Rev Time 0.00
Received By btrobaug Date 2003-01-10 Time 17:14 Sent To B
Notes
2003-01-10 00:00:00TO ROB M./WRT

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2002-12-23 Cont ID  
Sent By dpalmer Date 2002-12-23 Time 10:06 Rev Time 0.00
Received By dpalmer Date 2002-12-23 Time 10:06 Sent To E
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2002-11-03 Cont ID  
Sent By hmoser Date 2002-11-03 Time 11:24 Rev Time 0.50
Received By hmoser Date 2002-11-03 Time 11:24 Sent To E
Notes
2002-11-03 00:00:00NO MECHANICAL PLANS

Review Stop P PLUMBING
Rev No 3 Status P Date 2003-01-15 Cont ID  
Sent By kstevens Date 2003-01-15 Time 09:18 Rev Time 0.33
Received By kstevens Date 2003-01-15 Time 09:17 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2003-01-07 Cont ID  
Sent By rmcdouga Date 2003-01-14 Time 13:14 Rev Time 0.33
Received By kstevens Date 2003-01-07 Time 07:55 Sent To  
Notes
2003-01-07 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
  
 1) ALL CHANGES TO A SIGNED AND SEALED
 PLAN SHALL BE SIGNED AND DATED BY THE
 ARCHITECT/ENGINEER OF RECORD.
 2) SHT A-4 BIDET TO BE TIED INTO VENTED
 LINE IN LADIES GRANDE SUITE.
 3) SHT A-4 BATH #2 SHOWS 2 SHOWERS?
 4) SHT A-4 MASTER BATH SHOWS DEAD END
 PAST W/C AND TUB LINE NEEDS TO BE EXTEN-
 DED.
 5) PLEASE MAKE CHANGES ON NEW SIGNED AND
 SEALED SHEET.
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377

Review Stop P PLUMBING
Rev No 1 Status P Date 2002-10-31 Cont ID  
Sent By jleech Date 2002-10-31 Time 20:16 Rev Time 0.33
Received By hmoser Date 2002-10-31 Time 20:16 Sent To E
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 3 Status P Date 2003-01-15 Cont ID  
Sent By rmcdouga Date 2003-01-15 Time 15:06 Rev Time 2.50
Received By rmcdouga Date   Time   Sent To  
Notes
2003-01-15 00:00:00BUILDING PROVISO
  
 1)PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR STRUCTURAL WINDOW MULLIONS

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status P Date 2003-01-06 Cont ID  
Sent By rmcdouga Date 2003-01-06 Time 16:21 Rev Time 4.00
Received By rmcdouga Date   Time   Sent To  
Notes
2003-01-06 00:00:00BUILDING PROVISO
  
 1)PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR:
 - SINGLE OUTSWING FRENCH DOOR
 - MECHANICAL ROOM DOOR
 - DOUBLE OUTSWING FRONT DOOR
 - STRUCTURAL MULLIONS (VERTICAL)
 - FOUR PANEL SLIDING GLASS DOOR
 - SINGLE HUNG WINDOWS
 - FIXED GLASS WINDOWS
  
 NOTE: SITE SPECIFIC ENGINEERING IS
 REQUIRED IF PRODUCT DOES NOT HAVE SBCCI
 OR METRO-DADE PRODUCT APPROVALS.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2002-11-25 Cont ID  
Sent By rmcdouga Date 2002-11-22 Time 15:32 Rev Time 4.00
Received By rmcdouga Date   Time   Sent To  
Notes
2002-11-22 00:00:00BUILDING DENIED
  
 1) IMPACT FEES MUST BE PAID TO PALM
 BEACH COUNTY, PLANS STAMPED BY THEM AND
 COPY OF RECEIPT SUBMITTED TO CITY OF
 WEST PALM BEACH BUILDING DEPARTMENT,
 BEFORE A BUILDING PERMIT CAN BE ISSUED.
  
 2) A RECORDED COPY OF THE NOTICE OF
 COMMENCEMENT MUST BE SUBMITTED BEFORE A
 PERMIT CAN BE ISSUED.
  
 3)FL. BLD CODE 1606.1.7 THE FOLLOWING
 INFORMATION RELATED TO WIND SHALL BE
 SHOWN ON THE CONSTRUCTION DRAWINGS,
 1)- BASIC WIND SPEED, MPH
 2)- WIND IMPORTANCE FACTOR, & BUILDING
 CATEGORY
 3)- WIND EXPOSURE
 4)- INTERNAL PRESSURE COEFFICIENT,
 5)- COMPONENTS & CLADDING, THE DESIGN
 WIND PRESSURES IN TERMS OF PSF.
 INDICATE THE INTERNAL PRESSURE
 COEFFICIENT ON THE PLANS (+ OR - .18 FOR
 ENCLOSED STRUCTURES).
  
 4) REVISE NOTE 11 ON C1, HURRICANE
 SHUTTERS ARE REQUIRED IN THE CITY OF WPB
 AND IT IS NOT LOCATED IN A HVHZ.
  
 5) REVISE FRAMING NOTE 15 ON C1, ASTM C
 1063 REQUIRES 3/8" RIB METAL LATH TO BE
 FASTENED AT EACH RIB (4").
  
 6) THE LINES DESIGNATING THE FOOTING ARE
 NOT INDICATED FOR ONE OF THE F6 FOOTINGS
 AT THE COVERED ENTRY.
  
 7) THE FOOTING SCHEDULE ON A1 REFERS TO
 DETAIL 8 FOR THE F4 PAD AT THE WOOD
 POST. DETAIL 8 IS FOR A STEEL COLUMN.
  
 8) SPECIFY ACCESS TO ATTIC SPACE AS
 REQUIRED BY FBC 2309.6.
  
 9) SPECIFY SAFETY GLASS AT THE WINDOWS
 AT THE TUB IN THE LADIES GRANDE SUITE &
 IN HIS BATH AS REQUIRED BY FBC 2405.2.
  
 10) REVISE THE TYPICAL WALL SECTION ON
 A4 FROM 6" TO 4" MINIMUM ABOVE GRADE TO
 FINISH FLOOR. SEE CITY AMENDMENTS
 1804.1.7 AND FBC 1804.1.3.
  
 11) SPECIFY THE REQUIRED EMBEDMENT DEPTH
 FOR THE 1/2" ANCHOR BOLTS AT THE GARAGE
 DOOR BUCKS ON A4.
  
 12) REVISE DETAIL 13 ON A5 TO SHOW THE
 HANGER ON A 45 DEGREE ANGLE.
  
 13) THE 14 ON A5 TAG ABOVE THE LIVING
 ROOM WINDOWS IS IN THE WRONG LOCATION.
  
 14) DETAIL 5 ON A5 IS MISLABELED AS 5 ON
 A6.
  
 15) SPECIFY THE HANGERS FOR THE 38" DEEP
 GIRDERS ON EACH SIDE OF THE COVERED
 ENTRY.
  
 16) AN L-9 IS SPECIFIED ON SHEET A5
 ABOVE THE LIVING ROOM WINDOW, HOWEVER,
 IT IS NOT LISTED IN THE TIE-BEAM
 SCHEDULE.
  
 17) THE LINTEL ABOVE THE FRONT DOOR IS
 INDICATED ON A-5 AS 8"X16",BUT ON THE
 ELEVATION IT APPEARS TO BE 8"X8". PLEASE
 CLARIFY.
  
 18) ON SHEET A6 THE WRONG DETAILS ARE
 SPECIFIED IN THREE PLACES. SEE THE RED
 LINES ON SHEET A6 AND CORRECT.
  
 19) THE FLOOD ZONE INFORMATION GIVEN ON
 THE SURVEY IS NOT CORRECT. PLEASE
 REVISE.
  
 20) THE CONDITIONED FLOOR AREA LISTED ON
 THE PLANS DIFFERS FROM THE A/C AREA ON
 THE PLANS. PLEASE CORRECT.
  
 21) THE OWNER/AGENT IS REQUIRED TO SIGN
 AND DATE THE ENERGY CALCULATION FORM.
  
 22) INDICATE ON THE PLANS THAT THE WALL
 ADJACENT TO THE GARAGE IS INSULATED AND
 THE DOOR IS TO BE INSULATED OR SOLID
 CORE WOOD PER CHAPTER 13 OF THE FBC.
  
 23) INDICATE ON THE PLANS THE ROOF
 SHEATHING NAILING REQUIREMENTS AND ROOF
 ZONES AS REQUIRED BY THE CITY OF WPB
 AMENDMENTS TO FBC TABLE 2306.1.
  
 24) PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR:
 - OUTSWING DOUBLE DOOR WITHOUT SIDELITES
 - SINGLE OUTSWING FRENCH DOOR
 - DOOR AT MECHANICAL ROOM
 - OVERHEAD GARAGE DOOR(INFORMATION THAT
 WAS SUBMITTED IS NOT ACCEPTABLE)
  
 25) IF THE NORANDEX PRODUCTS DO NOT HAVE
 SBCCI OR METRO-DADE PRODUCT APPROVALS,
 SITE SPECIFIC ENGINEERING IS REQUIRED.
 THE SITE SPECIFIC PRODUCT APPROVAL FORMS
 ARE REQUIRED TO BE SIGNED, SEALED AND
 DATED BY THE ENGINEER CERTIFYING THE
 PRODUCT AND THE DESIGNER OF RECORD MUST
 SIGN, SEAL AND DATE THE FORM INDICATING
 THAT HE HAS REVIEWED THE PRODUCT AND IS
 APPROVING ITS USE IN THE STRUCTURE. THE
 LOCATION OF THE STRUCTURE IS TO BE
 SPECIFIED ON THE FORM. THE SPECIFIC
 PRODUCTS BEING INSTALLED ARE TO BE
 LISTED ON THE FORMS AND SHOWN IN THE
 DRAWINGS, OR AN EGINEERED ANALYSIS FOR A
 DIFFERENT SIZE OR SHAPE BASED ON THE
 TESTED PRODUCT WILL BE REQUIRED.
  
 26) PROVIDE AN INSTALLATION SCHEDULE AND
 KEY PLAN FOR THE HURRICANE PANELS.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)659-8096 EXT.8202

Review Stop Z ZONING
Rev No 1 Status P Date 2002-10-25 Cont ID  
Sent By sgraham Date 2002-10-25 Time 12:09 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy