| Plan Review Stops For Permit 02101075 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2003-04-08 |
|
|
Cont ID |
|
| Sent By |
hpiskura |
Date |
2003-04-08 |
Time |
08:58 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
2003-04-08 |
Time |
08:58 |
Sent To |
|
|
| Notes |
| 2003-04-08 00:00:00 | OWES IMPACT FEES. | | | | | | MEZZANINE AREA 1373 SF WAS NOT INCLUDED | | | WITH SITE DATA SHEET A1 |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2003-03-28 |
|
|
Cont ID |
|
| Sent By |
hpiskura |
Date |
2003-03-28 |
Time |
15:23 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
2003-03-28 |
Time |
13:43 |
Sent To |
|
|
| Notes |
| 2003-03-28 00:00:00 | THE EXIT STAIRS FROM THE MEZZANINE ARE | | | REQUIRED TO BE ENCLOSED IN FIRE RATED | | | CONSTRUCTION IN ACCORDANCE WITH FBC | | | 1005.7.3.THE TRAVEL DISTANCE EXCEEDS | | | 75'. | | | | | | PORTAFAB PLANS SHEET 1 OF 3.WHAT ARE | | | THE "SUPPORT BOARDS" | | | | | | WHAT ARE THE COLUMNS THAT SUPPORTS THE | | | W10X39?INCLUDE THE CONNECTION AT THE | | | BOTTOM. | | | | | | WHAT DO THE W10X15 BEAMS REST ON AT THE | | | WALL ENDS?COLUMNS? THE VINYL AND | | | PAPERWALL PANELS? | | | | | | WHAT IS THE DECKING SHOWN AS "DUST | | | COVER"HOW IS IT FASTENED THE W10 | | | BEAMS? | | | | | | WHAT IS THE RISE AND RUN OF THE | | | "U-SHAPED BOCA STAIR"?HANDRAIL | | | DETAILS?LANDING CONSTRUCTION AND | | | SUPPORT?DESIGN LOAD? | | | | | | ALSO, PLEASE PROVIDE A COPY OF THE | | | STRUCTURAL CALCULATIONS DEMOSTRATING | | | THE MEZZANINE CAN SUPPORT THE MINIMUM | | | 125 PSF LIVE LOAD. | | | | | | AS PREVIOUSLY NOTED IMPACT FEES MUST BE | | | PAID TO THE COUNTY BEFORE A PERMIT MAY | | | BE ISSUED. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2003-01-28 |
|
|
Cont ID |
|
| Sent By |
hpiskura |
Date |
2003-01-28 |
Time |
15:54 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
2003-01-28 |
Time |
14:17 |
Sent To |
|
|
| Notes |
| 2003-01-28 00:00:00 | PLEASE PROVIDE A RECENT PROPERTY SURVEY | | | AS PREVIOUSLY REQUESTED.SEE FBC 104.2. | | | 4 AS AMENDED BY THE CITY. | | | | | | PROVIDE CONSTRUCTION DETAILS FOR THE | | | MEZZANINE AND STAIRS OR THE DESIGN | | | INFORMATION IN ACCORDANCE WITH GOOD | | | ENGINEERING PRACTICE. SEE THE FAC | | | 61G15-30, RESPONSIBILITY RULES COMMON | | | TO ALL ENGINEERS. | | | | | | THE FOUNDATION REQUIREMENTS OF FBC 1803. | | | 2 MUST BE ACCOMPLISHED BEFORE | | | CONSTRUCTION. | | | | | | IMPACT FEE PAYMENT AND A RESIDENT | | | INSPECTOR AS PREVIOUSLY NOTED WILL NEED | | | TO BE ADDRESSED BEFORE A PERMIT MAY BE | | | ISSUED. | | | | | | PRODUCT APPROVALS FOR THE ROOF COVERING, | | | WINDOWS AND DOORS MUST ACCOMPANY THIS | | | PERMIT APPLICATION ORSEPARATE PERMITS | | | AND FEES WILL BE REQUIRED FOR THOSE | | | PORTIONS OF THE WORK. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2002-11-26 |
|
|
Cont ID |
|
| Sent By |
hpiskura |
Date |
2002-11-26 |
Time |
11:40 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
2002-11-25 |
Time |
08:40 |
Sent To |
|
|
| Notes |
| 2002-11-26 00:00:00 | PLEASE PROVIDE A RECENT SIGNED SEALED | | | AND DATED PROPERTY SURVEY. | | | | | | PROVIDE CONSTRUCTION DETAILS FOR THE | | | MEZZANINE/SECOND FLOOR.IF THE DESIGN | | | IS TO BE DELEGATED SEE THE | | | RESONSIBILITY RULES FOR ENGINEERS AS TO | | | THE INFORMATION REQIRED ON THE PLANS. | | | | | | A DEMONSTRATION FOR THE REQUIREMENTS OF | | | FBC 1803.2 REGARDING THE FOUNDATIONS TO | | | BE CONSTRUCTED ADJACENT TO THE PROPERTY | | | LINE BEING ADDRESSED IS NECESSARY WHERE | | | APPLICABLE. | | | | | | THE EGRESS DOOR AT THE NORTH EAST | | | CORNEROF THE BUILDING APPEARS THAT IT | | | WILL BE OBSTRUCTED BY THE PARKING | | | SPACES.SEE FBC 1010.1. | | | | | | IF TEST AND OR NOTICE OF ACCEPTANCE | | | REPORTS FOR THE DOORS, WINDOWS, AND | | | ROOF COVERING ARE NOT INCLUDED WITH | | | THIS PERMIT AND PLANS, A SEPARATE | | | PERMIT, PLANS AND FEES WILL BE REQUIRED | | | FOR THAT WORK. | | | | | | SHOW THE STRUCTURAL DESIGN INFORMATION | | | IN ACCORDANCE WITH FBC 1606.1.7. | | | | | | ALSO, SHOW THE SOIL DESIGN PRESSURE | | | ASSUMED.NOTE WHAT METHOD OF WIND | | | DESIGN WAS USED.FBC 1606.2,ASCE | | | 7-98 SIMPLIFIED OR ANALYTICAL.SEE FBC | | | 1609.4.3 FOR REDUCTIONS AND LOAD | | | COMBINATIONS PERMITTED. | | | | | | SECTION KS1 ON S4 SHOWS A HORIZONTAL | | | PROJECTION OF INDETERMINATE LENGTH AND | | | THE ARCHITECTURAL PLANS INDICATE A | | | CANVAS CANOPY ON A4.PLEASE CLARIFY. | | | | | | PROVIDE CALCULATIONS FOR THE ROOF | | | DRAINAGE TO DEMONSTRATE COMPLIANCE WITH | | | FBC 1511.6.4 | | | | | | FOR PROJECTS OF THIS SCOPE A RESIDENT | | | INSPECTOR IS REQUIRED.CONTACT DON | | | NEELY AT 561-659-8096 X 8333 FOR MORE | | | INFORMATION. | | | | | | BEFORE A PERMIT TO CONSTRUCT MAY BE | | | ISSUED IMPACT FEES MUST BE PAID TO THE | | | COUNTY, THE PERMIT PLANS STAMPED BY | | | THAT OFFICE AND A COPY OF THE PAID | | | RECEIPT ATTACHED TO THE PERMIT | | | APPLICATION. CALL 561-233-5025 FOR MORE | | | INFORMATION. | | | | | | THE NOTICE OF COMMENCEMENT IS FOR LAND | | | CLEARING, PLEASE PROVIDE A NOC FOR THE | | | SCOPE OF WORK PROPOSED IN THIS PERMIT. | | | | | | PROVIDE A DESCRIPTION OF THE TYPE OF | | | WORK THAT IS PROPOSED TO TAKE PLACE IN | | | THIS BUILDING AND THE NATURE, | | | CHARACTERISTICS AND REPRESENTATIVE | | | QUANTITIES OF MATERIALS TO BE USED SO | | | THAT COMPLIANCE WITH FBC 308 MAY BE | | | DETERMINED. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
4 |
Status |
P |
Date |
2003-05-13 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-05-13 |
Time |
12:08 |
Rev Time |
0.50 |
| Received By |
dpalmer |
Date |
2003-05-13 |
Time |
12:08 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2003-03-24 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-03-24 |
Time |
11:02 |
Rev Time |
0.75 |
| Received By |
dpalmer |
Date |
2003-03-24 |
Time |
11:02 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2003-02-06 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2003-02-06 |
Time |
18:34 |
Rev Time |
0.75 |
| Received By |
dpalmer |
Date |
2003-02-06 |
Time |
18:34 |
Sent To |
|
|
| Notes |
| 2003-02-06 00:00:00 | ************** UNSAT *************** | | | | | | PLEASE NOTE, SOME NOTES FROM | | | FIRST REVIEW STILL NEED TO BE ADDRESSED. | | | | | | 1)NOTE: PLEASE SEE OCP FOR AHU`S 1&2, | | | SHOWS 40A OCP FOR 10KW HEAT(MECH PLANS) | | | PLEASE ADJUST AQND CORRELATE MECH AND | | | ELECTRICAL PLANS. PLEASE ALSO SIZE OF | | | OCP PER 424-3 IF AHU'S ARE INDEED 10KW | | | AS SHOWN ON M SHEETS. PLEASE SEE LOADS | | | SHOWN ON PANEL SCHEDULE, LOAD SHOWN | | | EXCEEDS LOADS SHOWN ON LOAD CALCULATIONS | | | FOR CHILLER/COND UNITS. THE HIGHER OF | | | THE TWO LOADS NEED TO BE SHOWN IN LOAD | | | CALCS. PLEASE RE-DO LOAD CALCULATIONS | | | TO REFLECT LOADS OF AHU`S . SHOWN AT | | | 4.3 PER PHASE (CHILLERS AT 3.3 PER PHASE | | | )?? | | | | | | 2)NOTE: PLEASE SHOW ALL CONTINUOUS LOADS | | | AT 125%. 215-3,230-42 ETC. | | | | | | 3)NOTE: PLEASE PLACE NOTE ON E-2, | | | "NO HAZARDOUS MATERIALS TO BE USED AND | | | DOES NOT MEET ANY LOCATIONS IN ART 500 | | | IN THE NEC". | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | | REVIEW. IF THERE ARE ANY QUESTIONS, | | | PLEASE CALL. | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW | | | 561-659-8096 EXT 8372 | | | | | | | | | PLEASE SEE FIRE REVIEW COMMENTS THAT | | | WILL AFFECT ELECTRICAL PLANS. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2002-11-20 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2002-11-20 |
Time |
09:34 |
Rev Time |
1.00 |
| Received By |
dpalmer |
Date |
2002-11-20 |
Time |
09:34 |
Sent To |
|
|
| Notes |
| 2002-11-20 00:00:00 | *************** UNSAT ********** | | | | | | 1)NOTE: PLEASE SEE SERVICE ENTRANCE | | | CONDUCTORS. NEED TO BE SIZED PER | | | 240-3C/ 310-16/ 110-14 | | | | | | 2)NOTE: PLEASE CLARIFY LOADS AND OCP | | | FOR AHU`S. 1&2. MAX OCP? W/ MECH PLANS | | | AND UNIT LOADS. | | | | | | 3)NOTE: PLEASE CLARIFY AND PROVIDE | | | INFORMATION FOR TYPE OF MATERIALS IN | | | GRANULATOR AREA AND MOLDING AREA. | | | PLEASE PROVIDE TYPE OF GRANUALS/GRINDING | | | PROCESS. PROVIDE CLASS/DIVISION LOCATION | | | (IF ANY). | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | | REVIEW. IF THERE ARE ANY QUESTIONS, | | | PLEASE CALL. | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW | | | 561-659-8096 EXT 8372 |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
3 |
Status |
P |
Date |
2003-02-27 |
|
|
Cont ID |
|
| Sent By |
mamini |
Date |
2003-02-27 |
Time |
08:09 |
Rev Time |
1.00 |
| Received By |
mamini |
Date |
2003-02-27 |
Time |
08:09 |
Sent To |
|
|
| Notes |
| 2003-02-27 00:00:00 | PASSED: | | | 1. SEE PERMIT # 03022041 FOR UNDERGROUND | | | UTILITIES AND SITE WORKS. | | | IF ANY QUESTIONS PLEASE CONTACT 659-8096 | | | EXT. 8492 MOHAMMAD R. AMINI |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
F |
Date |
2003-01-29 |
|
|
Cont ID |
|
| Sent By |
mamini |
Date |
2003-01-29 |
Time |
09:23 |
Rev Time |
1.00 |
| Received By |
mamini |
Date |
2003-01-29 |
Time |
09:22 |
Sent To |
|
|
| Notes |
| 2003-01-29 00:00:00 | FAILED: | | | 1. PLEASE NOTE THAT A SEPARATE PERMIT | | | APPLICATION AND FEES FOR UNDERGROUND | | | UTILITIES AND SITE WORKS IS REQUIRED. | | | 2. INDUSTRIAL WASTEWATER DISCHARGE | | | PERMIT FOR THIS FACILITY MAY BE REQUIRED | | | PLEASE CONTACT MR. RODNEY COMPO, | | | INDUSTRIAL PRETREATMENT INSPECTOR | | | FOR THE REQUIREMENT IF ANY, 837-4051 EXT | | | 4074. | | | IF ANY QUESTIONS PLEASE CONTACT 659-8096 | | | EXT. 8492 MOHAMMAD R. AMINI |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2002-11-04 |
|
|
Cont ID |
|
| Sent By |
mamini |
Date |
2002-11-04 |
Time |
15:48 |
Rev Time |
2.00 |
| Received By |
mamini |
Date |
2002-11-04 |
Time |
15:48 |
Sent To |
|
|
| Notes |
| 2002-11-04 00:00:00 | FAILED: | | | 1. PLEASE NOTE THAT A SEPARATE PERMIT | | | APLICATION AND FEES FOR UNDERGROUND | | | UTILITIES AND SITE WORKS IS REQUIRED. | | | 2. ALL DRIVEWAY APPROACHES MUST BE AT | | | MIN. PER CITY OF WEST PALM BEACH' | | | STANDARD. | | | 3. BACKFLOW PREVENTERS AND ALL THE | | | CONNECTIONS TO CITY SERVICES MUST BE PER | | | CITY' STANDARD AND APPROVED BY THE | | | PUBLIC UTILITIES ENGINEERING DEPARTMENT, | | | 659-8040, MR. MANNY GONZALEZ | | | 4. PLEASE PROVIDE STORM WATER CALC., | | | CALCULATIONS SHOULD INCLUDE PERVIOUS & | | | IMPERVIOUS AREA. | | | IF ANY QUESTIONS PLEASE CONTACT 659-8096 | | | EXT. 8492 MOHAMMAD R. AMINI |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
4 |
Status |
P |
Date |
2003-05-13 |
|
|
Cont ID |
|
| Sent By |
nmccray |
Date |
2003-05-13 |
Time |
14:46 |
Rev Time |
0.00 |
| Received By |
nmccray |
Date |
2003-05-13 |
Time |
14:46 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2003-03-28 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2003-03-28 |
Time |
10:18 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2003-03-28 |
Time |
10:18 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
F |
Date |
2003-02-06 |
|
|
Cont ID |
|
| Sent By |
nmccray |
Date |
2003-02-06 |
Time |
09:45 |
Rev Time |
0.00 |
| Received By |
nmccray |
Date |
2003-02-04 |
Time |
09:45 |
Sent To |
|
|
| Notes |
| 2003-02-06 00:00:00 | 1) NEED EXIT SIGN OVER DOORS LEADING TO | | | RECEIVING ROOM FROM MOLDING AREA ROOM. | | | | | | 2) NO INFORMATION ON OCCUPANT LOAD FOR | | | THE 1ST AND 2ND FLOORS | | | | | | 3) NO DETAIL ON SPIRAL STAIRS. | | | | | | 4) PLEASE REFER TO 2000 NFPA 101 LIFE | | | SAFETY CODE CHAPTER 8.4.1.1 ON | | | SEPARATION. | | | | | | NATE MCCRAY, CAPTAIN | | | 659-8096, EXT 8497 | | | 835-2910 |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2002-11-21 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2002-11-21 |
Time |
13:58 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2002-11-21 |
Time |
13:58 |
Sent To |
|
|
| Notes |
| 2002-11-21 00:00:00 | 1) PLEASE INDICATE WHAT TYPE OF | | | CHEMICALS IF ANY WILL BE STORED IN | | | THE BUILDING. | | | | | | 2) PLEASE INDICATE PROPOSED OCCUPANT | | | LOADS FOR THE FIRST AND SECOND FLOORS. | | | PLEASE BE ADVISED THAT CERTAIN | | | RESTRICTIONS APPLY TO SPIRAL STAIRS. | | | | | | 3) PLEASE INDICATE INTERIOR FINISH | | | CLASSIFICATIONS FOR WALLS AND | | | CEILINGS. | | | | | | 4) BUILDING ADDRESS REQUIRED ON | | | BUILDING. | | | | | | 5) PLEASE PROVIDE MORE DETAILS ON | | | SPIRAL STAIR. | | | | | | 6) ARE THERE ANY FIRE SPRINKLERS | | | PLANNED FOR THE BUILDING. IF NONE | | | ARE PLANNED, PROPER FIRE SEPARATIONS | | | ARE REQUIRED BETWEEN WAREHOUSE AND | | | BUSINESS. PLEASE PROVIDE DETAILS. | | | | | | 7) THE SITE PLAN INDICATES A 13' WIDE | | | DRIVE WITH 6" CURBS. ALTHOUGH FIRE | | | RESCUE CAN USE A 13' WIDE DRIVE, IT | | | WOULD BE OPTIMUM TO INCREASE THE | | | SIZE OF THE INTERIOR ROAD. | | | | | | MIKE CARSILLO, ASSISTANT FIRE MARSHAL | | | 659-8096,EXT.8497 | | | 835-2910 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
7 |
Status |
N |
Date |
2004-02-03 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2004-02-03 |
Time |
16:31 |
Rev Time |
0.00 |
| Received By |
csiegber |
Date |
2004-02-03 |
Time |
16:31 |
Sent To |
M |
|
| Notes |
| 2004-02-03 00:00:00 | TO PK BOX/SUBMITTAL |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
6 |
Status |
N |
Date |
2003-05-12 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-05-12 |
Time |
11:53 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-05-12 |
Time |
11:53 |
Sent To |
|
|
| Notes |
| 2003-05-12 00:00:00 | COMM BOARD #11 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2003-04-04 |
|
|
Cont ID |
|
| Sent By |
shernand |
Date |
2003-04-04 |
Time |
15:30 |
Rev Time |
0.00 |
| Received By |
shernand |
Date |
2003-04-04 |
Time |
15:30 |
Sent To |
|
|
| Notes |
| 2003-04-04 00:00:00 | HP DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2003-03-18 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2003-03-18 |
Time |
12:17 |
Rev Time |
0.00 |
| Received By |
btrobaug |
Date |
2003-03-18 |
Time |
12:17 |
Sent To |
|
|
| Notes |
| 2003-03-18 00:00:00 | COMM BOARD #47./WRT |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2003-03-12 |
|
|
Cont ID |
|
| Sent By |
sthyng |
Date |
2003-03-12 |
Time |
14:56 |
Rev Time |
0.00 |
| Received By |
sthyng |
Date |
2003-03-12 |
Time |
14:56 |
Sent To |
|
|
| Notes |
| 2003-03-12 00:00:00 | PERMIT APP NOT WITH PACKAGE, CALLED | | | CONTRACTOR, SPOKE WITH GAIL - SHE | | | WILL TRACK DOWN AND SEND - ST |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2003-01-17 |
|
|
Cont ID |
|
| Sent By |
sgraham |
Date |
2003-01-28 |
Time |
14:05 |
Rev Time |
0.00 |
| Received By |
btrobaug |
Date |
2003-01-16 |
Time |
18:12 |
Sent To |
Z |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2002-11-01 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2002-11-01 |
Time |
09:34 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2002-11-01 |
Time |
10:11 |
Sent To |
|
|
| Notes |
| 2002-11-04 00:00:00 | TO COMM BOARD. | | | FROM ZONING/MIKE SNACHEZ 11/1 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
4 |
Status |
P |
Date |
2004-02-06 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2004-02-06 |
Time |
15:08 |
Rev Time |
0.45 |
| Received By |
pkrauss |
Date |
2004-02-06 |
Time |
15:08 |
Sent To |
|
|
| Notes |
| 2004-02-06 00:00:00 | PROVISO: | | | PLEASE NOTE THE LOCATION OF CU-1 IN | | | RELATION TO THE 600 CFM FRESH AIR | | | INTAKE.EXHAUST AIR SHALL BE LOCATED | | | AS TO NOT RECIRCULATE BACK INTO FRESH | | | AIR INTAKE PER 2001 FBC(M) 501.3. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | | CONTACT PATTY KRAUSS AT (561) 805-6719. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | 0 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
P |
Date |
2003-03-19 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2004-02-03 |
Time |
16:31 |
Rev Time |
0.45 |
| Received By |
pkrauss |
Date |
2003-03-18 |
Time |
16:35 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2003-02-07 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2003-02-07 |
Time |
11:24 |
Rev Time |
0.35 |
| Received By |
pkrauss |
Date |
2003-02-07 |
Time |
09:43 |
Sent To |
|
|
| Notes |
| 2003-02-07 00:00:00 | PROVISO: | | | | | | PROVIDE CALCULATIONS FOR THE RECEIVING | | | AREA.INDICATE MAKE UP AIR. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | | CONTACT PATTY KRAUSS AT 659-8096 | | | EXT. 8388. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2002-11-21 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2002-11-21 |
Time |
10:08 |
Rev Time |
0.45 |
| Received By |
pkrauss |
Date |
2002-11-21 |
Time |
10:08 |
Sent To |
|
|
| Notes |
| 2002-11-21 00:00:00 | PLEASE PROVIDE ADDITIONAL INFORMATION ON | | | THE TYPE OF PROCESS THAT WILL TAKING | | | PLACE I.E., WHAT CHEMICALS (IF ANY) ARE | | | INVOLVED, WHAT IS BEING STORED IN THE | | | STORAGE AREA, WHAT TYPE OF "PROCESS" | | | WILL BE DONE. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | | CONTACT PATTY KRAUSS AT 659-8096 | | | EXT. 8388. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2003-03-22 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2003-03-22 |
Time |
09:36 |
Rev Time |
0.75 |
| Received By |
kstevens |
Date |
2003-03-22 |
Time |
09:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2003-01-31 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2003-01-31 |
Time |
08:13 |
Rev Time |
1.50 |
| Received By |
kstevens |
Date |
2003-01-30 |
Time |
18:20 |
Sent To |
|
|
| Notes |
| 2003-01-31 00:00:00 | DENIED | | | REFERENCE: FBC-2001 PLUMBING | | | FBC-2001 CHAPTER 11 | | | | | | 1) FROM PREVIOUS REVIEW, SHT A2 SHOWER | | | ROOM, SHOWER SHALL COMPLY WITH 11-4.21 | | | AND ALL SUBSECTIONS. PLEASE SHOW DETAILS | | | ALSO ROOM SHALL REQUIRE A 5' TURNING | | | RADIUS. | | | 2) SHT A2 TURNING RADIUS IS REQUIRED IN | | | MEN'S TOILET ROOM, AND NOT REQUIRED IN | | | STALL. | | | 3) FROM PREVIOUS REVIEW, SHT P-1 WATER | | | ISOMETRIC, WATER HAMMER ARRESTORS REQD. | | | IN SECTION 604.9 SHALL BE LOCATED NEAR | | | FIXTURES IN AN "EFFECTIVE RANGE" NOT IN | | | THE CEILING AT TOP OF DROP AS SHOWN. | | | PDI-WH 201 AND MANUF. INSTALLATION INST. | | | 4) FROM PREVIOUS REVIEW, SHT P-1 WATER | | | HEATER DETAIL, THERMAL EXPANSION CONTROL | | | REQUIRED PER SECTION 607.3 & 607.3.2. | | | 5) FROM PREVIOUS REVIEW, SHT P-2 PLEASE | | | SHOW LOCATION FOR SCUPPER DRAINS. SHOW | | | SIZE OF EACH SCUPPER DRAIN AND SQUARE | | | FOOTAGE BEING DRAIN THRU EACH SCUPPER. | | | 6) FROM PREVIOUS REVIEW, SHT P-3 MATER- | | | IALS AND EQUIPMENT (L) & EXECUTION OF | | | WORK (F) AIR CHAMBERS ARE NOT APPROVED. | | | PLEASE DELETE REFERENCES> | | | | | | REVIEW BY KEN STEVENS | | | (561) 659-8096 EXT 8377 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2002-12-03 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2002-12-03 |
Time |
15:22 |
Rev Time |
3.00 |
| Received By |
kstevens |
Date |
2002-12-03 |
Time |
15:22 |
Sent To |
|
|
| Notes |
| 2002-12-03 00:00:00 | DENIED | | | REFERENCE: FBC-2001 PLUMBING | | | FBC-2001 CHAPTER 11 | | | FBVC-2001 BUILDING | | | | | | 1) SHT A2 PLEASE PROVIDE CALCULATIONS | | | FOR MINIMUM FACILITIES PER TABLE 1003.1 | | | FBC-BLDG AND 403.1 FBC-PLMG. | | | 2) SHT A2 IF TOILET ROOMS ARE PROVIDED, | | | THEN EACH PUBLIC AND COMMON USE TOILET | | | ROOM SHALL COMPLY WITH 11-4.22. SEC. | | | 11-4.1.3(11) | | | 3) SHT A2 MENS REST ROOM, IF TOILET | | | STALLS ARE PROVIDED, THEN AT LEAST ONE | | | SHALL BE A STANDARD STALL COMPLYING WITH | | | 11-4.17 PER 11-4.22.4. SEE 11-4.17.3 FOR | | | SIZE AND ARRANGEMENT. LAV REQUIRED IN | | | STALL. | | | 4) SHT A2 SHOWER ROOM, SHOWER SHALL COM- | | | PLY WITH 11-4.21 AND ALL SUBSECTIONS. | | | SHOW DETAIL. | | | 5) SHT A2 EMPLOYEE'S LOUNGE, SINK SHALL | | | COMPLY WITH 11-4.24 AND ALL SUBSECTIONS. | | | PLEASE SHOW DETAILS. | | | 6) SHT A2 DRINKING FOUNTAIN, SHOW DETAIL | | | FOR COMPLIANCE WITH SEC. 11-4.15 AND ALL | | | SUBSECTIONS. ALSO SEC. 11-4-1-3(10)(A) | | | FOR THOSE WHO HAVE DIFFICULTY BENDING OR | | | STOOPING. | | | 7) SHT A2 MENS REST ROOM, URNAL SHALL | | | COMPLY WITH 11-4.18 AND ALL SUBSECTIONS. | | | SHOW DETAIL. | | | 8) SHT A5 DETAIL #5 PER FBC SEC 1503.4.2 | | | OVERFLOW SCUPPERS SHALL BE A MINIMUM OF | | | 4 INCHES IN HEIGHT AND SHALL BE PLACED | | | IN WALLS OR PARAPETS WITH THE INLET FLOW | | | LINE NOT LESS THAN 2 INCHES ABOVE THE | | | ROOF SURFACE, EXCLUDING SUMPS, OR MORE | | | THAN 4 INCHES ABOVE THE ROOF SURFACE. | | | PLANS SHOW 5" TO INLET FLOW LINE. | | | 9) SHT P-1 P/T LINE FROM WATER HEATER | | | SHALL NOT BE TRAPPED. SEC 504.7.1 | | | 10) SHT P-1 WATER ISOMETRIC, WATER HAM- | | | MER ARRESTORS REQUIRED IN SEC 604.9 | | | SHALL BE LOCATED NEAR FIXTURES IN AN | | | "EFFECTIVE RANGE" NOT AT TOP OF DROP AS | | | SHOWN. PER PDI-WH 201 AND MANUF. INSTALL | | | ATION INSTRUCTIONS. | | | 11) BACKFLOW REQUIRED ON WATER SERVICE. | | | 12) SHT P-1 WATER HEATER DETAIL, THERMAL | | | EXPANSION CONTROL REQUIRED PER SEC 607.3 | | | AND 607.3.2 PLEASE ADD TO DETAIL | | | 13) SHT P-2 PLEASE SHOW LOCATION ON | | | SCUPPER DRAINS. SHOW SIZE OF EACH | | | SCUPPER DRAIN AND SQUARE FOOTAGE BEING | | | DRAINED THRU EACH SCUPPER. | | | 14) SHT P-3 MATERIALS & EQUIPMENT (L) & | | | EXECUTION OF WORK (F) AIR CHAMBERS ARE | | | NOT APPROVED. PLEASE DELETE REFERENCES. | | | | | | REVIEW BY KEN STEVENS | | | (561) 659-8096 EXT 8377 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2003-01-28 |
|
|
Cont ID |
|
| Sent By |
sgraham |
Date |
2003-01-28 |
Time |
14:04 |
Rev Time |
0.00 |
| Received By |
sgraham |
Date |
|
Time |
|
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2002-11-01 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2003-01-17 |
Time |
18:12 |
Rev Time |
1.00 |
| Received By |
lmartine |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2002-11-01 00:00:00 | | | | DRIVEWAY WIDTH SHALL BE MINIMUM 15'. | | | | | | PARKING SPACES SHALL BE AT LEAST 16' | | | IN DEPTH PLUS 2' OF OVERHANG. | | | | | | | | | | | | M SANCHEZ | | | 659-8031 |
|
|