Plan Review Details - Permit 02100865
Plan Review Stops For Permit 02100865
Review Stop E ELECTRICAL
Rev No 5 Status P Date 2003-04-01 Cont ID  
Sent By btrobaug Date 2003-04-01 Time 11:56 Rev Time 0.50
Received By btrobaug Date 2003-04-01 Time 11:39 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2003-02-26 Cont ID  
Sent By sthyng Date 2003-04-01 Time 09:50 Rev Time 0.50
Received By btrobaug Date 2003-02-26 Time 14:07 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status F Date 2003-02-12 Cont ID  
Sent By dpalmer Date 2003-02-12 Time 12:07 Rev Time 0.25
Received By dpalmer Date 2003-02-12 Time 12:07 Sent To B
Notes
2003-02-12 00:00:00****** ************* UNSAT ***********
  
 1)NOTE: PLEASE SEE ITEMS REDLINED FROM
 TWO PREVIOUS REVIEWS THAT HAVE NOT BEEN
 CORRECTED.
 NO SD IN KITCHEN, NFPA-72 8-1.4.2
 MISSING EQUIPMENT GRND FROM MAIN DISC
 TO PANEL. SIZE PER 250-122
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-659-8096 EXT 8372

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2002-12-19 Cont ID  
Sent By kstevens Date 2003-02-08 Time 14:06 Rev Time 0.50
Received By dpalmer Date 2002-12-19 Time 12:38 Sent To  
Notes
2002-12-19 00:00:00RE-STAMP.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2002-11-01 Cont ID  
Sent By dpalmer Date 2002-11-01 Time 06:53 Rev Time 0.50
Received By dpalmer Date 2002-11-01 Time 06:53 Sent To B
Notes
2002-11-01 00:00:00********** NOTES REDLINED ********
  
 SD NOT PERMITTED IN KITCHEN. NFPA-72
 8-1.4.1.6
 MISSING EQUIP GRND. 250-122 (SERVICE )

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-04-01 Cont ID  
Sent By sthyng Date 2003-04-01 Time 09:50 Rev Time 0.00
Received By sthyng Date 2003-03-31 Time 09:50 Sent To E
Notes
2003-04-01 00:00:00RESTAMP - TO BT DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-01-31 Cont ID  
Sent By btrobaug Date 2003-01-31 Time 17:31 Rev Time 0.00
Received By btrobaug Date 2003-01-31 Time 17:30 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2002-12-13 Cont ID  
Sent By btrobaug Date 2002-12-13 Time 17:11 Rev Time 0.00
Received By btrobaug Date 2002-12-13 Time 17:11 Sent To R
Notes
2002-12-13 00:00:00TO ROB M./WRT.

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2003-04-09 Cont ID  
Sent By pkrauss Date 2003-04-09 Time 14:03 Rev Time 0.15
Received By pkrauss Date 2003-04-09 Time 14:03 Sent To R
Notes
2003-04-09 00:00:00RE-STAMP

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2003-02-08 Cont ID  
Sent By kstevens Date 2003-04-03 Time 18:30 Rev Time 0.50
Received By hmoser Date 2003-02-08 Time 13:13 Sent To P
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2002-10-28 Cont ID  
Sent By btrobaug Date 2003-01-31 Time 17:31 Rev Time 0.33
Received By jleech Date 2002-10-28 Time 17:02 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 4 Status P Date 2003-04-03 Cont ID  
Sent By kstevens Date 2003-04-03 Time 18:29 Rev Time 0.25
Received By kstevens Date 2003-04-03 Time 18:29 Sent To M
Notes
2003-04-03 00:00:00RESTAMP

Review Stop P PLUMBING
Rev No 3 Status P Date 2003-02-08 Cont ID  
Sent By btrobaug Date 2003-04-01 Time 11:56 Rev Time 0.50
Received By kstevens Date 2003-02-08 Time 14:06 Sent To E
Notes
2003-02-08 00:00:00REVISION OK - CHANGED LOCATION OF WATER
 HEATER

Review Stop P PLUMBING
Rev No 2 Status P Date 2002-12-20 Cont ID  
Sent By hmoser Date 2003-02-08 Time 13:13 Rev Time 0.25
Received By kstevens Date 2002-12-20 Time 17:15 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2002-10-28 Cont ID  
Sent By jleech Date 2002-10-28 Time 17:02 Rev Time 0.33
Received By jleech Date 2002-10-28 Time 17:02 Sent To  
Notes
2002-10-28 00:00:00PROVISO;
 REVISED RISER DIAGRAM REQUIRED.
  
 MASTER BATHROOM SHALL COMPLY WITH SEC.
 909.1. ONLY THE FIXTURES WITHIN THE
 BATHROOM GROUP SHALL CONNECT TO THE WET
 VENTED HORIZONTAL BRANCH DRAIN.

Review Stop R ROOF PLAN REVIEW
Rev No 4 Status P Date 2003-04-09 Cont ID  
Sent By rmcdouga Date 2003-04-09 Time 16:31 Rev Time 1.00
Received By rmcdouga Date   Time   Sent To  
Notes
2003-04-09 00:00:00RESTAMP

Review Stop R ROOF PLAN REVIEW
Rev No 3 Status P Date 2003-02-13 Cont ID  
Sent By pkrauss Date 2003-04-09 Time 14:04 Rev Time 1.00
Received By rmcdouga Date   Time   Sent To  
Notes
2003-02-13 00:00:00BUILDING PROVISO
  
 1) THE LOCATION OF THE AIR HANDLER
 SUSPENDED FROM THE TRUSS IS TO BE
 SUPPLIED TO THE TRUSS ENGINEER FOR
 APPROVAL.

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status P Date 2002-12-23 Cont ID  
Sent By rmcdouga Date 2002-12-20 Time 15:23 Rev Time 4.00
Received By rmcdouga Date   Time   Sent To  
Notes
2002-12-20 00:00:00BUILDING PROVISO
  
 1) PROVIDE A SOIL TEST REPORT INDICATING
 THE SAFE BEARING CAPACITY OF THE SOIL
 THAT IS SIGNED AND SEALED BY A FL SOIL
 ENGINEER PRIOR TO POURING FOUNDATION PER
 L. HATTEN. SEE CITY OF WPB AMENDMENTS TO
 FBC 1804.2.2.
  
 2) PROVIDE SIGNED AND SEALED SHOP
 DRAWINGS OF GUARDRAILS AT EXTERIOR
 BALCONY PRIOR TO INSTALLATION.
  
 3)PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR:
 - DOUBLE OUTSWING FRENCH DOORS ( THE
 DRAWINGS THAT WERE SUBMITTED HAVE NOA
 NOS. THAT DIFFER FROM THE COVER SHEET)
  
 4) PROVIDE THE LISTING INFORMATION AND
 MANUFACTURER'S SPECIFICATIONS FOR THE
 ONE HOUR FIRE GLASS BLOCK ASSEMBLY.
  
 5) SUBMIT A REVISED STORM PANEL
 INSTALLATION SCHEDULE INDICATING THE
 PROPER FASTENERS FOR ATTACHMENT TO THE
 SECOND FLOOR WOOD FRAME.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2002-11-20 Cont ID  
Sent By btrobaug Date 2002-12-13 Time 17:12 Rev Time 4.00
Received By rmcdouga Date   Time   Sent To  
Notes
2002-11-20 00:00:00BUILDING DENIED
  
 1) IMPACT FEES MUST BE PAID TO PALM
 BEACH COUNTY, PLANS STAMPED BY THEM AND
 COPY OF RECEIPT SUBMITTED TO CITY OF
 WEST PALM BEACH BUILDING DEPARTMENT,
 BEFORE A BUILDING PERMIT CAN BE ISSUED.
  
 2) A RECORDED COPY OF THE NOTICE OF
 COMMENCEMENT MUST BE SUBMITTED BEFORE A
 PERMIT CAN BE ISSUED.
  
 3) FL BLD CODE 1804.2.2 QUESTIONABLE
 SOILS, WHERE THE BEARING CAPACITY IS
 NOT DEFINETLY KNOWN OR IS IN QUESTION.
 PROVIDE SIGNED AND SEALED COPY OF SOILS
 REPORT FROM SOILS ENGINEER.
  
 4) PROVIDE (2) PRODUCT APPROVALS, KEY
 PLANS AND INSTALLATION SCHEDULES
 INDICATING THE SPECIFIC TYPES OF ANCHORS
 TO BE USED FOR STORM PANELS.
  
 5) GLASS BLOCK ON THE ZERO LOT LINE IS
 REQUIRED TO HAVE A ONE HOUR FIRE
 RESISTANCE. PROVIDE MANUFACTURES
 SPECIFICATIONS AND LISTING INFORMATION
 FOR A ONE HOUR FIRE RATED GLASS BLOCK
 ASSEMBLY. REVISE GLASS BLOCK DETAIL ON
 A5 TO COMPLY WITH ONE HOUR FIRE RATED
 INSTALLATION.
  
 6) THE EXTERIOR WALL AT ZERO LOT LINE IS
 REQUIRED TO HAVE A CALCULATED FIRE
 RESISTANCE OF ONE HOUR ASSUMING EITHER
 SIDE OF THE WALL TO BE EXPOSED TO FIRE.
 THE SECOND FLOOR WOOD FRAME WALL DOES
 NOT COMPLY.
  
 7)ON C1,#11 OF PLAN NOTES SAYS HURRICANE
 SHUTTERS ARE REQUIRED IN HVHZ. CITY OF
 WPB IS NOT IN HVHZ, HOWEVER, IMPACT
 PROTECTION IS REQUIRED. PLEASE REVISE.
  
 8) ON C1, FRAMING NOTE #15 SPECIFIES
 FASTENER SPACING OF 6" O.C., ASTM C 1063
 REQUIRES 3/8" RIB METAL LATH TO BE
 FASTENED AT EACH RIB (4").
  
 9) INDICATE THE LOCATION AND MATERIALS
 USED TO PROVIDE DRAFTSTOPPING AT AREAS
 GREATER THAN 500 SQFT IN FLOOR/CEILING
 ASSEMBLIES. FBC 2305.2.2
  
 10) THE CITY OF WPB AMENDMENTS TO FBC
 SECTION 2111.1.9 REQUIRES A 1.5 INCH
 RECESS (WATER STOP) WHERE EXTERIOR WALL
 CMU BEAR ON A CONCRETE FLOOR SURFACE.
 PLEASE REVISE DETAILS ON A1 & A6.
  
 11) THERE IS NO F12 FOOTING INDICATED IN
 THE FOOTING SCHEDULE ON A1.
  
 12) THE MEASUREMENT DESIGNATIONS (FEET
 & INCHES) ARE NOT INDICATED FOR SOME OF
 THE DIMENSIONS LISTED IN THE FOOTING
 SCHEDULE ON A1.
  
 13) CITY AMENDMENTS TO THE FBC TABLE
 2306.1 REQUIRE RING SHANK NAILS IN ZONE
 3 WHEN THE MEAN ROOF HEIGHT IS 25' OR
 MORE. PLEASE REVISE.
  
 14) FBC 2309.6 REQUIRES ACCESS TO ATTIC
 SPACE, WHEN THE CLEAR ATTIC SPACE AT THE
 PEAK IS 24 INCHES. INDICATE ATTIC ACCESS
 OPENINGS TO ANY OF THE LOWER ROOF ATTICS
 THAT MEET THIS CRITERIA.
  
 15) PROVIDE DETAILS OF ATTACHMENT OF
 BALCONY RAILS INDICATING THAT THEY ARE
 ADEQUATE IN STRENGTH, DURABILITY AND
 ATTACHMENT AS REQUIRED BY FBC 1608.2.
  
 16) INDICATE FIREBLOCKING MATERIAL AND
 LOCATIONS AT STAIRS AS REQUIRED BY FBC
 SECTION 2305.1.4.
  
 17) DETAIL 8 ON A7 IS INDICATED ON THE
 FRAMING PLAN AT THE WRONG LOCATIONS IN
 TWO INSTANCES. PLEASE CORRECT.
  
 18) DETAIL 8 ON A7 INDICATES 3-1/4"
 HILTI-PINS WITH 4" EMBED. PLEASE
 CLARIFY.
  
 19) DETAIL 9 ON A7 IS SHOWN ON THE PLAN
 AT THE WRONG LOCATION. PLEASE CORRECT.
  
 20) DETAIL 13 ON A7 IS NOT INDICATED ON
 THE FRAMING PLAN.
  
 21) DETAIL 11A ON A7 IS INDICATED ON THE
 FRAMING PLAN AND THERE IS NO DETAIL
 GIVEN.
  
 22) DETAIL 12 ON A8 IS INDICATED ON THE
 FRAMING PLAN ON A7, BUT THERE IS NO
 DETAIL 12 GIVEN ON SHEET A8.
  
 23) PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR:
 - HORIZONTAL STRUCTURAL MULLIONS
 (ONES SUBMITTED ARE FOR VERTICAL
 APPLICATIONS ONLY)
 - ROOFING MATERIALS
 - OVERHEAD GARAGE DOORS
 - FRENCH DOORS (WITH GLAZING IN DOORS)
  
 24) PROVIDE THE TEST REPORTS FOR IMPACT
 RESISTIBILITY FOR THE EXTERIOR DOORS AS
 REQUIRED BY GENERAL NOTES ON THE SITE
 SPECIFIC PRODUCT SUBMITTAL FORMS.
  
 25) THE SITE SPECIFIC PRODUCT APPROVAL
 SUBMITTAL FORMS ARE REQUIRED TO BE
 SIGNED AND SEALED BY THE DESIGNER OF
 RECORD OF THE STRUCTURE.
  
 PLEASE INSERT NEW SHEETS INTO PLANS AND
 REMOVE OLD ONES. PLEASE RETURN OLD
 SHEETS WITH RESUBMITTAL IN ORDER TO
 EXPEDITE PLAN REVIEW.
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)659-8096 EXT.8202

Review Stop Z ZONING
Rev No 1 Status P Date 2002-10-18 Cont ID  
Sent By sgraham Date 2002-10-18 Time 08:43 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
***NONE***