| 2002-10-07 00:00:00 | THIS PERMIT IS SUBJECT TO THE FOLLOWING |
| | PROVISIONS: |
| | |
| | 1SHEET T-2 DECLARES THE NYC BUILDING |
| | CODE.PROVIDE A SIGNED AND SEALED |
| | STATEMENT THAT THE DESIGN IS IN |
| | ACCORDANCE WITH THE FLORIDA BUILDING |
| | CODE, 2001 EDITION. |
| | |
| | |
| | 2SHEET T-2 DECLARES DESIGN TO ACI |
| | 318-89.PLEASE REVISE AND INSURE |
| | COMPLIANCE WITH ACI-99. |
| | |
| | 3SHEET A-3, NOTE #3,SPECIFY THE AMOUNT |
| | OF TENSION THAT WILL BE APPLIED TO THE |
| | CABLES. |
| | |
| | 4PROVIDE A SIGNED AND SEALED COPY OF |
| | THE "TECHNICAL SPECIFICATION MANUAL" |
| | CALLED OUT ON SHEET T-1 AS BEING "PART |
| | OF THIS PROJECT" |
| | |
| | 5SPECIFY WHICH EIFS SYSTEM IS TO BE |
| | USED AND THE REFERENCE NUMBER FOR |
| | PRODUCT ACCEPTANCE FROM A RECOGNIZED |
| | TESTING LABORATORY OR CODE AGENCY. |
| | |
| | 6WHAT IS MEANT BY THE TERM |
| | "DEDEFINED"AS IN LOOSE CABLES SHALL BE |
| | DEDEFINED? |
| | |
| | 7 SECTIONS 5/A9 & 9/A9.PROVIDE |
| | SPECIFIC FASTENER AND CONNECTION |
| | METHODS FOR THE BENT PLATE CONNECTION |
| | TO THE MASONRY AND TO THE METAL STUDS. |
| | |
| | 8IF THE BENT PLATES ARE TO FASTEN |
| | EVERY OTHER STUD TO THE BUILDING, HOW |
| | ARE THE INTERMEDIATE STUDS SUPPORTED? |
| | |
| | 9SPECIFY THE 1/2 INCH EXTERIOR SHEATH |
| | ING TO BE USED AND THE FASTENING METHOD. |
| | |
| | 10THE PLANS REFENCE "GROUT" IN SEVERAL |
| | PLACES.SPECIFY THE INTENDED DESIGN |
| | STRENGTH. |
| | |
| | 11SECTION 1/A-10, SPECIFY THE WELDS |
| | AND GROUT STRENGTH TO BE USED. |