Plan Review Details - Permit 02100041
Plan Review Stops For Permit 02100041
Review Stop E ELECTRICAL
Rev No 3 Status P Date 2003-01-06 Cont ID  
Sent By dpalmer Date 2003-01-06 Time 20:06 Rev Time 50.00
Received By dpalmer Date 2003-01-06 Time 20:06 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2002-12-19 Cont ID  
Sent By dpalmer Date 2002-12-19 Time 13:05 Rev Time 0.25
Received By dpalmer Date 2002-12-19 Time 13:05 Sent To P
Notes
2002-12-19 00:00:00NOTES REDLINED.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2002-10-24 Cont ID  
Sent By dpalmer Date 2002-10-24 Time 06:15 Rev Time 0.25
Received By dpalmer Date 2002-10-24 Time 06:15 Sent To B
Notes
2002-10-24 00:00:00NOTES REDLINED FOR 210-52D

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-01-30 Cont ID  
Sent By btrobaug Date 2003-01-30 Time 13:00 Rev Time 0.00
Received By btrobaug Date 2003-01-30 Time 12:59 Sent To B
Notes
2003-01-30 00:00:00TO ROB M./WRT

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2002-12-13 Cont ID  
Sent By btrobaug Date 2002-12-13 Time 17:08 Rev Time 0.00
Received By btrobaug Date 2002-12-13 Time 17:08 Sent To R
Notes
2002-12-13 00:00:00ROB M./WRT.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2002-10-19 Cont ID  
Sent By jleech Date 2002-10-19 Time 08:34 Rev Time 0.33
Received By jleech Date 2002-10-19 Time 08:34 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status P Date 2003-01-29 Cont ID  
Sent By kstevens Date 2003-01-29 Time 14:13 Rev Time 0.50
Received By kstevens Date 2003-01-29 Time 14:13 Sent To  
Notes
2003-01-29 00:00:00REVISION OK - SANT. RISER DIAGRAM

Review Stop P PLUMBING
Rev No 2 Status P Date 2003-01-14 Cont ID  
Sent By dpalmer Date 2003-01-06 Time 20:06 Rev Time 0.33
Received By rmcdouga Date 2003-01-13 Time 18:02 Sent To R
Notes
2003-01-13 00:00:00PASSED/PROVISO
  
 BATH #3 SHOWER MISSING FROM SANITARY
 RISER DIAGRAM. REVISIONREQUIRED
 PASSED/PROVISO
  
 BATH #3 SHOWER NOT SHOWN ON SANITARY
 RISER DIAGRAM. REVISION REQUIRED.

Review Stop P PLUMBING
Rev No 1 Status P Date 2002-10-19 Cont ID  
Sent By dpalmer Date 2002-12-19 Time 13:05 Rev Time 0.25
Received By jleech Date 2002-10-19 Time 08:34 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 4 Status P Date 2003-01-31 Cont ID  
Sent By rmcdouga Date 2003-01-31 Time 12:30 Rev Time 1.00
Received By rmcdouga Date   Time   Sent To  
Notes
2003-01-31 00:00:00REVISION TO ENCLOSE INTERIOR OPENING
 BETWEEN FAMILY ROOM AND LIBARARY IS OK
 1-31-02 RM

Review Stop R ROOF PLAN REVIEW
Rev No 3 Status P Date 2003-01-14 Cont ID  
Sent By rmcdouga Date 2003-01-14 Time 13:23 Rev Time 4.00
Received By rmcdouga Date   Time   Sent To  
Notes
2003-01-14 00:00:00BUILDING PROVISO
  
 1) PROVIDE A SOIL TEST REPORT PER CITY
 OF WPB AMENDMENTS TO THE FBC 1804.2.2.
 PRIOR TO POURING FOUNDATION.
  
 2)PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR GLAZED SINGLE OUTSWING
 FRENCH DOOR AT MASTER BEDROOM WITH
 DESIGN PRESSURES GREATER THAN +46 AND
 -60.4 PSF.

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status F Date 2002-12-24 Cont ID  
Sent By rmcdouga Date 2002-12-23 Time 17:06 Rev Time 4.00
Received By rmcdouga Date   Time   Sent To  
Notes
2002-12-23 00:00:00BUILDING DENIED
  
 1) IMPACT FEES MUST BE PAID TO PALM
 BEACH COUNTY, PLANS STAMPED BY THEM AND
 COPY OF RECEIPT SUBMITTED TO CITY OF
 WEST PALM BEACH BUILDING DEPARTMENT,
 BEFORE A BUILDING PERMIT CAN BE ISSUED.
  
 2) A RECORDED COPY OF THE NOTICE OF
 COMMENCEMENT MUST BE SUBMITTED BEFORE A
 PERMIT CAN BE ISSUED.
  
 3) PROVIDE A SOIL TEST REPORT PER CITY
 OF WPB AMENDMENTS TO THE FBC SECTION
 1804.2.2.
  
 4) PLEASE REVISE CONSTRUCTION TYPE ON
 A4 TO TYPE VI.
  
 5) SPECIFY THAT THE WWM FOR THE SLAB IS
 TO BE SUPPORTED AT A MAXIMUM OF 3 FEET
 PER FBC 1909.3.
  
 6)FL. BLD CODE 1606.1.7 THE FOLLOWING
 INFORMATION RELATED TO WIND SHALL BE
 SHOWN ON THE CONSTRUCTION DRAWINGS,
 1)- BASIC WIND SPEED, MPH
 2)- WIND IMPORTANCE FACTOR, & BUILDING
 CATEGORY
 3)- WIND EXPOSURE
 4)- INTERNAL PRESSURE COEFFICIENT,
 5)- COMPONENTS & CLADDING, THE DESIGN
 WIND PRESSURES IN TERMS OF PSF.
  
 7) SPECIFY ONE HOUR FIRE RATED GLASS
 BLOCK IS REQUIRED AT ZERO LOT LINE.
 REVISE GLASS BLOCK DETAIL TO SHOW A FIRE
 RATED ASSEMBLY.
  
 8) PROVIDE A DETAIL OF THE 4X8 LINTEL
 ASSEMBLY AT ENTRY.
  
 9) SPECIFY THAT THE GLASS BLOCK IN THE
 MASTER BATH IS REQUIRED TO HAVE A MIN.
 UNIFORM FACE THICKNESS OF 0.25 INCH.
  
 10) INDICATE THE TYPE WELD, THICKNESS OF
 THE STEEL, ETC. FOR THE 2" STEEL HEADER
 IN THE DETAIL ON A8.
  
 11) PROVIDE CALCULATIONS INDICATING THAT
 THE REQUIRED NET FREE VENTILATING AREA
 IS BEING PROVIDED. FBC 2309.7
  
 12) SPECIFY THE SIZE OF THE WASHERS USED
 ON THE TAPCON FASTENERS FOR THE GARAGE
 DOOR BUCKS ON A8.
  
 13) REVISE THE SWING DOOR BUCK DETAIL ON
 A8 TO COMPLY WITH FBC 1707.4.4.2.
  
 14) PROVIDE A STRUCTURAL DETAIL OF THE
 3" DIAMETER STEEL BOLLARD IN THE GARAGE.
  
 15) SPECIFY ON THE PLANS THAT THE DOOR
 BETWEEN THE GARAGE AND THE CONDITIONED
 SPACE IS A SOLID CORE AS REQUIRED BY
 FBC CHAPTER 13.
  
 16) PROVIDE SPECIFICATIONS AND LISTING
 INFORMATION FOR THE ONE HOUR FIRE RATED
 GLASS BLOCK ASSEMBLIES.
  
 17) PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR:
 - SINGLE FRENCH DOOR WITH DESIGN
 PRESSURES OF +46 & - 60.4 PSF
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)659-8096 EXT.8202

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2002-11-07 Cont ID  
Sent By btrobaug Date 2002-12-13 Time 17:08 Rev Time 2.00
Received By rmcdouga Date   Time   Sent To  
Notes
2002-11-07 00:00:00BUILDING DENIED
  
 SAME COMMENTS AS PERMIT #02100043.

Review Stop Z ZONING
Rev No 1 Status P Date 2002-10-07 Cont ID  
Sent By sgraham Date 2002-10-07 Time 09:28 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved