| 2002-09-17 00:00:00 | CHECKLIST: |
| | 1-PROVIDE ENGINEERING ANALYSIS/CALCS |
| | SHOWING HOW FLOOR AND ROOF DIAPHRAGMS |
| | TRANSFER ALL LOADS CONSIDERING THE |
| | DOUBLE CEILING AREA AND THE PARTIAL |
| | FL. DIAPHRAGM SUPPORTED ON WD COLUMNS |
| | WITH TOP AND BOTTOM CONNECTORS THAT |
| | DON'T TRANSFER RESIST LATERAL LOADS. |
| | SEC. 1606.2.4 FBC 2001 & SEC 104.2.1.2 |
| | CITY AMENDMENTS TO FBC 2001. |
| | 2-NEED RECORDED NOTICE OF COMMENCEMENT. |
| | 3-PROVIDE COMPLETE/CORRECT INFORMATION |
| | FOR STORM SHUTTERS. |
| | 4-PROVIDE PRODUCT APPROVAL FOR GARAGE |
| | SIDE DOOR AND PRODUCT APPROVAL WITH |
| | LEGIBLE DRAWINGS FOR GARAGE DOORS. |
| | 5-SPECIFY FIREBLOCKING MATERIAL AND LO- |
| | CATION AT STAIRS. SEE SEC. 2305.1.4. |
| | 6-PROVIDE GENERAL SPECIFICATIONS FOR |
| | REQUIRED FIREBLOCKING AT ALL CONCEALED |
| | SPACES. SEE SEC. 2305.1.4 FBC 2001. |
| | 7-SHEET C-1: REVISE FOUNDATION NOTE. USE |
| | 0.006 MIL VISQUEEN MIN. SEC. 1909.2. |
| | 8-PROVIDE SAFETY GLASS IN WINDOW AT 1ST |
| | FLOOR BATHROOM. SEC. 2405.2 FBC 2001. |
| | 9-PROVIDE STRUCTURAL DETAIL AT RECESSED |
| | WINDOWS TO ALLOW FOR STORM SHUTTERS |
| | INSTALLATION. SEE PRODUCT APPROVAL FOR |
| | LIMITATIONS AND REQUIRED ENGINEERING. |
| | 10-24SH WINDOW AT MASTER BEDROOM DOESN'T |
| | PROVIDE 24" MIN. CLEAR HT. & 5.7 S.F. |
| | MIN. CLEAR OPENING. SEC. 1005.4.4 FBC. |
| | 11-REVISE NOTE #1 ON STAIR KEY NOTES. |
| | HEIGHT OF HANDRAIL TO BE BET. 34" AND |
| | 38" HIGH MAX. SEE SEC. 1007.5.1 FBC. |
| | 12-SHEET A-7: A) SOME INFORMATION IS |
| | OVERLAPPING. B)NOTE #9: REVISE SIZE |
| | OF LEDGER. SEE 2ND FLOOR FRAMING PLAN. |
| | C)REVISE HANDRAIL HEIGHT ON STAIR |
| | SECTION AS WELL. |
| | 13-SHEET S-1: A) CLARIFY REINFORCING FOR |
| | FOOTING F5530. B) LINTEL SCHEDULE DOES |
| | NOT MATCH PLANS. REVISE AS REQUIRED. |
| | 14-SPECIFY FIRECUT REQUIREMENTS ON THE |
| | STRUCTURAL WALL SECTIONS. SEC. 2305.4. |
| | 15-REVISE TRUSS CONNECTOR SCHEDULE TO |
| | MATCH USP PUBLISHED VALUES OR PROVIDE |
| | ENGINEERED CALCS FOR DIFFERENT VALUES. |
| | 16-SHEET S-2: SECTION 1 AND SECTION 2 |
| | HAVE DIFFERENT SPECS. REVISE AS REQ'D. |
| | 17-ROOF SHEATHING & NAILING STATEMENT & |
| | DIAPHRAGM SCHEDULE HAVE DIFFERENT |
| | SPECS. CLARIFY/REVISE AS REQUIRED. |
| | 18-IDENTIFY ROOF NAILING ZONES. SEE |
| | TABLE 2306.1 CITY AMENDMENTS TO FBC. |
| | 19-SPECIFY CONNECTORS FOR GIRDER TRUSS |
| | AT GARAGE ROOF FRAMING PLAN. SECTION |
| | 104.2.1.2 CITY AMENDMENTS TO FBC 2001. |
| | 20-REVISE ENERGY CALCULATIONS: |
| | A)A/C AREA DOESN'T MATCH PLANS. |
| | B)THERE IS NOT ADJACENT FRAMING, BUT |
| | ADJACENT MASONRY. REVISE AS REQUIRED. |
| | C)OWNER/AGENT TO DATE BOTTOM OF FORM |
| | WHEN SIGNING IT. |
| | 21-SEE GARAGE DOOR PRODUCT APPROVAL FOR |
| | STRUCTURAL BUCK REQUIREMENTS & REVISE |
| | DETAIL AS REQUIRED. SPECIFY WASHER |
| | SIZE. SEC. 104.2.1.2 CITY AMENDMENTS. |
| | 22-SHEET S-1: CLARIFY TYP. DETAIL AT |
| | BOND BEAM ELEVATION CHANGE. IS IT 1#7 |
| | OR 1#5?. SEE BB SPECS. |
| | ALSO, CLARIFY REINFORCEMENT FOR PRIVA- |
| | CY WALL. IS IT 1#7 OR 2#5?. SEE FLOOR |
| | PLAN AND SECTION 6. |
| | 23-SHEET A-2: UPDATE PLUMBING NOTE. USE |
| | FPC 2001, NOT SBC 1994. |
| | 24-SPECIFY SPACING FOR WWM SUPPORTS IN |
| | CONCRETE SLAB. SEC. 1909.3 FBC 2001. |
| | 25-REVIEW ROOF FRAMING PLAN AND REVISE |
| | AS REQUIRED: SOME SPECIFIED CONNECTORS |
| | DON'T RESIST THE UPLIFT LOADS THAT |
| | WERE CALCULATED ON ROOF FRAMING PLAN. |
| | SEC. 104.2.1.2 CITY AMENDMENTS TO FBC. |