Plan Review Details - Permit 02061076
Plan Review Stops For Permit 02061076
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2002-12-26 Cont ID  
Sent By jwitmer Date 2002-12-26 Time 13:45 Rev Time 0.50
Received By jwitmer Date 2002-12-26 Time 13:45 Sent To  
Notes
2002-12-26 00:00:00REVISION S-1.S-2 DATED 11-13-02
 MECHANICAL UNIT STANDS

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2002-08-02 Cont ID  
Sent By bstaples Date 2002-08-02 Time 09:15 Rev Time 2.00
Received By bstaples Date   Time   Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2002-07-01 Cont ID  
Sent By bstaples Date 2002-07-01 Time 15:19 Rev Time 2.00
Received By bstaples Date   Time   Sent To  
Notes
2002-07-01 00:00:00FIRST REVIEW 7/1/02
 1. SHEET, S-1 ENGINEER OF RECORD TO
 PROVIDE STRUCTURAL ANALYSIS THAT
 EXISTING STRUCTURE WILL SUPPORT THE
 NEW LOADS IMPOSED BY THE BREWREY
 WITHOUT ALTERATION OF THE EXISTING
 BUILDING.
 2. SHEET, S-2 STRUCTURAL ENGINEER TO
 CERTIFY THAT THE TOP AND BOTTOM CORDS
 OF THE TRUSSES WILL TAKE THE NEW LOADS
 TO BE IMPOSED.
 3. SHEET, E-4.03 MEZZANINE, PROVIDE
 STRUCTURAL DESIGN FOR A MINUMIN OF 125
 POUNDS PER SQUARE FOOT OR IF HIGHER
 LOADS THE THE ACTUCAL LOAD IMPOSED.
 4. SHEET, M-3.02 IS INDICATED AS
 REQUIRED FOR MEZZANINE ON SHEET
 M-2.03 SHEET NOT SUBMITTED, REQUIRED TO
 REVIEW
 MEZZANINE CONSTRUCTION.
 5. SHEET A-1.01 INDICATES TWO MECHANICAL
 PLATFORMS INDICATE ALL STRUCTURAL
 DESIGN FOR BOTH AND DETAIL ACCESS.
 DESIGN FOR CODE CONFORMITY.
 NOTE: ALL DESIGNS CERTIFICATION ARE TO
 BE IN CONFORMITY WITH THE FLORIDA
 BUILDING CODE.

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2003-04-30 Cont ID  
Sent By dpalmer Date 2003-04-30 Time 07:50 Rev Time 0.33
Received By dpalmer Date 2003-04-30 Time 07:50 Sent To  
Notes
2003-04-30 00:00:00REV TO NOTES ONLY
 NO CORRECTIONS FROM LAST PLAN.

Review Stop E ELECTRICAL
Rev No 3 Status F Date 2003-01-28 Cont ID  
Sent By sthyng Date 2003-04-28 Time 09:21 Rev Time 0.50
Received By dpalmer Date 2003-01-28 Time 07:49 Sent To  
Notes
2003-01-28 00:00:00************ UNSAT ****************
  
 1)NOTE: PLEASE SEE EQUIPMENT SHEDULE
 AND PANEL SCHEDULE. PLEASE SEE GLYCOL
 CHILLER, PANEL SHOWS 35A OCP AND EQUIP-
 -MENT SCHEDULE SHOWS A 45A LOAD??
  
 2)NOTE; PLEASE SHOW CIRCUIT #'S FOR
 EMLT/EXT LTS. 700-12E.
 CLARIFY TYPE OF FIXTURES INSTALLED.
  
 3)NOTE: PLEASECLARIFY "LOCATION" TYPE
 SHOWN ON PLAN PER NECART:500. PLANS
 SHOW CLASS 1 DIV 1. PLEASE VERIFY FIELD
 CONDITIONS AND CHECK ART 500 FOR
 POSSIBLE OTHER CLASS LOCATION. IT HAS
 BEEN NOTED BY INSPECTOR THAT WIRING IS
 NOT PER CLASS 1 DIV 1 AS NOTED ON PLAN??
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-659-8096 EXT 8372

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2002-07-30 Cont ID  
Sent By dpalmer Date 2002-07-30 Time 12:41 Rev Time 0.00
Received By dpalmer Date 2002-07-30 Time 12:41 Sent To  
Notes
2002-07-30 00:00:00********** NOTE **********
  
 PLEASE NOTE THAT ALL "OLD" E -SHEETS
 NEED TO BE TAKEN OUT OF SETS.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2002-07-03 Cont ID  
Sent By dpalmer Date 2002-07-03 Time 06:54 Rev Time 0.00
Received By dpalmer Date 2002-07-03 Time 06:54 Sent To  
Notes
2002-07-03 00:00:00************** UNSAT ****************
  
 1)NOTE: PLEASE SHOW/CLARIFY LOCATIONS
 PER ART 500 NEC. HAZARDOUS LOCATIONS FOR
 GRAIN/MIXING/GRINDING???
  
 2)NOTE: PLEASE CLARIFY AND LABEL TRANS-
 -FORMERS AT THEIR LOCATIONS. PLEASE
 NOTE TRANS. BEING SHOWN IN TWO LOCATIONS
 ??
  
 3)NOTE: PLEASE SEPARATE LINE DIAGRAM FOR
 SERVICES EQUIPMENT BEING INSTALLED UNDER
 THIS PERMIT.
  
 4)NOTE: PLEASE SUBMIT AIC RATINGS FOR
 ALL NEW EQUIPMENT BEING INSTALLED?
 110-9
  
 5) NOTE: PLEASE SHOW ALL CONTINUOUS AT
 125%. (LIGHTING ETC)
 215-2,215-3,230-42
  
 6) NOTE: PLEASE SHOW CALCULATIONS FOR
 TRACK LIGHTING PER 220-12B.
  
 7)NOTE: PLEASE CLARIFY GROUNDING OF
 TRANSFORMERS PER 250-30
  
 8 )NOTE: PLEASE NOTE THAT THE LOAD
 CALCULATIONS NEED TO BE SHOWN. SQ FT/
 RECEPT LOADS ETC. PER 220-3,220-10,
 220-11, 220-13. (215-5)
 PLEASE CLARIFY ALL SHOWN AT CONNECTED
 LOAD?
  
 9)NOTE: PLEASE CLARIFY OCP FOR TEMP FEED
 TO "M2". PLEASE INDICATE LOCATION OF
 "EXISTING" GUTTER ON SECOND FLR.?
 PLEASE NOTE LENGTH OF TAPPED CONDUCTORS
 PER 240-21. RISER SHOWS 100A #3`S WITH
 A 600A FEED? PLEASE CLARIFY OCP AT
 "M3" SHOWN AS 200A /ALSO NOTE TAPPED
 CONDUCTOR LENGTH? PER 240-21
  
 10)NOTE: PLEASE NOTE THAT REVIEW FOR
 RISER DIAGRAM FOR FUTURE REST. WILL NOT
 BE REVIEWED AT THIS TIME. (NOT COMPLETE)
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-659-8096 EXT 8372

Review Stop ENG ENGINEERING CSD
Rev No 1 Status N Date 2002-06-26 Cont ID  
Sent By mamini Date 2002-06-26 Time 11:08 Rev Time 0.00
Received By mamini Date 2002-06-26 Time 11:07 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2002-08-02 Cont ID  
Sent By mcarsill Date 2002-08-02 Time 08:53 Rev Time 0.00
Received By mcarsill Date 2002-08-02 Time 08:53 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2002-07-03 Cont ID  
Sent By mcarsill Date 2002-07-03 Time 10:14 Rev Time 0.00
Received By mcarsill Date 2002-07-03 Time 10:14 Sent To  
Notes
2002-07-03 00:00:001) PLEASE PROVIDE DETAILS ON BREWERY
 EQUIPMENT. THIS OFFICE NEEDS HEIGHTS
 AND WIDTHS OF EQUIPMENT. PLEASE
 PROVIDE DIMENSIONS OF EQUIPMENT WITH
 REGARDS TO EXITING WITHIN THE BREWERY.
  
 2) PLEASE INDICATE INTERIOR FINISH
 CLASSIFICATION INFORMATION FOR WALLS
 AND CEILINGS OF THE BREWERY.
  
 3) PLEASE INDICATE WHAT "TEMPORARY"
 PARTITION MEANS IN DURATION.
  
 4) WHAT TYPE OF MATERIALS WILL BE USED
 FOR THE TEMPORARY PARTITION.
  
 MIKE CARSILLO, ASSISTANT FIRE MARSHAL
 659-8096,EXT.8497
 835-2910

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-04-28 Cont ID  
Sent By sthyng Date 2003-04-28 Time 09:21 Rev Time 0.00
Received By sthyng Date 2003-04-28 Time 09:21 Sent To E
Notes
2003-04-28 00:00:00TO DP DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-01-30 Cont ID  
Sent By dpalmer Date 2003-01-30 Time 15:33 Rev Time 0.00
Received By dpalmer Date 2003-01-30 Time 15:33 Sent To M
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 3 Status N Date 2003-01-23 Cont ID  
Sent By dpalmer Date 2003-01-30 Time 15:33 Rev Time 1.25
Received By pkrauss Date 2003-01-23 Time 10:11 Sent To  
Notes
2003-01-23 00:00:00PLANS SUBMITTED FOR BREWERY PIPING &
 ASSEMBLY.PLEASE CLARIFY THE FOLLOWING
 INFORMATION:
  
 1. LOCATION OF REMOTE GLYCOL CHILLER.
 2. LOCATION OF BOILER.
 3. PROVIDE INFORMATION ON PIPING (I.E.
 MATERIAL, SIZE, LAYOUT).
 4. PROVIDE SUBMITTALS FOR ALL EQUIPMENT,
 VALVES, STRAINERS, FLEX CONNECTORS,
 ETC.
  
 THIS INFORMATION WAS NEVER SUBMITTED OR
 REVIEWED.MECHANICAL PERMITS ISSUED
 THUS FAR WERE FOR THE HVAC.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT 659-8096
 EXT. 8388.

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2002-08-01 Cont ID  
Sent By pkrauss Date 2002-08-01 Time 11:14 Rev Time 0.40
Received By pkrauss Date 2002-08-01 Time 11:14 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2002-07-02 Cont ID  
Sent By ndenmark Date 2002-07-02 Time 06:50 Rev Time 0.50
Received By ndenmark Date 2002-07-02 Time 06:49 Sent To  
Notes
2002-07-02 00:00:00DENIED:
  
 PROVIDE INFORMATION ON EQUIPMENT
 MOUNTING OR SUPPORT DETAILS.
  
 PROVIDE OUTSIDE AIR CALCULATION FOR
 AHU-4 SHOWING COMPLIANCE WITH TABLE
 403.3 OF THE FBC(M) 2001.
  
 NOTE: SEPARATE PERMITS WITH PLANS
 REQUIRED FOR WALK IN COOLERS FREEZERS,
 HOODS SUPPRESSION SYSTEMS.

Review Stop P PLUMBING
Rev No 2 Status P Date 2002-08-01 Cont ID  
Sent By kstevens Date 2002-08-01 Time 11:52 Rev Time 0.00
Received By kstevens Date 2002-08-01 Time 11:52 Sent To  
Notes
2002-08-01 00:00:00PASSED/PROVISO
  
 WATER HAMMER ARRESTORS SHALL BE LOCATED
 NEAR FIXTURES IN AN "EFFECTIVE RANGE"
 NOT AT TOP OF DROP. PDI-WH 201/MANUF.
 INSTRUCTIONS.

Review Stop P PLUMBING
Rev No 1 Status F Date 2002-07-10 Cont ID  
Sent By kstevens Date 2002-07-10 Time 11:33 Rev Time 0.00
Received By kstevens Date 2002-07-10 Time 11:33 Sent To  
Notes
2002-07-10 00:00:00DENIED
 REFERENCE: FBC-2001 CHAPTER 11
 FBC-2001 PLUMBING
  
 1) SHTS LS-1.01 & A-5.01 WOMEN'S TOILET
 ROOM #011. THE ACCESSIBLE W/C SHALL BE
 LOCATED IN THE CORNER DIAGONAL TO THE
 DOOR. SEC. 11-4.17.3 & FIG. 30E.
 2) SHT A-5.01 PLEASE SHOW CLEAR FLOOR
 SPACE FOR HDCP FIXTURES. 11-4.16.2 W/C,
 11-4.18.3 URNAL, & 11-4.19.3 LAV.
 3) SHT A-5.01 DETAIL #3, TOILET ROOM EL-
 EVATION (H), URNAL HEIGHT SHALL BE 17"
 PER 11-4.18.2
 4) SHT A-5.01 DETAIL (I), W/C TO BE 1'6"
 TO CENTER OFF WALL NOT 1'8" AS SHOWN.
 SEE FIG. 30E.
 5) PLEASE SUBMITSANITARY AND WATER
 RISER DIAGRAMS FOR TOILET ROOMS AND
 BREWERY.
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377